Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northeast   Type    Retail Station
 
County Putnam   Status    OPEN
 
ID 8515793   Latitude    29° 42' 35.5129
 
Name MELROSE SRVC STATION
326 HWY 26
Longitude    82° 2' 40.3006
  MELROSE, FL 32666 LL Method    DPHO
 
Contact ROBIN / MARK CHIAPPINI   LL Status    REVIEWED
 
Phone (352) 475-9496   Status Date    08/24/2015
 
Account Owner Information
 
Name CHIAPPINI, ROBIN
PO BOX 170
MELROSE, FL 32666-170
Effective Date    07/01/1985
 
Contact ROBIN CHIAPPINI
 
Phone (352) 475-9496
 
Email
  Placard # / Date    671099 - 10/19/2023
Property Owner Information
 
Name CHIAPPINI, ROBIN
PO BOX 170
MELROSE, FL 32666-170
Effective Date    04/15/2003
 
Contact ROBIN CHIAPPINI
 
Phone (352) 475-9496
 
Email
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
4 1000 Kerosene (K) 06/01/1983 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(4) Visual inspect dispenser liners
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
7 10000 Unleaded Gas (B) 03/01/1998 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(L) Compartmented
(P) Level gauges/alarms
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
8 1000 Vehicular Diesel (D) 02/01/1998 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(4) Visual inspect dispenser liners
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
1 2000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(M) Spill containment bucket
  (B) Steel/galvanized metal
(I) Suction piping system
(8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
2 2000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(M) Spill containment bucket
  (B) Steel/galvanized metal
(I) Suction piping system
(8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
3 3000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(M) Spill containment bucket
  (B) Steel/galvanized metal
(I) Suction piping system
(8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
5 500 Kerosene (K) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal
(I) Suction piping system
(8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
6 500 Kerosene (K) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
 
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   06/11/2016 06/11/2017 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   12/17/2014 12/17/2015 COMMERCE & INDUSTRY
INSURANCE   02/27/2013 02/27/2014 COMMERCE & INDUSTRY
INSURANCE   02/27/2011 02/27/2012 COMMERCE & INDUSTRY
INSURANCE   02/27/2009 02/27/2010 COMMERCE & INDUSTRY
INSURANCE   02/02/1999 02/02/2000 COMMERCE & INDUSTRY
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 04/29/2005 04/29/2005 IN-COMPLIANCE FLOWERS_D 2/1 COMPLIANCE ASSURANCE
 
TCI 04/06/2004 04/07/2004 IN-COMPLIANCE FLOWERS_D 2/1 COMPLIANCE ASSURANCE
 
TCI 04/08/2003 04/09/2003 IN-COMPLIANCE FLOWERS_D 2/1 COMPLIANCE ASSURANCE
 
TCI 02/05/2002 02/06/2002 IN-COMPLIANCE FLOWERS_D 2/1 COMPLIANCE ASSURANCE
 
TCR 04/25/2001 04/26/2001 IN-COMPLIANCE FLOWERS_D 2/1 COMPLIANCE ASSURANCE
 
NCLI 02/28/2001 02/28/2001 FLOWERS_D 2/1 COMPLIANCE ASSURANCE
 
TCI 02/27/2001 02/28/2001 MINOR OUT-OF-COMPLIANCE FLOWERS_D 2/1 COMPLIANCE ASSURANCE
 
TCI 01/04/2000 01/18/2000 IN-COMPLIANCE FLOWERS_D 2/1 COMPLIANCE ASSURANCE
 
TCR 03/29/1999 03/30/1999 IN-COMPLIANCE FLOWERS_D 2/1 COMPLIANCE ASSURANCE
 
TCI 03/29/1999 04/20/1999 IN-COMPLIANCE FLOWERS_D 0/0 COMPLIANCE ASSURANCE
 
TCI 01/11/1999 02/24/1999 SIGNIFICANT OUT-OF-COMPLIANCE FLOWERS_D 2/1 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Enforcement Referral 01/31/2025 Accepted HARRINGTON_RD_1 Enforcement
 
