DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 03/19/2025        Last Data Refresh: 03/18/2025        Report Generated from DOPPLER
 
District Central   Type    Retail Station
 
County Volusia   Status    OPEN
 
ID 8517390   Latitude    29° 4' 37.7718
 
Name FIFO INC
2500 N WOODLAND BLVD
Longitude    81° 18' 46.847
  DELAND, FL 32720 LL Method    DPHO
 
Contact KWONG HO PAK   LL Status    REVIEWED
 
Phone (386) 873-4825   Status Date    10/15/2003
 
Account Owner Information
 
Name FIFO INC
5329 NEWHALL AVE
ORLANDO, FL 32810
Effective Date    11/04/2005
 
Contact KWONG HO PAK OR SEI JUNG PAK
 
Phone (407) 687-1512
 
Email AAHADAWAL@YAHOO.COM
  Placard # / Date    702152 - 10/11/2024
Property Owner Information
 
Name FIFO INC
5329 NEWHALL AVE
ORLANDO, FL 32810
Effective Date    11/04/2005
 
Contact KWONG HO PAK OR SEI JUNG PAK
 
Phone (407) 687-1512
 
Email AAHADAWAL@YAHOO.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
6 25000 Unleaded Gas (B) 03/01/2009 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(O) Tight fill
(R) Double wall - tank jacket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
1 4000 Unleaded Gas (B) 07/01/1978 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
2 4000 Unleaded Gas (B) 07/01/1978 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
3 4000 Unleaded Gas (B) 07/01/1978 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
4 4000 Kerosene (K) 07/01/1978 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
5 3000 Vehicular Diesel (D) 07/01/1978 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(S) Statistical Inventory Reconcile
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   06/30/2017 06/30/2018 COMMERCE & INDUSTRY
INSURANCE   06/30/2017 06/30/2018 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   06/30/2016 06/30/2017 COMMERCE & INDUSTRY
INSURANCE   06/30/2014 06/30/2015 COMMERCE & INDUSTRY
INSURANCE   06/30/2011 06/30/2012 ZURICH-AMERICAN
INSURANCE   06/30/2009 06/30/2010 ZURICH-AMERICAN
INSURANCE   02/15/1992 03/15/1996 FPLIPA
INSURANCE   12/31/1990 12/31/1991 FPLIPA
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 04/12/2006 04/18/2006 SIGNIFICANT OUT-OF-COMPLIANCE MOSER_T 0/5 COMPLIANCE ASSURANCE
 
 Completion Notes NUMEROUS VIOLATIONS NOTED.
 
CALL 11/03/2005 11/03/2005 EJ 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes PER RUTH, DIESEL NOZZLE HAS BEEN REPLACED. STILL WORKING ON BENT VENT PIPE.
 
CWOE 10/28/2005 10/28/2005 DJ 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes NFA CONCERNING THE LATEST TCI.
 
SV 10/26/2005 10/28/2005 DJ 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes REINSPECTION INDICATED THE PREVIOUS N/C ITEMS WERE CORRECTED.
 
RRBD 09/27/2005 10/06/2005 EJ 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes REC'D LETTER. ALL REPAIRS HAVE BEEN MADE. READY FOR REINSPETION.
 
CALL 09/15/2005 09/19/2005 EJ 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes REC'D FAX FROM RUTH. KEROSENE FILLPORT LID IS PROPERTY MARKED. THEY ARE REPLACING HOSES & REMOVING LIQUID FROM FILLPORTS & SUMPS. WILL CALL FOR REINSPECTION.
 
CALL 09/13/2005 09/13/2005 EJ 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes RUTH ASKED IF SHE HAS TO HAVE ALL OF THE HOSES REPLACED. TOLD HER JUST THE ONES WITH EXPOSED THREADS. LINERS, SUMPS HAVE BEEN EMPTIES. SHE WILL CK THEM AGAIN & CALL FOR REINSPECT.
 
WLI 09/02/2005 09/02/2005 DJ 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes NO FURTHER RESPONSE.
 
TCR 07/08/2005 07/08/2005 IN-COMPLIANCE DJ 0/5 COMPLIANCE ASSURANCE
 
 Completion Notes TCR INDICATED THE KEROSENE FILL WAS PROPERLY MARKED. THE DISPENSER HOSES WERE NOT CHANGED. THE DISPENSER LINER 1/2 SLUDGE REMAINS, KEROSENE LINER HAS WATER, AND ALL SPILL BUCKETS HAVE WATER/PRODUCT. DIESEL STP PIPING SUMP O.K.
 
