Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Retail Station | ||||||||
County | Sumter | Status | OPEN | ||||||||
ID | 8516878 | Latitude | 28° 52' 28.8647 | ||||||||
Name |
WILDWOOD TRAVEL CENTER #53 556 E STATE ROAD 44 |
Longitude | 82° 5' 36.7946 | ||||||||
WILDWOOD, FL 34785-9474 | LL Method | DGPS | |||||||||
Contact | JOSEPH ROSS | LL Status | REVIEWED | ||||||||
Phone | (352) 748-2501 | Status Date | 11/11/2003 | ||||||||
Account Owner Information | |||||||||||
Name | TA OPERATING CORP 24601 CTR RIDGE RD WESTLAKE, OH 44145 |
Effective Date | 03/14/2007 | ||||||||
Contact | KATIE WELLS | ||||||||||
Phone | (440) 808-3296 | ||||||||||
KWELLS2@TA-PETRO.COM | |||||||||||
Placard # / Date | 686194 - 06/10/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | TA OPERATING CORP 24601 CTR RIDGE RD WESTLAKE, OH 44145 |
Effective Date | 06/11/2019 | ||||||||
Contact | KATIE WELLS | ||||||||||
Phone | (440) 808-3296 | ||||||||||
KWELLS2@TA-PETRO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 1000 | Waste Oil (L) | 07/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket |
(C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 20000 | Vehicular Diesel (D) | 07/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 20000 | Vehicular Diesel (D) | 07/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
13 | 20000 | Vehicular Diesel (D) | 07/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
14 | 20000 | Vehicular Diesel (D) | 07/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
15 | 30000 | Unleaded Gas (B) | 11/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
16 | 15000 | Vehicular Diesel (D) | 11/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 2000 | New/Lube Oil (O) | 09/01/1984 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 09/01/1984 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system |
(G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 09/01/1984 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system |
(G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | Unleaded Gas (B) | 09/01/1984 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system |
(G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Vehicular Diesel (D) | 09/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system |
(G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 20000 | Unleaded Gas (B) | 09/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system |
(G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 20000 | Unleaded Gas (B) | 09/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system |
(G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 20000 | Unleaded Gas (B) | 09/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system |
(G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 1000 | Waste Oil (L) | 09/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (C) Fiberglass | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 06/01/2021 | 06/01/2024 | LLOYD'S SYNDICATE NO. 2623 | ||||||||
INSURANCE | 06/01/2020 | 06/01/2021 | LLOYD'S SYNDICATE NO. 2623 | ||||||||
INSURANCE | 06/01/2019 | 06/01/2020 | LLOYD'S SYNDICATE NO. 2623 | ||||||||
INSURANCE | 06/01/2018 | 06/01/2019 | LLOYDS OF LONDON | ||||||||
INSURANCE | 06/01/2017 | 06/01/2018 | AIG | ||||||||
INSURANCE | 06/01/2016 | 06/01/2017 | AIG SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 06/01/2015 | 06/01/2016 | AIG | ||||||||
INSURANCE | 06/01/2014 | 06/01/2015 | AIG | ||||||||
INSURANCE | 06/01/2013 | 06/01/2014 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 06/01/2012 | 06/01/2013 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 06/01/2011 | 06/01/2012 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 06/01/2010 | 06/01/2011 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 06/01/2009 | 06/01/2010 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
INSURANCE | 04/01/2009 | 04/01/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 04/01/2007 | 06/01/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 12/16/2005 | 12/16/2005 | MOLLI_SA | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/08/2005 | 12/28/2005 | MOLLI_SA | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 11/14/2005 | 02/06/2006 | IN-COMPLIANCE | MOLLI_SA | 1/9 | DISCHARGE PROJECT | |||||
Completion Notes J & J EQUIP. DUG UP LINE AND LEAK WAS DISCOVERED. SOIL ANALYTICALS SENT1/12/06 CONFIRMING DRF FROM 10/31/05. | |||||||||||
NCLI | 11/10/2005 | 12/16/2005 | MOLLI_SA | 0/0 | COMPLIANCE ASSURANCE | ||||||
TDI | 11/01/2005 | 02/06/2006 | MOLLI_SA | 1/9 | DISCHARGE PROJECT | ||||||
Completion Notes DIESEL LINE FAILED TIGHTNESS TEST - DISCHARGE NOT YET CONFIRMED | |||||||||||
TCI | 11/01/2005 | 12/16/2005 | MINOR OUT-OF-COMPLIANCE | MOLLI_SA | 1/9 | COMPLIANCE ASSURANCE | |||||
