![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Retail Station | ||||||||
County | Seminole | Status | OPEN | ||||||||
ID | 8516588 | Latitude | 28° 45' 21.63 | ||||||||
Name |
CUMBERLAND FARMS #0968/200213 3800 ORLANDO DR |
Longitude | 81° 17' 16.71 | ||||||||
SANFORD, FL 32773-6183 | LL Method | DPHO | |||||||||
Contact | CUMBERLAND FARMS INC | LL Status | REVIEWED | ||||||||
Phone | (407) 302-6462 | Status Date | 06/16/2005 | ||||||||
Account Owner Information | |||||||||||
Name | YAQOOB, KHALID 3170 TALA LOOP LONGWOOD, FL 32779 |
Effective Date | 09/29/2015 | ||||||||
Contact | KHALID YAQOOB | PRABODH PATEL (BUYER'S ATTY) | ||||||||||
Phone | (407) 331-5505 | ||||||||||
AROOJ611@YAHOO.COM | |||||||||||
Placard # / Date | 682681 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CUMBERLAND FARMS INC 73 WILLIAM FRANKS DR West Springfield, MA 1089-2924 |
Effective Date | 03/05/2001 | ||||||||
Contact | ALEXANDRA BAUER | ||||||||||
Phone | (413) 781-0070 | ||||||||||
CUMBERLANDFARMS@ONEATLAS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 8000 | Unleaded Gas (B) | 07/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 8000 | Unleaded Gas (B) | 07/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 8000 | Unleaded Gas (B) | 07/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Unleaded Gas (B) | 10/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal | (8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Unleaded Gas (B) | 10/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal | (8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 8000 | Unleaded Gas (B) | 10/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal | (8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 04/16/2019 | 04/16/2022 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 04/16/2018 | 04/16/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 04/16/2017 | 04/16/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 04/16/2016 | 04/16/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 09/01/2014 | 08/31/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 09/01/2011 | 08/31/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 06/26/2006 | 06/26/2011 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 12/07/2005 | 12/07/2005 | IN-COMPLIANCE | BAUTISTA | 0/3 | COMPLIANCE ASSURANCE | |||||
LTR | 10/14/2005 | 10/18/2005 | PERRY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/07/2005 | 10/12/2005 | MINOR OUT-OF-COMPLIANCE | BAUTISTA | 0/3 | COMPLIANCE ASSURANCE | |||||
FR | 05/23/2005 | 05/23/2005 | IN-COMPLIANCE | BAUTISTA | 0/1 | COMPLIANCE ASSURANCE | |||||
TXI | 03/25/2005 | 04/01/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | PERRY | 0/1 | COMPLIANCE ASSURANCE | |||||
TIN | 03/25/2005 | 04/01/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | PERRY | 0/1 | COMPLIANCE ASSURANCE | |||||
TCR | 12/07/2004 | 12/13/2004 | IN-COMPLIANCE | BAUTISTA | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 09/14/2004 | 09/14/2004 | MINOR OUT-OF-COMPLIANCE | BAUTISTA | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 09/09/2003 | 09/09/2003 | IN-COMPLIANCE | BAUTISTA | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 09/18/2002 | 09/19/2002 | IN-COMPLIANCE | BAUTISTA | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/23/2001 | 10/25/2001 | IN-COMPLIANCE | PERRY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/18/2000 | 10/18/2000 | IN-COMPLIANCE | PERRY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/22/1999 | 10/26/1999 | IN-COMPLIANCE | PERRY | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 11/07/2024 | Accepted | RIVERA_JX_2 | Enforcement | |||||||
Letter | 10/25/2024 | Satisfied | PEREZ_EX_1 | Compliance Assistance | |||||||
Letter | 06/12/2024 | Satisfied | LAFON_AT_2 | Compliance Assistance | |||||||
Site Inspection | 06/04/2024 | Major Out of Compliance | LAFON_AT_2 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 06/04/2024 | Satisfied | LAFON_AT_2 | Routine Compliance | |||||||
Electronic Communication | 06/04/2024 | Satisfied | LAFON_AT_2 | Routine Compliance | |||||||
Electronic Communication | 07/14/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Letter | 07/14/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 07/11/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 04/27/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 03/16/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 02/18/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 12/14/2021 | Satisfied | KIDDER_MS_1 | Routine Compliance | |||||||