RRBD 06/16/2005 06/30/2005 EJ 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes ALL NC ITEMS HAVE BEEN CORRECTED. REINSPECT.
 
NCLI 05/25/2005 06/30/2005 DERRICK FRITTS 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes DISTRICT SENT NCL.
 
TCQA 05/10/2005 05/25/2005 MINOR OUT-OF-COMPLIANCE FRITTS_D 0/5 COMPLIANCE ASSURANCE
 
TCI 04/25/2005 04/28/2005 IN-COMPLIANCE MOSER_T 0/5 COMPLIANCE ASSURANCE
 
TCI 04/13/2004 04/29/2004 MINOR OUT-OF-COMPLIANCE MOSER_T 0/4 COMPLIANCE ASSURANCE
 
CWOE 06/26/2003 06/26/2003 DJ 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes NFA CONCERNING THE PREVIOUS TCI AT THIS FACILITY.
 
TCR 06/26/2003 06/26/2003 IN-COMPLIANCE DJ 0/5 COMPLIANCE ASSURANCE
 
 Completion Notes REINSPECTION INDICATED THE NON-COMPLIANCE ISSUE HAS BEEN RESOLVED.
 
RRBD 06/25/2003 06/25/2003 DJ 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes RECEIVED DOCUMENTATION INDICATING THE NON-COMPLIANCE ISSUES HAVE BEEN CORRECTED. WILL SCHEDULE REINSPECTION TO VERIFY.
 
NCLI 06/11/2003 06/11/2003 TLM 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes NCL MAILED 6/11/03. NO RESPONSE FROM FACILITY.
 
TCI 04/10/2003 04/10/2003 MINOR OUT-OF-COMPLIANCE DJ 0/5 COMPLIANCE ASSURANCE
 
 Completion Notes DISPENSER #2 HAS A FILTER LEAKING AND PRODUCT IN LINER.
 
RRBD 06/07/2002 06/07/2002 COMPLIANCE ASSURANCE
 
TCI 04/23/2002 04/23/2002 MINOR OUT-OF-COMPLIANCE DJ 0/5 COMPLIANCE ASSURANCE
 
RRBD 05/27/2001 06/05/2001 COMPLIANCE ASSURANCE
 
TCI 04/12/2001 04/26/2001 MINOR OUT-OF-COMPLIANCE LLW 0/5 COMPLIANCE ASSURANCE
 
TCI 06/22/2000 06/22/2000 IN-COMPLIANCE LLW 0/5 COMPLIANCE ASSURANCE
 
TCI 06/01/1999 07/01/1999 MINOR OUT-OF-COMPLIANCE MOSER_T 0/5 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 10/12/2023 Satisfied BOYLES_S Enforcement
 
Enforcement Referral 08/29/2023 Accepted GREGORY_JW_1 Enforcement
 
Letter 07/14/2023 Satisfied GREGORY_JW_1 Compliance Assistance
 
Letter 07/14/2023 Satisfied GREGORY_JW_1 Compliance Assistance
 
Electronic Communication 05/10/2022 Satisfied PIERCE_BN_1 Compliance Assistance
 
Site Inspection 05/05/2022 Major Out of Compliance PIERCE_BN_1 0/1 Routine Compliance
 
Letter 05/05/2022 Satisfied PIERCE_BN_1 Compliance Assistance
 
Phone Conversation 05/03/2022 Satisfied PIERCE_BN_1 Routine Compliance
 
Electronic Communication 09/02/2021 Satisfied RAUENZAHN_RA_1 Compliance Assistance
 
Electronic Communication 02/18/2020 Satisfied RAUENZAHN_RA_1 Enforcement
 
Electronic Communication 02/18/2020 Satisfied RAUENZAHN_RA_1 Enforcement
 
Electronic Communication 11/19/2019 Satisfied RAUENZAHN_RA_1 Enforcement
 
Record Document 11/15/2019 Satisfied RAUENZAHN_RA_1 Enforcement
 
Issue Document 11/04/2019 Satisfied RAUENZAHN_RA_1 Compliance Assistance
 
Electronic Communication 11/04/2019 Satisfied RAUENZAHN_RA_1 Compliance Assistance
 
Enforcement Referral 11/04/2019 Accepted RAUENZAHN_RA_1 Enforcement
 
Phone Conversation 06/20/2019 Satisfied PERRY_JF_2 Routine Compliance
 
Letter 05/15/2019 Satisfied RAUENZAHN_RA_1 Compliance Assistance
 
Electronic Communication 04/22/2019 Satisfied PERRY_JF_2 Routine Compliance
 
Site Inspection 04/22/2019 Major Out of Compliance PERRY_JF_2 0/1 Routine Compliance
 