Letter 01/24/2025 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Electronic Communication 01/24/2025 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Site Inspection 01/24/2025 Major Out of Compliance HARRINGTON_RD_1 2/1 Routine Compliance
 
Enforcement Tracking 01/23/2025 Closed Without Enforcement JACKSON_SM Enforcement
 
Electronic Communication 08/27/2024 Satisfied JACKSON_SM Enforcement
 
Electronic Communication 07/17/2023 Satisfied JACKSON_SM Enforcement
 
Electronic Communication 07/17/2023 Satisfied JACKSON_SM Enforcement
 
Electronic Communication 03/19/2023 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Site Inspection 03/19/2023 Major Out of Compliance HARRINGTON_RD_1 2/1 Routine Compliance
 
Letter 08/09/2022 Satisfied HARRIS_MJ Enforcement
 
Electronic Communication 02/14/2021 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Electronic Communication 02/14/2021 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Site Inspection 02/14/2021 Major Out of Compliance HARRINGTON_RD_1 2/1 Routine Compliance
 
Letter 02/14/2021 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Enforcement Referral 07/28/2020 Accepted HARRINGTON_RD_1 Enforcement
 
Electronic Communication 06/21/2020 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Letter 06/10/2018 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Site Inspection 06/10/2018 Major Out of Compliance HARRINGTON_RD_1 2/1 Routine Compliance
 
Issue Document 05/20/2018 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Enforcement Tracking 01/03/2017 Closed Without Enforcement HILL_K Enforcement
 
Letter 12/30/2016 Satisfied DOHANEY_T Enforcement
 
Enforcement Referral 10/12/2016 Accepted HARRINGTON_RD_1 Enforcement
 
Letter 08/04/2016 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Site Inspection 05/02/2016 Major Out of Compliance HARRINGTON_RD_1 2/1 Routine Compliance
 
Letter 05/02/2016 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Phone Conversation 04/15/2016 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Letter 02/06/2015 Satisfied DOHANEY_T Enforcement
 
Record Document 02/02/2015 Satisfied DEFALCO_L Non-Compliance
 
Phone Conversation 01/28/2015 Satisfied DEFALCO_L Enforcement
 
Electronic Communication 01/28/2015 Satisfied DEFALCO_L Enforcement
 
Issue Document 01/28/2015 Satisfied DEFALCO_L Enforcement
 
Record Document 01/28/2015 Satisfied DEFALCO_L Enforcement
 
Enforcement Tracking 01/28/2015 Closed Without Enforcement DEFALCO_L Enforcement
 
Issue Document 12/29/2014 Satisfied DOHANEY_T Enforcement
 
Enforcement Referral 12/29/2014 Accepted DEFALCO_L Enforcement
 
Record Document 12/03/2014 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Site Inspection 11/13/2014 Minor Out of Compliance HARRINGTON_RD_1 2/1 Non-Compliance
 
Letter 11/03/2014 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Letter 06/04/2014 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Site Inspection 06/03/2014 Minor Out of Compliance HARRINGTON_RD_1 2/1 Routine Compliance
 
Record Document 10/15/2013 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Letter 06/21/2013 Satisfied CERIC_M_1 Non-Compliance
 
Emergency Preparedness Information 05/24/2013 Satisfied CERIC_M_1 Routine Compliance
 
Site Inspection 05/21/2013 Minor Out of Compliance CERIC_M_1 2/1 Routine Compliance
 
Enforcement Tracking 08/02/2012 Closed Without Enforcement DEFALCO_L Enforcement
 
Meeting 08/02/2012 Satisfied DEFALCO_L Enforcement
 
Issue Document 08/02/2012 Satisfied DEFALCO_L Enforcement
 
Record Document 06/25/2012 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Phone Conversation 03/19/2012 Satisfied DEFALCO_L Enforcement
 