Electronic Communication | 11/09/2021 | Satisfied | KIDDER_MS_1 | Routine Compliance | |||||||
Electronic Communication | 11/08/2021 | Satisfied | KIDDER_MS_1 | Routine Compliance | |||||||
Site Inspection | 08/25/2021 | Minor Out of Compliance | KIDDER_MS_1 | 0/3 | Routine Compliance | ||||||
Letter | 08/25/2021 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 08/02/2021 | Satisfied | KIDDER_MS_1 | Routine Compliance | |||||||
Letter | 04/29/2020 | Satisfied | BOYLES_S | Enforcement | |||||||
Enforcement Tracking | 04/29/2020 | Closed Without Enforcement | BOYLES_S | Enforcement | |||||||
Incident | 04/27/2020 | Has not led to Discharge | PIERCE_BN_1 | Incident | |||||||
Electronic Communication | 04/27/2020 | Satisfied | BOYLES_S | Enforcement | |||||||
Electronic Communication | 03/26/2020 | Satisfied | BOYLES_S | Enforcement | |||||||
Document Management | 03/17/2020 | Satisfied | BOYLES_S | Incident | |||||||
Electronic Communication | 03/12/2020 | Satisfied | BOYLES_S | Enforcement | |||||||
Electronic Communication | 03/11/2020 | Satisfied | BOYLES_S | Enforcement | |||||||
Electronic Communication | 03/06/2020 | Satisfied | BOYLES_S | Enforcement | |||||||
Electronic Communication | 03/06/2020 | Satisfied | BOYLES_S | Enforcement | |||||||
Electronic Communication | 03/06/2020 | Satisfied | BOYLES_S | Enforcement | |||||||
Electronic Communication | 03/06/2020 | Satisfied | BOYLES_S | Enforcement | |||||||
Electronic Communication | 01/14/2020 | Satisfied | BOYLES_S | Enforcement | |||||||
Phone Conversation | 01/14/2020 | Satisfied | BOYLES_S | Enforcement | |||||||
Electronic Communication | 10/02/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 10/01/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 09/23/2019 | Satisfied | JOHNSON_CJ | Enforcement | |||||||
Phone Conversation | 09/16/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Phone Conversation | 08/09/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Issue Document | 08/08/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 08/08/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Enforcement Referral | 08/08/2019 | Accepted | RAUENZAHN_RA_1 | Enforcement | |||||||
Electronic Communication | 07/09/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 06/26/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 06/17/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 04/02/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 04/02/2019 | Minor Out of Compliance | PIERCE_BN_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 03/06/2019 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Site Inspection | 11/08/2016 | In Compliance | COTTRELL_SA_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 11/08/2016 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Electronic Communication | 10/24/2016 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Document Management | 11/10/2015 | Complete | MOORHEAD_SB_1 | Routine Compliance | |||||||
TCAR | 12/31/2014 | Satisfied | MOORHEAD_SB_1 | Closure | |||||||
Electronic Communication | 12/05/2014 | Satisfied | COTTRELL_SA_1 | Non-Compliance | |||||||
Site Inspection | 12/05/2014 | In Compliance | COTTRELL_SA_1 | 0/1 | Non-Compliance | ||||||
Electronic Communication | 10/24/2014 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Site Inspection | 10/24/2014 | Minor Out of Compliance | COTTRELL_SA_1 | 0/3 | Routine Compliance | ||||||
Letter | 10/24/2014 | Satisfied | COTTRELL_SA_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 10/22/2014 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Record Document | 10/08/2014 | Satisfied | MOORHEAD_SB_1 | Routine Compliance | |||||||
Document Management | 09/04/2014 | Complete | RAUENZAHN_RA_1 | Closure | |||||||
Incident | 09/04/2014 | Has not led to Discharge | MOORHEAD_SB_1 | Incident | |||||||
Letter | 09/04/2014 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Letter | 09/04/2014 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Letter | 08/01/2014 | Satisfied | MOORHEAD_SB_1 | Closure | |||||||
Record Document | 07/18/2014 | Satisfied | MOORHEAD_SB_1 | Closure | |||||||
Document Management | 07/18/2014 | Complete | MOORHEAD_SB_1 | Incident | |||||||
Document Management | 07/18/2014 | Complete | MOORHEAD_SB_1 | Closure | |||||||
Letter | 07/10/2014 | Satisfied | MOORHEAD_SB_1 | Non-Compliance | |||||||
Site Inspection | 03/11/2014 | In Compliance | MOORHEAD_SB_1 | 0/1 | Closure | ||||||