DRFR | 10/31/2005 | 12/16/2005 | MOLLI_SA | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes LEAK IN FUEL LINE BTWN MASTER SATELLITE DISPENSER IN LANE 5. | |||||||||||
RRBD | 08/10/2005 | 08/24/2005 | MOLLI_SA | 0/0 | DISCHARGE PROJECT | ||||||
DRFR | 08/10/2005 | 08/11/2005 | MOLLI_SA | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes 40 GAL OVERFILL SPILL, ON 7/28/05 | |||||||||||
NCLI | 08/03/2005 | 08/24/2005 | MOLLI_SA | 0/0 | DISCHARGE PROJECT | ||||||
TDI | 07/29/2005 | 08/24/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | MOLLI_SA | 0/0 | DISCHARGE PROJECT | |||||
Completion Notes INSPECT A 405 GAL DISCHARGE | |||||||||||
DCCR | 07/28/2005 | 08/03/2005 | MOLLI_SA | 0/0 | DISCHARGE PROJECT | ||||||
DRFR | 07/28/2005 | 08/03/2005 | MOLLI_SA | 0/0 | DISCHARGE PROJECT | ||||||
REX | 06/14/2005 | 06/14/2005 | SUMNER_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TIME EXTENSION UNTIL 7/15/2005 TO RESOLVE SNC B #1062 FROM 2/1/2005 TCI. | |||||||||||
NCLI | 02/07/2005 | 02/09/2005 | SUMNER_C | 1/9 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/01/2005 | 02/09/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | SUMNER_C | 1/9 | COMPLIANCE ASSURANCE | |||||
CFFE | 08/30/2004 | 08/30/2004 | REEDER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
SCOE | 08/27/2004 | 08/30/2004 | REEDER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TEQA | 06/24/2004 | 06/29/2004 | REEDER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
CRDE | 06/22/2004 | 06/22/2004 | SUMNER_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 06/22/2004 | 06/22/2004 | SUMNER_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 06/18/2004 | 06/29/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | SUMNER_C | 1/9 | COMPLIANCE ASSURANCE | |||||
NCLI | 02/23/2004 | 02/27/2004 | SUMNER_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
TEQA | 02/13/2004 | 06/17/2004 | REEDER_J | 1/9 | COMPLIANCE ASSURANCE | ||||||
TCR | 02/13/2004 | 02/27/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | SUMNER_C | 1/9 | COMPLIANCE ASSURANCE | |||||
CRDE | 10/16/2003 | 10/16/2003 | SUMNER_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 10/13/2003 | 10/16/2003 | SUMNER_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
TEQA | 10/08/2003 | 10/28/2003 | REEDER_J | 1/9 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/08/2003 | 10/16/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | SUMNER_C | 1/9 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING IS DOUBLE WALLED AMERON FIBERGLASS | |||||||||||
TCI | 05/16/2003 | 06/11/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | SHREWSBURY | 0/9 | COMPLIANCE ASSURANCE | |||||
NCLI | 03/11/2002 | 03/12/2002 | SHREWSBURY,R | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/06/2002 | 03/06/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | SHREWSBURY,R | 1/9 | COMPLIANCE ASSURANCE | |||||
TCI | 02/20/2001 | 02/21/2001 | MINOR OUT-OF-COMPLIANCE | SHREWSBURY | 1/9 | COMPLIANCE ASSURANCE | |||||
TCI | 02/04/2000 | 08/27/2000 | MINOR OUT-OF-COMPLIANCE | SHREWSBURY | 1/9 | COMPLIANCE ASSURANCE | |||||
TCI | 06/29/1999 | 07/13/1999 | MINOR OUT-OF-COMPLIANCE | SHREWSBURY | 1/10 | COMPLIANCE ASSURANCE | |||||
ATCI | 04/18/1997 | 07/15/1997 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 07/30/2024 | Accepted | LEE_MC_1 | Enforcement | |||||||
Site Inspection | 11/21/2023 | Major Out of Compliance | MULLIGAN_PC_1 | 1/7 | Routine Compliance | ||||||
Letter | 11/21/2023 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Record Document | 03/03/2022 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Letter | 03/03/2022 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Record Document | 01/27/2022 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Record Document | 01/20/2022 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
TCAR | 01/20/2022 | Satisfied | MULLIGAN_PC_1 | Closure | |||||||
Letter | 01/20/2022 | Satisfied | MULLIGAN_PC_1 | Closure | |||||||
Phone Conversation | 11/30/2021 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Electronic Communication | 11/01/2021 | Satisfied | MULLIGAN_PC_1 | Routine Compliance | |||||||
Letter | 11/01/2021 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Site Inspection | 11/01/2021 | Major Out of Compliance | MULLIGAN_PC_1 | 1/7 | Routine Compliance | ||||||
Letter | 05/26/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Record Document | 05/26/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Record Document | 05/06/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Record Document | 05/04/2020 | Satisfied | MULLIGAN_PC_1 | Routine Compliance | |||||||
Record Document | 04/02/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Incident | 03/31/2020 | Has not led to Discharge | MULLIGAN_PC_1 | Incident | |||||||