Phone Conversation 01/10/2012 Satisfied DEFALCO_L Enforcement
 
Electronic Communication 01/10/2012 Satisfied DEFALCO_L Enforcement
 
Electronic Communication 01/10/2012 Satisfied DEFALCO_L Enforcement
 
Enforcement Referral 08/30/2011 Accepted DEFALCO_L Enforcement
 
Record Document 05/02/2011 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Letter 04/27/2011 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Letter 02/25/2011 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Site Inspection 02/25/2011 Minor Out of Compliance HARRINGTON_RD_1 2/1 Routine Compliance
 
Phone Conversation 05/14/2010 Satisfied DEFALCO_L Enforcement
 
Enforcement Tracking 02/01/2010 Closed Without Enforcement DEFALCO_L Enforcement
 
Record Document 02/01/2010 Satisfied DEFALCO_L Enforcement
 
Record Document 02/01/2010 Satisfied DEFALCO_L Enforcement
 
Enforcement Referral 12/18/2009 Accepted DOHANEY_T Enforcement
 
Letter 07/24/2009 Satisfied BARNETT_PC_1 Non-Compliance
 
Site Inspection 07/24/2009 Minor Out of Compliance BARNETT_PC_1 2/1 Non-Compliance
 
Phone Conversation 07/12/2009 Satisfied BARNETT_PC_1 Non-Compliance
 
Letter 06/17/2009 Satisfied BARNETT_PC_1 Non-Compliance
 
Letter 02/11/2009 Satisfied BARNETT_PC_1 Non-Compliance
 
Site Inspection 02/11/2009 Minor Out of Compliance BARNETT_PC_1 2/1 Routine Compliance
 
Letter 06/10/2008 Satisfied BARNETT_PC_1 Non-Compliance
 
Record Document 06/10/2008 Satisfied BARNETT_PC_1 Non-Compliance
 
Record Document 05/09/2008 Satisfied BARNETT_PC_1 Non-Compliance
 
Letter 01/04/2008 Satisfied BARNETT_PC_1 Non-Compliance
 
Site Inspection 01/04/2008 Minor Out of Compliance BARNETT_PC_1 2/1 Routine Compliance
 
Emergency Preparedness Information 05/23/2007 Satisfied BARNETT_PC_1 Routine Compliance
 
Emergency Preparedness Information 02/16/2007 Satisfied BARNETT_PC_1 Routine Compliance
 
Emergency Preparedness Information 09/22/2006 Satisfied FLOWERS_D Routine Compliance
 
Site Inspection 09/15/2006 In Compliance FLOWERS_D 2/1 Non-Compliance
 
Letter 06/12/2006 Satisfied FLOWERS_D Non-Compliance
 
Letter 06/12/2006 Satisfied FLOWERS_D Non-Compliance
 
Site Inspection 06/12/2006 Minor Out of Compliance FLOWERS_D 2/1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
01/24/2025 6072 Minor 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. Provide current Integrity Test documentation of the components listed above.
 
01/24/2025 6002 Minor 2.1 Operator Training records not available. Please provide A/B and C Level Tank Operator Certificates for the facility.
 
01/24/2025 6062 Minor 2.5 Release detection devices not tested annually. Provide current line leak detector test documentation.
 
01/24/2025 6005 Minor 2.4 Registration fees not paid (not receiving fuel). Please update the Tank Registration fees.
 
01/24/2025 6012 SNC-A 2.9 No financial responsibility instrument or expired instrument for > 180 days. Provide verification of Storage Tank Financial Responsibility.
 
01/24/2025 6053 Minor 4.7 Primary overfill protection not provided, registered, or tested as required. Provide current overfill prevention device test documentation.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
12/17/1986   COMPLETED 52 EARLY DETECTION INCENTIVE-ELIGIBLE