Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Putnam | Status | OPEN | ||||||||
ID | 8515793 | Latitude | 29° 42' 35.5129 | ||||||||
Name |
MELROSE SRVC STATION 326 HWY 26 |
Longitude | 82° 2' 40.3006 | ||||||||
MELROSE, FL 32666 | LL Method | DPHO | |||||||||
Contact | ROBIN / MARK CHIAPPINI | LL Status | REVIEWED | ||||||||
Phone | (352) 475-9496 | Status Date | 08/24/2015 | ||||||||
Account Owner Information | |||||||||||
Name | CHIAPPINI, ROBIN PO BOX 170 MELROSE, FL 32666-170 |
Effective Date | 07/01/1985 | ||||||||
Contact | ROBIN CHIAPPINI | ||||||||||
Phone | (352) 475-9496 | ||||||||||
Placard # / Date | 671099 - 10/19/2023 | ||||||||||
Property Owner Information | |||||||||||
Name | CHIAPPINI, ROBIN PO BOX 170 MELROSE, FL 32666-170 |
Effective Date | 04/15/2003 | ||||||||
Contact | ROBIN CHIAPPINI | ||||||||||
Phone | (352) 475-9496 | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 1000 | Kerosene (K) | 06/01/1983 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(4) Visual inspect dispenser liners (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Unleaded Gas (B) | 03/01/1998 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (L) Compartmented (P) Level gauges/alarms |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 1000 | Vehicular Diesel (D) | 02/01/1998 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(4) Visual inspect dispenser liners (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 2000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (I) Suction piping system |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 2000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (I) Suction piping system |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 3000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (I) Suction piping system |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 500 | Kerosene (K) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal (I) Suction piping system |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 500 | Kerosene (K) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 06/11/2016 | 06/11/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 12/17/2014 | 12/17/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/27/2013 | 02/27/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/27/2011 | 02/27/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/27/2009 | 02/27/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/02/1999 | 02/02/2000 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 04/29/2005 | 04/29/2005 | IN-COMPLIANCE | FLOWERS_D | 2/1 | COMPLIANCE ASSURANCE | |||||
TCI | 04/06/2004 | 04/07/2004 | IN-COMPLIANCE | FLOWERS_D | 2/1 | COMPLIANCE ASSURANCE | |||||
TCI | 04/08/2003 | 04/09/2003 | IN-COMPLIANCE | FLOWERS_D | 2/1 | COMPLIANCE ASSURANCE | |||||
TCI | 02/05/2002 | 02/06/2002 | IN-COMPLIANCE | FLOWERS_D | 2/1 | COMPLIANCE ASSURANCE | |||||
TCR | 04/25/2001 | 04/26/2001 | IN-COMPLIANCE | FLOWERS_D | 2/1 | COMPLIANCE ASSURANCE | |||||
NCLI | 02/28/2001 | 02/28/2001 | FLOWERS_D | 2/1 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/27/2001 | 02/28/2001 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 2/1 | COMPLIANCE ASSURANCE | |||||
TCI | 01/04/2000 | 01/18/2000 | IN-COMPLIANCE | FLOWERS_D | 2/1 | COMPLIANCE ASSURANCE | |||||
TCR | 03/29/1999 | 03/30/1999 | IN-COMPLIANCE | FLOWERS_D | 2/1 | COMPLIANCE ASSURANCE | |||||
TCI | 03/29/1999 | 04/20/1999 | IN-COMPLIANCE | FLOWERS_D | 0/0 | COMPLIANCE ASSURANCE | |||||
TCI | 01/11/1999 | 02/24/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | FLOWERS_D | 2/1 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 01/31/2025 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Letter | 01/24/2025 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 01/24/2025 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 01/24/2025 | Major Out of Compliance | HARRINGTON_RD_1 | 2/1 | Routine Compliance | ||||||
Enforcement Tracking | 01/23/2025 | Closed Without Enforcement | JACKSON_SM | Enforcement | |||||||
Electronic Communication | 08/27/2024 | Satisfied | JACKSON_SM | Enforcement | |||||||
Electronic Communication | 07/17/2023 | Satisfied | JACKSON_SM | Enforcement | |||||||
Electronic Communication | 07/17/2023 | Satisfied | JACKSON_SM | Enforcement | |||||||
Electronic Communication | 03/19/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 03/19/2023 | Major Out of Compliance | HARRINGTON_RD_1 | 2/1 | Routine Compliance | ||||||
Letter | 08/09/2022 | Satisfied | HARRIS_MJ | Enforcement | |||||||
Electronic Communication | 02/14/2021 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 02/14/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 02/14/2021 | Major Out of Compliance | HARRINGTON_RD_1 | 2/1 | Routine Compliance | ||||||
Letter | 02/14/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Enforcement Referral | 07/28/2020 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 06/21/2020 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 06/10/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 06/10/2018 | Major Out of Compliance | HARRINGTON_RD_1 | 2/1 | Routine Compliance | ||||||
Issue Document | 05/20/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Enforcement Tracking | 01/03/2017 | Closed Without Enforcement | HILL_K | Enforcement | |||||||
Letter | 12/30/2016 | Satisfied | DOHANEY_T | Enforcement | |||||||
