![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Retail Station | ||||||||
County | Seminole | Status | OPEN | ||||||||
ID | 8516589 | Latitude | 28° 46' 14.95 | ||||||||
Name |
SAN CITY MART 3100 SANFORD AVE |
Longitude | 81° 15' 54.34 | ||||||||
SANFORD, FL 32773-5824 | LL Method | DPHO | |||||||||
Contact | HAROON ANWAR | LL Status | REVIEWED | ||||||||
Phone | (678) 852-5079 | Status Date | 06/16/2005 | ||||||||
Account Owner Information | |||||||||||
Name | FMR OF SANFORD INC 3100 SANFORD AVE. SANFORD, FL 32773 |
Effective Date | 12/30/2020 | ||||||||
Contact | HAROON ANWAR | ||||||||||
Phone | (678) 852-5079 | ||||||||||
HAROON_67@HOTMAIL.COM | |||||||||||
Placard # / Date | 609735 - 06/14/2021 | ||||||||||
Property Owner Information | |||||||||||
Name | SFD FUEL LLC 8007 HAWK CREST CT CHARLOTTE, FL 28270 |
Effective Date | 09/25/2017 | ||||||||
Contact | |||||||||||
Phone | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 8000 | Unleaded Gas (B) | 12/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 12000 | Unleaded Gas (B) | 12/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 12000 | Unleaded Gas (B) | 11/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Unleaded Gas (B) | 08/01/1975 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (H) Impressed current CP (M) Spill containment bucket |
(E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Unleaded Gas (B) | 08/01/1975 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (H) Impressed current CP (M) Spill containment bucket |
(E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 8000 | Unleaded Gas (B) | 08/01/1975 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (H) Impressed current CP (M) Spill containment bucket |
(E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 01/28/2024 | 01/28/2025 | LLOYD'S UNDERWRITERS | ||||||||
INSURANCE | 01/28/2023 | 01/28/2024 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 01/28/2022 | 01/28/2023 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 05/16/2019 | 05/16/2020 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 05/16/2018 | 05/16/2019 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 05/16/2017 | 05/16/2018 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 09/21/2016 | 09/21/2017 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 09/01/2014 | 08/31/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 09/01/2011 | 08/31/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 06/26/2006 | 07/26/2011 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/11/2005 | 10/12/2005 | IN-COMPLIANCE | BAUTISTA | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 11/11/2004 | 11/15/2004 | IN-COMPLIANCE | PERRY | 0/3 | COMPLIANCE ASSURANCE | |||||
TXI | 09/23/2004 | 10/01/2004 | IN-COMPLIANCE | PERRY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 09/14/2004 | 09/15/2004 | IN-COMPLIANCE | BAUTISTA | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 09/09/2003 | 09/09/2003 | IN-COMPLIANCE | BAUTISTA | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 09/18/2002 | 09/19/2002 | IN-COMPLIANCE | BAUTISTA | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/23/2001 | 10/25/2001 | IN-COMPLIANCE | PERRY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/18/2000 | 10/18/2000 | IN-COMPLIANCE | PERRY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/22/1999 | 10/26/1999 | IN-COMPLIANCE | PERRY | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 12/02/2024 | Satisfied | RIVERA_JX_2 | Compliance Assistance | |||||||
Enforcement Referral | 09/16/2024 | Accepted | RIVERA_JX_2 | Enforcement | |||||||
Site Inspection | 04/11/2024 | Minor Out of Compliance | LAFON_AT_2 | 0/3 | Routine Compliance | ||||||
Letter | 04/11/2024 | Satisfied | LAFON_AT_2 | Compliance Assistance | |||||||
Letter | 12/16/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 12/16/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 12/08/2022 | Satisfied | KIDDER_MS_1 | Routine Compliance | |||||||
Electronic Communication | 12/08/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Phone Conversation | 11/30/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 11/30/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Letter | 11/22/2022 | Satisfied | GREGORY_JW_1 | Compliance Assistance | |||||||
Enforcement Referral | 11/04/2022 | Rejected | GREGORY_JW_1 | Enforcement | |||||||
Electronic Communication | 10/13/2022 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Site Inspection | 12/10/2021 | Minor Out of Compliance | KIDDER_MS_1 | 0/3 | Routine Compliance | ||||||
Letter | 12/10/2021 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Phone Conversation | 12/06/2021 | Satisfied | KIDDER_MS_1 | Routine Compliance | |||||||
Electronic Communication | 08/02/2021 | Satisfied | KIDDER_MS_1 | Routine Compliance | |||||||
Letter | 06/18/2019 | Satisfied | JOHNSON_CJ | Enforcement | |||||||
Enforcement Tracking | 06/18/2019 | Closed Without Enforcement | JOHNSON_CJ | Enforcement | |||||||