Phone Conversation 04/22/2019 Satisfied PERRY_JF_2 Routine Compliance
 
Letter 04/22/2019 Satisfied PERRY_JF_2 Compliance Assistance
 
Letter 01/15/2018 Satisfied PERRY_JF_2 Compliance Assistance
 
Site Inspection 08/29/2017 In Compliance PERRY_JF_2 0/1 Non-Compliance
 
Electronic Communication 06/07/2017 Satisfied PERRY_JF_2 Non-Compliance
 
Electronic Communication 01/24/2017 Satisfied PERRY_JF_2 Non-Compliance
 
Electronic Communication 01/20/2017 Satisfied PERRY_JF_2 Non-Compliance
 
Letter 01/06/2017 Satisfied RAUENZAHN_RA_1 Non-Compliance
 
Letter 12/22/2016 Satisfied RAUENZAHN_RA_1 Non-Compliance
 
Letter 12/11/2016 Satisfied PERRY_JF_2 Non-Compliance
 
Letter 12/11/2016 Satisfied PERRY_JF_2 Non-Compliance
 
Site Inspection 12/09/2016 Minor Out of Compliance PERRY_JF_2 0/1 Routine Compliance
 
Site Inspection 12/09/2016 Major Out of Compliance PERRY_JF_2 0/1 Non-Compliance
 
Electronic Communication 03/05/2015 Satisfied PERRY_JF_2 Non-Compliance
 
Letter 02/26/2015 Satisfied RAUENZAHN_RA_1 Non-Compliance
 
Electronic Communication 02/18/2015 Satisfied PERRY_JF_2 Non-Compliance
 
Site Inspection 02/18/2015 Major Out of Compliance PERRY_JF_2 0/1 Routine Compliance
 
Letter 02/18/2015 Satisfied PERRY_JF_2 Non-Compliance
 
Electronic Communication 02/17/2015 Satisfied PERRY_JF_2 Non-Compliance
 
Emergency Preparedness Information 02/04/2015 Satisfied PERRY_JF_2 Routine Compliance
 
Site Inspection 07/16/2014 Major Out of Compliance PERRY_JF_2 0/1 Routine Compliance
 
Letter 07/16/2014 Satisfied PERRY_JF_2 Non-Compliance
 
Phone Conversation 07/14/2014 Satisfied PERRY_JF_2 Non-Compliance
 
Letter 07/02/2014 Satisfied RAUENZAHN_RA_1 Non-Compliance
 
Letter 06/29/2014 Satisfied PERRY_JF_2 Non-Compliance
 
Site Inspection 06/29/2014 Major Out of Compliance PERRY_JF_2 0/1 Non-Compliance
 
Letter 03/28/2014 Satisfied PERRY_JF_2 Non-Compliance
 
Site Inspection 03/28/2014 Major Out of Compliance PERRY_JF_2 0/1 Routine Compliance
 
Emergency Preparedness Information 03/10/2014 Satisfied PERRY_JF_2 Routine Compliance
 
Enforcement Tracking 02/06/2013 Closed With Enforcement SCHULTZ_C Enforcement
 
Site Inspection 05/26/2012 In Compliance JOHNSON_CJ 0/1 QA/QC
 
Site Inspection 05/18/2012 In Compliance COIL_JM_1 0/1 Routine Compliance
 
Emergency Preparedness Information 05/08/2012 Satisfied COIL_JM_1 Routine Compliance
 
Phone Conversation 05/03/2012 Satisfied COIL_JM_1 Routine Compliance
 
Site Inspection 04/12/2012 In Compliance SCHULTZ_C 0/1 Enforcement
 
Meeting 10/17/2011 Satisfied CRAFT_TT_1 Closure
 
Record Document 09/28/2011 Satisfied CRAFT_TT_1 Non-Compliance
 
Phone Conversation 09/23/2011 Satisfied CRAFT_TT_1 Closure
 
Phone Conversation 09/16/2011 Satisfied CRAFT_TT_1 Non-Compliance
 
Phone Conversation 08/05/2011 Satisfied CRAFT_TT_1 Non-Compliance
 
Phone Conversation 07/28/2011 Satisfied CRAFT_TT_1 Closure
 
Meeting 07/06/2011 Satisfied SCHULTZ_C Enforcement
 
Site Inspection 05/20/2011 Major Out of Compliance CRAFT_TT_1 0/5 Routine Compliance
 