Enforcement Referral | 10/12/2016 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Letter | 08/04/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 05/02/2016 | Major Out of Compliance | HARRINGTON_RD_1 | 2/1 | Routine Compliance | ||||||
Letter | 05/02/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Phone Conversation | 04/15/2016 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 02/06/2015 | Satisfied | DOHANEY_T | Enforcement | |||||||
Record Document | 02/02/2015 | Satisfied | DEFALCO_L | Non-Compliance | |||||||
Phone Conversation | 01/28/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Electronic Communication | 01/28/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Issue Document | 01/28/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Record Document | 01/28/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Enforcement Tracking | 01/28/2015 | Closed Without Enforcement | DEFALCO_L | Enforcement | |||||||
Issue Document | 12/29/2014 | Satisfied | DOHANEY_T | Enforcement | |||||||
Enforcement Referral | 12/29/2014 | Accepted | DEFALCO_L | Enforcement | |||||||
Record Document | 12/03/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 11/13/2014 | Minor Out of Compliance | HARRINGTON_RD_1 | 2/1 | Non-Compliance | ||||||
Letter | 11/03/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 06/04/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 06/03/2014 | Minor Out of Compliance | HARRINGTON_RD_1 | 2/1 | Routine Compliance | ||||||
Record Document | 10/15/2013 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 06/21/2013 | Satisfied | CERIC_M_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 05/24/2013 | Satisfied | CERIC_M_1 | Routine Compliance | |||||||
Site Inspection | 05/21/2013 | Minor Out of Compliance | CERIC_M_1 | 2/1 | Routine Compliance | ||||||
Enforcement Tracking | 08/02/2012 | Closed Without Enforcement | DEFALCO_L | Enforcement | |||||||
Meeting | 08/02/2012 | Satisfied | DEFALCO_L | Enforcement | |||||||
Issue Document | 08/02/2012 | Satisfied | DEFALCO_L | Enforcement | |||||||
Record Document | 06/25/2012 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Phone Conversation | 03/19/2012 | Satisfied | DEFALCO_L | Enforcement | |||||||
Phone Conversation | 01/10/2012 | Satisfied | DEFALCO_L | Enforcement | |||||||
Electronic Communication | 01/10/2012 | Satisfied | DEFALCO_L | Enforcement | |||||||
Electronic Communication | 01/10/2012 | Satisfied | DEFALCO_L | Enforcement | |||||||
Enforcement Referral | 08/30/2011 | Accepted | DEFALCO_L | Enforcement | |||||||
Record Document | 05/02/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 04/27/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 02/25/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 02/25/2011 | Minor Out of Compliance | HARRINGTON_RD_1 | 2/1 | Routine Compliance | ||||||
Phone Conversation | 05/14/2010 | Satisfied | DEFALCO_L | Enforcement | |||||||
Enforcement Tracking | 02/01/2010 | Closed Without Enforcement | DEFALCO_L | Enforcement | |||||||
Record Document | 02/01/2010 | Satisfied | DEFALCO_L | Enforcement | |||||||
Record Document | 02/01/2010 | Satisfied | DEFALCO_L | Enforcement | |||||||
Enforcement Referral | 12/18/2009 | Accepted | DOHANEY_T | Enforcement | |||||||
Letter | 07/24/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 07/24/2009 | Minor Out of Compliance | BARNETT_PC_1 | 2/1 | Non-Compliance | ||||||
Phone Conversation | 07/12/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Letter | 06/17/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Letter | 02/11/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 02/11/2009 | Minor Out of Compliance | BARNETT_PC_1 | 2/1 | Routine Compliance | ||||||
Letter | 06/10/2008 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Record Document | 06/10/2008 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Record Document | 05/09/2008 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Letter | 01/04/2008 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 01/04/2008 | Minor Out of Compliance | BARNETT_PC_1 | 2/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/16/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/22/2006 | Satisfied | FLOWERS_D | Routine Compliance | |||||||
Site Inspection | 09/15/2006 | In Compliance | FLOWERS_D | 2/1 | Non-Compliance | ||||||
Letter | 06/12/2006 | Satisfied | FLOWERS_D | Non-Compliance | |||||||
Letter | 06/12/2006 | Satisfied | FLOWERS_D | Non-Compliance | |||||||
Site Inspection | 06/12/2006 | Minor Out of Compliance | FLOWERS_D | 2/1 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/24/2025 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide current Integrity Test documentation of the components listed above. | |||||||
01/24/2025 | 6002 | Minor | 2.1 Operator Training records not available. | Please provide A/B and C Level Tank Operator Certificates for the facility. | |||||||
01/24/2025 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide current line leak detector test documentation. | |||||||
01/24/2025 | 6005 | Minor | 2.4 Registration fees not paid (not receiving fuel). | Please update the Tank Registration fees. | |||||||
01/24/2025 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Provide verification of Storage Tank Financial Responsibility. | |||||||
01/24/2025 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide current overfill prevention device test documentation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/17/1986 | COMPLETED | 52 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||