Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 03/19/2025 Last Data Refresh: 03/18/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Putnam | Status | OPEN | ||||||||
ID | 8515788 | Latitude | 29° 35' 15.2497 | ||||||||
Name |
LEWIS OIL CO. INC. 298 HWY 21 S |
Longitude | 81° 58' 24.304 | ||||||||
HAWTHORNE, FL 32640 | LL Method | DPHO | |||||||||
Contact | WENDA LEWIS | LL Status | REVIEWED | ||||||||
Phone | (352) 376-3293 | Status Date | 06/02/2003 | ||||||||
Account Owner Information | |||||||||||
Name | LEWIS OIL CO INC PO BOX 141286 GAINESVILLE, FL 32614 |
Effective Date | 11/07/2023 | ||||||||
Contact | WENDA LEWIS (MGR) | ||||||||||
Phone | (352) 376-3293 | ||||||||||
WLEWIS@LEWISOILCO.COM | |||||||||||
Placard # / Date | 701584 - 10/02/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | LEWIS OIL CO INC PO BOX 141286 GAINESVILLE, FL 32614 |
Effective Date | 11/07/2023 | ||||||||
Contact | WENDA LEWIS (MGR) | ||||||||||
Phone | (352) 376-3293 | ||||||||||
WLEWIS@LEWISOILCO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 8000 | Unleaded Gas (B) | 10/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system |
(4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 8000 | Unleaded Gas (B) | 10/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system |
(4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 10000 | Vehicular Diesel (D) | 11/01/2005 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (D) Unknown (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system |
(4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 20000 | Vehicular Diesel (D) | 07/01/1986 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 550 | Kerosene (K) | 01/01/1991 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 550 | Vehicular Diesel (D) | 01/01/1991 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Vehicular Diesel (D) | 07/01/1964 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Kerosene (K) | 07/01/1964 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (J) Pressurized piping system (L) Bulk product system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Unleaded Gas (B) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 6000 | Unleaded Gas (B) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 550 | Vehicular Diesel (D) | 01/01/1991 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 01/19/2020 | 01/19/2024 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 01/19/2019 | 01/19/2024 | |||||||||
INSURANCE | 01/19/2016 | 01/19/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/19/2015 | 01/19/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/19/2014 | 01/19/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/19/2013 | 01/19/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/19/2011 | 01/19/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/19/2010 | 01/19/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/19/2009 | 01/19/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/29/1991 | 08/29/1996 | FPLIPA | ||||||||
INSURANCE | 04/26/1991 | 04/26/1993 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TIN | 12/02/2005 | 12/06/2005 | IN-COMPLIANCE | FLOWERS_D | 4/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLED NEW HIGHLAND VERTICAL STEEL TANK EQ-573 WITH CAPACITY OF 10,000 GAL. FOR ON ROAD DISEL. REGISTRATION FORM UPDATED AND INSURANCE CARRIER HAS BEEN NOTIFIED OF CHANGES. | |||||||||||
TXI | 12/02/2005 | 12/06/2005 | IN-COMPLIANCE | FLOWERS_D | 5/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes REMOVED T#1 AND T#2 BOTH 6,000 GALLON INSTALLED7/01/64. INSURANCE CARRIER WILL NOT COVER IN POLICY AFTER JAN. 19,2006. | |||||||||||
TCI | 08/16/2005 | 08/17/2005 | IN-COMPLIANCE | FLOWERS_D | 5/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes BUREAU OF EMERG.RESPONSE CASE #04-11-0243, DIESEL SPILL 9/16/04 HAS BEEN CLOSED-BY MR. KENTON BROWN. | |||||||||||
DCS | 03/01/2005 | 03/08/2005 | DOHANEY_T | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes EMERGENCY RESPONSE SECTION CLOSED CASE BASED ON AAG REPORT DATED 12/24/04. | |||||||||||
SV | 09/20/2004 | 09/21/2004 | FLOWERS_D | 5/0 | DISCHARGE PROJECT | ||||||
Completion Notes SOIL REMOVAL FROM SPILL OF DIESEL HAS BEEN COMPLETED. NO PRODUCT WAS SEEN DURING SITE VISIT TODAY. MANIFEST OF REMOVAL WILL BE FORWARDED TO AGENCY. | |||||||||||