Document Management | 03/31/2020 | Satisfied | MULLIGAN_PC_1 | Incident | |||||||
Record Document | 03/30/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Letter | 03/26/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||||||
Site Inspection | 03/26/2020 | Major Out of Compliance | MULLIGAN_PC_1 | 1/7 | Routine Compliance | ||||||
Site Inspection | 02/23/2018 | In Compliance | ANTON_TM_1 | 1/7 | Routine Compliance | ||||||
Letter | 02/23/2018 | Satisfied | ANTON_TM_1 | Routine Compliance | |||||||
Site Inspection | 08/09/2016 | In Compliance | ANTON_TM_1 | 1/7 | Non-Compliance | ||||||
Site Inspection | 07/25/2016 | Minor Out of Compliance | HECKMAN_DA_1 | 1/7 | Non-Compliance | ||||||
Letter | 07/25/2016 | Satisfied | ANTON_TM_1 | Non-Compliance | |||||||
Site Inspection | 05/31/2016 | Minor Out of Compliance | HECKMAN_DA_1 | 1/7 | Installation | ||||||
Site Inspection | 05/31/2016 | Minor Out of Compliance | HECKMAN_DA_1 | 1/7 | Closure | ||||||
Letter | 05/31/2016 | Satisfied | HECKMAN_DA_1 | Non-Compliance | |||||||
Letter | 05/31/2016 | Satisfied | HECKMAN_DA_1 | Non-Compliance | |||||||
Letter | 04/06/2016 | Satisfied | ANTON_TM_1 | Non-Compliance | |||||||
Site Inspection | 04/06/2016 | Minor Out of Compliance | ANTON_TM_1 | 1/7 | Routine Compliance | ||||||
Letter | 01/07/2014 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 01/07/2014 | Minor Out of Compliance | COLSON_NJ_1 | 1/7 | Routine Compliance | ||||||
Site Inspection | 01/25/2012 | In Compliance | COLSON_NJ_1 | 1/7 | Routine Compliance | ||||||
Record Document | 03/28/2011 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Letter | 02/25/2011 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 02/25/2011 | Minor Out of Compliance | COLSON_NJ_1 | 1/7 | Routine Compliance | ||||||
Record Document | 06/28/2010 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 04/21/2010 | Major Out of Compliance | COLSON_NJ_1 | 1/7 | Non-Compliance | ||||||
Letter | 04/21/2010 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 03/24/2010 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Letter | 03/24/2010 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 03/24/2010 | Major Out of Compliance | COLSON_NJ_1 | 1/7 | Routine Compliance | ||||||
Record Document | 07/22/2009 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||||||
Record Document | 07/16/2009 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||||||
Letter | 07/01/2009 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||||||
Site Inspection | 07/01/2009 | Major Out of Compliance | OSTENSEN_SA_1 | 0/1 | Non-Compliance | ||||||
Letter | 05/13/2009 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 05/13/2009 | Minor Out of Compliance | COLSON_NJ_1 | 1/7 | Non-Compliance | ||||||
Letter | 03/04/2009 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 03/04/2009 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 03/04/2009 | Major Out of Compliance | COLSON_NJ_1 | 1/7 | Routine Compliance | ||||||
TCAR | 02/16/2009 | Satisfied | OSTENSEN_SA_1 | Closure | |||||||
Record Document | 12/22/2008 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||||||
Record Document | 12/22/2008 | Satisfied | OSTENSEN_SA_1 | Closure | |||||||
Letter | 12/18/2008 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 12/18/2008 | Minor Out of Compliance | OSTENSEN_SA_1 | 0/2 | Installation | ||||||
Site Inspection | 12/10/2008 | Major Out of Compliance | COLSON_NJ_1 | 0/4 | Closure | ||||||
Record Document | 12/10/2008 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Letter | 12/10/2008 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Record Document | 03/05/2008 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||||||
Letter | 01/31/2008 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||||||
Site Inspection | 01/31/2008 | Major Out of Compliance | OSTENSEN_SA_1 | 0/9 | Routine Compliance | ||||||
Letter | 12/26/2007 | Satisfied | OSTENSEN_SA_1 | Closure | |||||||
TCAR | 12/26/2007 | Complete | OSTENSEN_SA_1 | Closure | |||||||
Enforcement Tracking | 12/13/2007 | Closed With Enforcement | MARSH_L | Enforcement | |||||||
Phone Conversation | 11/20/2007 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||||||
Letter | 10/01/2007 | Satisfied | OSTENSEN_SA_1 | Closure | |||||||
TCAR | 10/01/2007 | Complete | OSTENSEN_SA_1 | Closure | |||||||
Record Document | 09/11/2007 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||||||
Letter | 09/07/2007 | Satisfied | BAUER_DR_1 | Non-Compliance | |||||||
Site Inspection | 09/04/2007 | Minor Out of Compliance | BAUER_DR_1 | 1/13 | Installation | ||||||
Site Inspection | 09/04/2007 | Minor Out of Compliance | BAUER_DR_1 | 1/13 | Closure | ||||||
Record Document | 08/20/2007 | Satisfied | HARMAN_GR | Non-Compliance | |||||||