Electronic Communication | 03/11/2014 | Satisfied | COTTRELL_SA_1 | Installation | |||||||
Site Inspection | 03/11/2014 | In Compliance | COTTRELL_SA_1 | 0/1 | Installation | ||||||
Record Document | 01/21/2014 | Satisfied | MOORHEAD_SB_1 | Routine Compliance | |||||||
Site Inspection | 05/20/2013 | In Compliance | COTTRELL_SA_1 | 0/3 | Non-Compliance | ||||||
Electronic Communication | 05/20/2013 | Satisfied | COTTRELL_SA_1 | Non-Compliance | |||||||
Letter | 05/08/2013 | Satisfied | COTTRELL_SA_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 05/07/2013 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Site Inspection | 05/07/2013 | Minor Out of Compliance | COTTRELL_SA_1 | 0/3 | Routine Compliance | ||||||
Record Document | 02/12/2013 | Satisfied | MOORHEAD_SB_1 | Routine Compliance | |||||||
TCAR | 03/05/2012 | Satisfied | BAUTISTA_E_1 | Closure | |||||||
Site Inspection | 11/30/2011 | In Compliance | BAUTISTA_E_1 | 0/2 | Installation | ||||||
Site Inspection | 11/29/2011 | In Compliance | BAUTISTA_E_1 | 0/3 | Closure | ||||||
Site Inspection | 10/13/2011 | Minor Out of Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Letter | 10/13/2011 | Satisfied | BAUTISTA_E_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 10/12/2011 | Satisfied | BAUTISTA_E_1 | Routine Compliance | |||||||
Site Inspection | 10/15/2010 | In Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/12/2010 | Satisfied | BAUTISTA_E_1 | Routine Compliance | |||||||
Site Inspection | 12/04/2009 | In Compliance | BAUTISTA_E_1 | 0/1 | Non-Compliance | ||||||
Letter | 11/03/2009 | Satisfied | BAUTISTA_E_1 | Non-Compliance | |||||||
Record Document | 10/29/2009 | Satisfied | BAUTISTA_E_1 | Discharge | |||||||
Site Inspection | 10/28/2009 | Minor Out of Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/15/2008 | In Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/15/2007 | In Compliance | BAUTISTA_E_1 | 0/3 | Non-Compliance | ||||||
Letter | 10/10/2007 | Satisfied | PERRY_JF | Non-Compliance | |||||||
Site Inspection | 10/05/2007 | Major Out of Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | PERRY_JF | Routine Compliance | |||||||
Site Inspection | 01/05/2007 | In Compliance | PERRY_JF | 0/6 | Installation | ||||||
Site Inspection | 01/05/2007 | In Compliance | PERRY_JF | 0/6 | Closure | ||||||
Site Inspection | 10/26/2006 | Minor Out of Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/22/2006 | Satisfied | PERRY_JF | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
06/04/2024 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Provide required financial responsibility documentation (e.g. tank insurance policy) for the last three (3) years to Orange County EPD for review. | |||||||
06/04/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide documentation of passing operability tests of ball float valves from 2023-2024 to Orange County EPD for review. | |||||||
06/04/2024 | 6043 | Minor | 4.13 Fillbox covers not marked according to requirements. | Repaint spill bucket lids with the correct color markings to identify product fills. Provide documentation of correct markings to Orange County EPD for review. | |||||||
06/04/2024 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Update the facility registration with the correct property and facility owner information, as well as contact information for authorized contact person(s). Facilities may be registered online via the DEP ESSA portal: https://prodenv.dep.state.fl.us/DepEssa/ | |||||||
06/04/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide documentation of passing operability tests for line leak detectors and release detection systems for 2023-2024 to Orange County EPD for review. | |||||||
06/04/2024 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Provide records of monthly visual inspections of the storage tank system for the last three (3) years to Orange County EPD for review. | |||||||
06/04/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide documentation of passing integrity tests for the single-wall spill bucket and all STP sumps for the last three (3) years to Orange County EPD for review. | |||||||
06/04/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove and properly dispose of water from all STP sumps and spill buckets. Provide documentation of water removal to Orange County EPD for review. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
03/25/2005 | COMPLETED | 61 | |||||||||
08/20/1992 | COMPLETED | 61 | PETROLEUM CLEANUP PARTICIPATION PROGRAM-ELIGIBLE | ||||||||