TDI | 09/16/2004 | 09/16/2004 | IN-COMPLIANCE | FLOWERS_D | 5/0 | DISCHARGE PROJECT | |||||
Completion Notes DISCHARGE BY HUMAN ERROR, PUMP SWITCH WAS NOT TURNED OFF PRIOR TO MAIN BREAKER BEING ACTIVATED. LOSS OF 339 GALLONS OF ON ROAD DISEL FROM OVERHEAD LOADING ARM USED TO FUEL TANKER TRUCKS | |||||||||||
TCI | 08/25/2004 | 08/27/2004 | IN-COMPLIANCE | FLOWERS_D | 5/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/25/2003 | 08/26/2003 | IN-COMPLIANCE | FLOWERS_D | 5/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/08/2002 | 08/08/2002 | IN-COMPLIANCE | FLOWERS_D | 5/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/15/2001 | 08/17/2001 | IN-COMPLIANCE | FLOWERS_D | 5/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/24/2000 | 08/25/2000 | IN-COMPLIANCE | FLOWERS_D | 5/0 | COMPLIANCE ASSURANCE | |||||
TCR | 01/07/2000 | 01/18/2000 | IN-COMPLIANCE | FLOWERS_D | 5/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/31/1999 | 08/31/1999 | IN-COMPLIANCE | FLOWERS_D | 5/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 04/22/2024 | Satisfied | MILLS_MM | Enforcement | |||||||
Phone Conversation | 01/17/2024 | Satisfied | MILLS_MM | Enforcement | |||||||
Letter | 12/21/2023 | Satisfied | MILLS_MM | Enforcement | |||||||
Enforcement Referral | 06/13/2023 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 05/08/2023 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 05/08/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 05/08/2023 | Major Out of Compliance | HARRINGTON_RD_1 | 4/0 | Routine Compliance | ||||||
Electronic Communication | 06/30/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Record Document | 06/23/2019 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 01/06/2019 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 12/30/2018 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Meeting | 12/30/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 12/30/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 12/28/2018 | Major Out of Compliance | HARRINGTON_RD_1 | 4/0 | Routine Compliance | ||||||
Phone Conversation | 10/27/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 10/27/2015 | In Compliance | HARRINGTON_RD_1 | 6/0 | Routine Compliance | ||||||
Phone Conversation | 09/21/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/21/2013 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 10/21/2013 | In Compliance | HARRINGTON_RD_1 | 6/0 | Routine Compliance | ||||||
Record Document | 10/07/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 09/22/2011 | Minor Out of Compliance | HARRINGTON_RD_1 | 6/0 | Routine Compliance | ||||||
Letter | 09/22/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 10/19/2010 | In Compliance | HARRINGTON_RD_1 | 6/0 | Routine Compliance | ||||||
Discharge Reporting | 10/30/2009 | Satisfied | BARNETT_PC_1 | Discharge | |||||||
Site Inspection | 07/13/2009 | In Compliance | BARNETT_PC_1 | 4/0 | Discharge | ||||||
Site Inspection | 02/19/2009 | In Compliance | BROWN_JZ | 4/0 | Routine Compliance | ||||||
Site Inspection | 01/24/2008 | In Compliance | BARNETT_PC_1 | 4/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/08/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/26/2006 | Satisfied | FLOWERS_D | Routine Compliance | |||||||
Site Inspection | 08/24/2006 | In Compliance | FLOWERS_D | 4/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/08/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide current hydro tests of the dispenser liners and the concrete fill containment box. (The tests are required every 3 years). | |||||||
12/23/2018 | 5057 | SNC-B | 3.5 Pressurized small diameter piping not installed with line leak detectors and meeting requirements. | Install line leak detectors on the two underground, small diameter, pressurized piping. Provide test result documentation. test every 12 months. Maintain on file for 3 years. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/15/2009 | COMPLETED | ||||||||||
09/16/2004 | COMPLETED | 50 | |||||||||
10/21/1991 | INACTIVE | 56 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
12/20/1988 | ACTIVE | 56 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||