Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/17/2025 Last Data Refresh: 05/16/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Bulk Storage Facility | ||||||||
County | Putnam | Status | OPEN | ||||||||
ID | 8515743 | Latitude | 29° 39' 30.4609 | ||||||||
Name |
LEWIS OIL CO 893 HWY 19 N |
Longitude | 81° 40' 2.1577 | ||||||||
PALATKA, FL 32177 | LL Method | DPHO | |||||||||
Contact | WENDA LEWIS EXT 225 | LL Status | REVIEWED | ||||||||
Phone | (352) 376-3293 | Status Date | 08/05/2003 | ||||||||
Account Owner Information | |||||||||||
Name | LEWIS OIL CO INC PO BOX 141286 GAINESVILLE, FL 32614 |
Effective Date | 05/20/1994 | ||||||||
Contact | WENDA LEWIS (MGR) | ||||||||||
Phone | (352) 376-3293 | ||||||||||
WLEWIS@LEWISOILCO.COM | |||||||||||
Placard # / Date | 701581 - 10/02/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | LEWIS OIL CO INC PO BOX 141286 GAINESVILLE, FL 32614 |
Effective Date | 08/13/2003 | ||||||||
Contact | WENDA LEWIS (MGR) | ||||||||||
Phone | (352) 376-3293 | ||||||||||
WLEWIS@LEWISOILCO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 8000 | Vehicular Diesel (D) | 02/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 15000 | Unleaded Gas (B) | 09/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 15000 | Kerosene (K) | 07/01/1996 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (L) Compartmented (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 17000 | Vehicular Diesel (D) | 02/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 15000 | Vehicular Diesel (D) | 02/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 15000 | Unleaded Gas (B) | 02/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 10000 | Unleaded Gas (B) | 02/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 3000 | Unleaded Gas (B) | 08/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass (F) Double wall |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 3000 | Unleaded Gas (B) | 08/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass (F) Double wall |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 5000 | Unleaded Gas (B) | 08/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass (F) Double wall |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Vehicular Diesel (D) | 08/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass (F) Double wall |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 3000 | Fuel Oil - Distribution (N) | 08/01/1983 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (A) Abv, no soil contact | (I) Not required | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 06/14/2020 | 06/14/2022 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2019 | 05/14/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2018 | 05/14/2019 | ILLINOIS UNION | ||||||||
INSURANCE | 05/14/2016 | 05/14/2018 | ACE | ||||||||
INSURANCE | 01/31/2015 | 05/14/2016 | AIG | ||||||||
INSURANCE | 01/31/2015 | 01/31/2016 | AIG | ||||||||
INSURANCE | 01/31/2014 | 01/31/2015 | AIG | ||||||||
INSURANCE | 01/31/2013 | 01/31/2014 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/31/2012 | 01/31/2013 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/31/2010 | 01/31/2011 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/31/2009 | 01/31/2010 | AIG | ||||||||
INSURANCE | 01/31/2008 | 01/31/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 02/01/2006 | 02/02/2006 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes ANTI-SIPHON VALVES HAVE NOT BEEN INSTALLED. | |||||||||||
TCR | 12/20/2005 | 12/20/2005 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 0/7 | COMPLIANCE ASSURANCE | |||||
Completion Notes ANTI-SIPHON VALVES HAVE NOT BEEN INSTALLED ON ANY TANKS AT SITE. | |||||||||||
WLI | 12/20/2005 | 12/20/2005 | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 11/22/2005 | 11/22/2005 | IN-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes NEW PAINT ON TANKS AND CONTAINMENT AREA HAS BEEN APPROVED BY ENGINEER BY WRITTEN LETTER 11/21/05. | |||||||||||
TCR | 11/01/2005 | 11/15/2005 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes FIELD VISIT FOUND NO ANTI-SIPHON VALVES ON ANY OF THE 7-SEVEN TANKS FOR PIPING GOING FROM TOP OF TANKS TO UNDERGROUND TO ENVIRON SUMP CONTAINMENTS. | |||||||||||
RRBD | 09/20/2005 | 11/28/2005 | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 09/14/2005 | 09/14/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO RECORDS AVAILABLE FOR FOR CONTAINMENT RECERTIFICATION OR EVIDENCE THAT TANKS HAVE BEEN REPAINTED OVER RUST SECTIONS. | |||||||||||
TCI | 07/21/2005 | 07/21/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PAINT PEELING OFF SIDES AND TOP OF TANKS,CONTAINMENT AREA HAS BEEN REPAIRED IN AREAS AND NEEDS ENGINEER APPROVAL THAT IT STILL MEETS ACI224R-89 STANDARDS. | |||||||||||
TCI | 07/15/2004 | 07/16/2004 | IN-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/22/2003 | 07/22/2003 | IN-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/16/2002 | 07/17/2002 | IN-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
TCR | 09/24/2001 | 09/25/2001 | IN-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/18/2001 | 07/20/2001 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
TCR | 07/20/2000 | 07/21/2000 | IN-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/18/2000 | 07/21/2000 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
TCR | 04/03/2000 | 04/05/2000 | IN-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
TCR | 09/22/1999 | 09/22/1999 | IN-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/10/1999 | 08/10/1999 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 08/10/1999 | 08/10/1999 | FLOWERS_D | 7/0 | COMPLIANCE ASSURANCE | ||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 11/07/2022 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 02/09/2022 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
TCAR | 02/09/2022 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Discharge Reporting | 02/09/2022 | Satisfied | HARRINGTON_RD_1 | Discharge | |||||||