Phone Conversation 09/23/2010 Satisfied STAFFORD_P_1 Closure
 
Electronic Communication 09/23/2010 Satisfied STAFFORD_P_1 Closure
 
Site Inspection 08/18/2010 Major Out of Compliance SCHULTZ_C 0/5 Enforcement
 
Site Inspection 06/03/2010 Major Out of Compliance CRAFT_TT_1 0/5 Routine Compliance
 
Site Inspection 08/07/2009 Major Out of Compliance STAFFORD_P_1 0/1 Installation
 
Phone Conversation 07/22/2009 Satisfied STAFFORD_P_1 Installation
 
Record Document 03/30/2009 Satisfied STAFFORD_P_1 Installation
 
Record Document 03/26/2009 Satisfied STAFFORD_P_1 Installation
 
Record Document 03/26/2009 Satisfied STAFFORD_P_1 Installation
 
Site Inspection 03/23/2009 Major Out of Compliance STAFFORD_P_1 0/5 Closure
 
Record Document 03/16/2009 Satisfied LEIGH_MM_1 Closure
 
Record Document 03/10/2009 Satisfied LEIGH_MM_1 Closure
 
Record Document 02/18/2009 Satisfied LEIGH_MM_1 Closure
 
Record Document 02/12/2009 Satisfied LEIGH_MM_1 Closure
 
Phone Conversation 01/23/2009 Satisfied STAFFORD_P_1 Closure
 
Site Inspection 07/25/2008 Major Out of Compliance SHIELDS_DJ 0/5 Routine Compliance
 
Enforcement Referral 12/03/2007 Accepted ALDERMAN_J Enforcement
 
Site Inspection 07/18/2007 Major Out of Compliance LEIGH_MM_1 0/5 Non-Compliance
 
Record Document 07/18/2007 Satisfied LEIGH_MM_1 Non-Compliance
 
Letter 07/18/2007 Satisfied LEIGH_MM_1 Non-Compliance
 
Record Document 06/06/2007 Satisfied LEIGH_MM_1 Non-Compliance
 
Record Document 05/17/2007 Satisfied LEIGH_MM_1 Non-Compliance
 
Enforcement Referral Activity - OLD 05/09/2007 Cancelled LEIGH_MM_1 Enforcement
 
Site Inspection 04/26/2007 Major Out of Compliance MOSER_T 0/5 Routine Compliance
 
Emergency Preparedness Information 02/14/2007 Satisfied LEIGH_MM_1 Routine Compliance
 
Letter 01/18/2007 Satisfied LEIGH_MM_1 Non-Compliance
 
Emergency Preparedness Information 09/20/2006 Satisfied MOSER_T Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
05/05/2022 6001 Minor 2.1 No reasonable access provided. Please arrange for access to be provided to system components. Or, alternatively, please have all current integrity testing completed. All testing records should be supplied promptly for review.
 
05/05/2022 6073 Minor 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. Please have the liquids removed by and properly disposed of. Please supply a work order and disposal manifest for liquid removal.
 
02/18/2020 5014 Minor 1.7 Incident investigation not completed timely, with written explanation or DRF provided. Please perform an investigation at dispenser liner 3/4 to determine if a new discharge has occurred.
 
02/18/2020 5174 Minor 1.6 Incident notification not submitted within 72-hours for mineral acid tanks. Please submit an INF to document the failed test of dispenser liner 3/4.
 
11/04/2019 4014 SNC-B 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. Please provide documentation of financial responsibility for 2011 to present.
 
11/04/2019 4086 SNC-B 5.5 Storage tank systems not closed as required. Please provide documentation of continuous financial responsibility for storage tanks since 2011 or provide plans to remove storage tank systems.
 
04/22/2019 4067 Minor 4.2 Release detection devices not tested annually. Have all release detection devices properly tested. Send documentation to inspector at jacqueline.perry@ocfl.net.
 
04/22/2019 4057 Minor 4.31 Overfill protection devices not registered or tested annually. Have overfill protection properly installed. Send documentation to inspector at jacqueline.perry@ocfl.net.
 
04/09/2019 4076 Minor 4.11 Failure to conduct required periodic containment and interstitial integrity testing. Have spill buckets, dispenser pans, and STP sumps integrity testing. Send documentation to inspector at jacqueline.perry@ocfl.net.
 
 
 
No Discharges Found