Letter | 08/16/2007 | Satisfied | HARMAN_GR | Non-Compliance | |||||||
Letter | 08/16/2007 | Satisfied | HARMAN_GR | Non-Compliance | |||||||
Site Inspection | 08/16/2007 | Major Out of Compliance | HARMAN_GR | 1/9 | Non-Compliance | ||||||
Letter | 08/16/2007 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||||||
Record Document | 08/16/2007 | Satisfied | HARMAN_GR | Non-Compliance | |||||||
Letter | 08/16/2007 | Satisfied | HARMAN_GR | Non-Compliance | |||||||
Enforcement Referral | 08/14/2007 | Accepted | MARSH_L | Enforcement | |||||||
Site Inspection | 06/18/2007 | Major Out of Compliance | HARMAN_GR | 1/9 | Non-Compliance | ||||||
Emergency Preparedness Information | 05/22/2007 | Satisfied | OSTENSEN_SA_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | OSTENSEN_SA_1 | Routine Compliance | |||||||
Letter | 01/22/2007 | NCL Re-Issued | HARMAN_GR | Non-Compliance | |||||||
Enforcement Referral Activity - OLD | 12/27/2006 | Terminated | CULBRETH_L | Enforcement | |||||||
Site Inspection | 12/27/2006 | Major Out of Compliance | HARMAN_GR | 1/9 | Routine Compliance | ||||||
Site Inspection | 12/11/2006 | Minor Out of Compliance | OSTENSEN_SA_1 | 0/2 | Closure | ||||||
Site Inspection | 11/13/2006 | Minor Out of Compliance | OSTENSEN_SA_1 | 1/13 | Installation | ||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | OSTENSEN_SA_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/21/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair/replace/retest automotive side dispenser 5/6 and diesel side dispenser 2/3satellite and 4/5satellite and submit documentation to Citrus County Environmental Health. If concrete is broken or dispensers are being replaced a closure integrity evaluation must be submitted and approved prior to the replacement or soil sampling will be required at time of replacement. | |||||||
11/21/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Perform integrity testing on the Tank #5 STP sump and the Tank #6 STP sump and submit results to Citrus County Environmental Health. | |||||||
11/15/2023 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove all liquid from the PUL primary spill bucket and the waste oil tank center sump and submit pictures or a work order to Citrus County Environmental Health. | |||||||
11/15/2023 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Annual testing of the Krueger leak gauge on the new oil aboveground tank shall be performed at least once per year, no more than 12 months apart. Submit previous test results if available. If testing was performed or documentation is not available perform operability testing and submit results to Citrus County Environmental Health. | |||||||
11/15/2023 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Annual testing of the primary overfill device on the new oil aboveground tank (Morrison Bros 918 clock gauge with high level alarm) shall be performed at least once per year, no more than 12 months apart. Submit previous test results if available. If testing was performed or documentation is not available perform operability testing and submit results to Citrus County Environmental Health. | |||||||
11/15/2023 | 7064 | Minor | 3.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Begin performing monthly visual inspections of the new oil aboveground tank and submit logs for the next two months (December 2023 and January 2024) to Citrus County Environmental Health. | |||||||
11/15/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Remove all liquid from the PUL doublewalled spill bucket and perform integrity testing, submit results to Citrus County Environmental Health. | |||||||
11/15/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair/replace/retest the secondary gauge in the PUL spill bucket and submit documentation to Citrus County Environmental Health. | |||||||
11/15/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Remove the waste oil tank interstice sensor, if the interstice is found dry repair/replace/retest the sensor. If liquid is found in the tank interstice further testing may be required. Submit all documentation to Citrus County Environmental Health. | |||||||
11/15/2023 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Clean and remove all product/product residue from diesel side dispensers 1/2Satellite, 2/3satellite, 3/4satellite, 6/7satellite, 7/8satellite, and 8/9satellite and submit pictures or a work order to Citrus County Environmental Health. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
10/29/2005 | COMPLETED | 30 | |||||||||
07/28/2005 | COMPLETED | 30 | |||||||||
06/07/1990 | INACTIVE | 30 | PETROLEUM CLEANUP PARTICIPATION PROGRAM-ELIGIBLE | ||||||||
12/27/1988 | INACTIVE | 30 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||