Letter | 02/09/2022 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Electronic Communication | 11/07/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 11/07/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 11/07/2021 | Major Out of Compliance | HARRINGTON_RD_1 | 7/0 | Routine Compliance | ||||||
Electronic Communication | 11/07/2021 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Issue Document | 01/19/2021 | Satisfied | HARRIS_MJ | Routine Compliance | |||||||
Enforcement Tracking | 11/24/2020 | Closed Without Enforcement | COLE_K | Enforcement | |||||||
Letter | 11/24/2020 | Satisfied | COLE_K | Enforcement | |||||||
Electronic Communication | 02/24/2020 | Satisfied | COLE_K | Enforcement | |||||||
Phone Conversation | 02/24/2020 | Satisfied | COLE_K | Enforcement | |||||||
Phone Conversation | 02/19/2020 | Satisfied | COLE_K | Enforcement | |||||||
Enforcement Referral | 12/16/2019 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 12/08/2019 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 02/17/2019 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 02/17/2019 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 02/17/2019 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 02/17/2019 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 02/17/2019 | Minor Out of Compliance | HARRINGTON_RD_1 | 7/0 | Routine Compliance | ||||||
Site Inspection | 11/04/2018 | In Compliance | HARRINGTON_RD_1 | 7/0 | Discharge | ||||||
Document Management | 11/04/2018 | Satisfied | HARRINGTON_RD_1 | Discharge | |||||||
Record Document | 09/02/2018 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Record Document | 06/24/2016 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Site Inspection | 05/13/2016 | In Compliance | HARRINGTON_RD_1 | 0/0 | Closure | ||||||
Electronic Communication | 05/13/2016 | Satisfied | HARRINGTON_RD_1 | Closure | |||||||
Site Inspection | 05/13/2016 | In Compliance | HARRINGTON_RD_1 | 7/0 | Installation | ||||||
Letter | 12/10/2015 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 12/10/2015 | Minor Out of Compliance | HARRINGTON_RD_1 | 7/0 | Routine Compliance | ||||||
Record Document | 05/16/2014 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 05/14/2014 | In Compliance | HARRINGTON_RD_1 | 7/0 | Routine Compliance | ||||||
Electronic Communication | 05/14/2014 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Meeting | 05/13/2013 | Satisfied | DEFALCO_L | QA/QC | |||||||
Site Inspection | 04/17/2013 | In Compliance | CERIC_M_1 | 7/0 | Non-Compliance | ||||||
Record Document | 03/04/2013 | Satisfied | CERIC_M_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/20/2013 | Satisfied | CERIC_M_1 | Routine Compliance | |||||||
Site Inspection | 02/19/2013 | Major Out of Compliance | CERIC_M_1 | 7/0 | Routine Compliance | ||||||
Letter | 02/19/2013 | Satisfied | CERIC_M_1 | Non-Compliance | |||||||
Record Document | 06/07/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 01/26/2011 | Minor Out of Compliance | BARNETT_PC_1 | 7/0 | Routine Compliance | ||||||
Letter | 01/26/2011 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Issue Document | 05/14/2010 | Satisfied | DEFALCO_L | Enforcement | |||||||
Site Inspection | 12/23/2009 | In Compliance | BARNETT_PC_1 | 7/0 | Routine Compliance | ||||||
Site Inspection | 09/05/2008 | In Compliance | BARNETT_PC_1 | 7/0 | Routine Compliance | ||||||
Enforcement Tracking | 04/15/2008 | Closed With Enforcement | DEFALCO_L | Enforcement | |||||||
Site Inspection | 04/11/2008 | In Compliance | BARNETT_PC_1 | 7/0 | Non-Compliance | ||||||
Enforcement Referral | 10/23/2007 | Accepted | DEFALCO_L | Enforcement | |||||||
Letter | 08/23/2007 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 08/14/2007 | Minor Out of Compliance | BARNETT_PC_1 | 7/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/25/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/19/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Record Document | 01/08/2007 | Satisfied | DOHANEY_T | Enforcement | |||||||
Issue Document | 01/08/2007 | Satisfied | DEFALCO_L | Enforcement | |||||||
Site Inspection | 08/29/2006 | Minor Out of Compliance | FLOWERS_D | 7/0 | Non-Compliance | ||||||
Record Document | 08/11/2006 | Satisfied | DOHANEY_T | Non-Compliance | |||||||
Issue Document | 08/11/2006 | Satisfied | DOHANEY_T | Enforcement | |||||||
Site Inspection | 08/09/2006 | Minor Out of Compliance | DEFALCO_L | 7/0 | Enforcement | ||||||
Letter | 07/27/2006 | Satisfied | FLOWERS_D | Non-Compliance | |||||||
Site Inspection | 07/27/2006 | Minor Out of Compliance | FLOWERS_D | 7/0 | Routine Compliance | ||||||
Site Inspection | 05/26/2006 | Minor Out of Compliance | FLOWERS_D | 7/0 | Non-Compliance | ||||||
Letter | 05/01/2006 | Satisfied | FLOWERS_D | Non-Compliance | |||||||
Site Inspection | 05/01/2006 | Minor Out of Compliance | FLOWERS_D | 7/0 | Non-Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/07/2021 | 7055 | SNC-B | 3.3 Pressurized piping not installed with line leak detectors or does not meet requirements of paragraph 62-762.601(4)(b). | Replace the line leak detectors on small diameter pressurized piping. provide documentation and test results. | |||||||
11/07/2021 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove liquid from the components listed above. Provide documentation. | |||||||
11/07/2021 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair or replace the transition sump sensors. Alternately, monthly visuals can be done for the sumps as release detection. Provide documentation or resolution. | |||||||
11/07/2021 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Perform Integrity tests of the piping transition sumps and dispenser liners (every 3 years). Provide result documentation. | |||||||
11/07/2021 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair the leaking meter in dispenser 6. Provide documentation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
02/28/1995 | COMPLETED | 75 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||