Electronic Communication | 06/14/2019 | Satisfied | JOHNSON_CJ | Enforcement | |||||||
Enforcement Referral | 06/13/2019 | Accepted | RAUENZAHN_RA_1 | Enforcement | |||||||
Phone Conversation | 06/13/2019 | Satisfied | JOHNSON_CJ | Enforcement | |||||||
Issue Document | 05/21/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 05/21/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 05/21/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 05/20/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Meeting | 05/08/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 05/02/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Phone Conversation | 05/02/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 02/05/2019 | Minor Out of Compliance | PIERCE_BN_1 | 0/3 | Routine Compliance | ||||||
Letter | 02/05/2019 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Phone Conversation | 01/25/2019 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Electronic Communication | 11/04/2016 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Site Inspection | 11/04/2016 | In Compliance | COTTRELL_SA_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 10/11/2016 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Electronic Communication | 06/22/2016 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Document Management | 11/10/2015 | Complete | MOORHEAD_SB_1 | Routine Compliance | |||||||
Incident | 03/27/2015 | Has not led to Discharge | COTTRELL_SA_1 | Incident | |||||||
TCAR | 03/26/2015 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Letter | 03/26/2015 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Document Management | 03/25/2015 | Complete | RAUENZAHN_RA_1 | Closure | |||||||
Site Inspection | 01/09/2015 | In Compliance | COTTRELL_SA_1 | 0/3 | Closure | ||||||
Electronic Communication | 01/09/2015 | Satisfied | COTTRELL_SA_1 | Closure | |||||||
Site Inspection | 01/09/2015 | In Compliance | COTTRELL_SA_1 | 0/3 | Installation | ||||||
Electronic Communication | 01/09/2015 | Satisfied | COTTRELL_SA_1 | Installation | |||||||
Document Management | 01/07/2015 | Complete | COTTRELL_SA_1 | Incident | |||||||
Site Inspection | 10/24/2014 | In Compliance | COTTRELL_SA_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 10/24/2014 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/22/2014 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Record Document | 04/01/2014 | Satisfied | MOORHEAD_SB_1 | Routine Compliance | |||||||
Site Inspection | 05/07/2013 | In Compliance | COTTRELL_SA_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/07/2013 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Record Document | 03/20/2013 | Satisfied | MOORHEAD_SB_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/12/2011 | Satisfied | BAUTISTA_E_1 | Routine Compliance | |||||||
Site Inspection | 10/12/2011 | In Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/18/2010 | In Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/18/2010 | Satisfied | BAUTISTA_E_1 | Routine Compliance | |||||||
Site Inspection | 10/27/2009 | In Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/15/2008 | In Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/10/2007 | In Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/21/2007 | Satisfied | PERRY_JF | Routine Compliance | |||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | PERRY_JF | Routine Compliance | |||||||
Site Inspection | 10/24/2006 | In Compliance | BAUTISTA_E_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/22/2006 | Satisfied | PERRY_JF | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
04/11/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide integrity testing records for all secondary containment systems (spill buckets, piping/STP sumps, and dispenser sumps) from 2021 to the time of inspection to Orange County EPD for review. | |||||||
04/11/2024 | 6002 | Minor | 2.1 Operator Training records not available. | Provide records of Class A/B/C operator certification for all appropriate persons to Orange County EPD for review. If training has not been done for these certifications, ensure that the necessary persons are trained as required. | |||||||
04/11/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove and properly dispose of PCW from all containers, and provide documentation to Orange County EPD accordingly. | |||||||
04/11/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide records of annual operability testing of all overfill protection devices from 2021 to the time of inspection to Orange County EPD for review. | |||||||
04/11/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide all annual testing records for line leak detectors and Veeder-Root ATG monitoring system from 2021 to the time of inspection to Orange County EPD for review. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/07/1996 | COMPLETED | 66 | |||||||||
07/14/1992 | COMPLETED | 66 | PETROLEUM CLEANUP PARTICIPATION PROGRAM-ELIGIBLE | ||||||||