![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Retail Station | ||||||||
County | Volusia | Status | OPEN | ||||||||
ID | 8517390 | Latitude | 29° 4' 37.7718 | ||||||||
Name |
FIFO INC 2500 N WOODLAND BLVD |
Longitude | 81° 18' 46.847 | ||||||||
DELAND, FL 32720 | LL Method | DPHO | |||||||||
Contact | KWONG HO PAK | LL Status | REVIEWED | ||||||||
Phone | (386) 873-4825 | Status Date | 10/15/2003 | ||||||||
Account Owner Information | |||||||||||
Name | FIFO INC 5329 NEWHALL AVE ORLANDO, FL 32810 |
Effective Date | 11/04/2005 | ||||||||
Contact | KWONG HO PAK OR SEI JUNG PAK | ||||||||||
Phone | (407) 687-1512 | ||||||||||
AAHADAWAL@YAHOO.COM | |||||||||||
Placard # / Date | 702152 - 10/11/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | FIFO INC 5329 NEWHALL AVE ORLANDO, FL 32810 |
Effective Date | 11/04/2005 | ||||||||
Contact | KWONG HO PAK OR SEI JUNG PAK | ||||||||||
Phone | (407) 687-1512 | ||||||||||
AAHADAWAL@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 25000 | Unleaded Gas (B) | 03/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Unleaded Gas (B) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(S) Statistical Inventory Reconcile | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Unleaded Gas (B) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(S) Statistical Inventory Reconcile | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(S) Statistical Inventory Reconcile | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Kerosene (K) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(S) Statistical Inventory Reconcile | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 3000 | Vehicular Diesel (D) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(S) Statistical Inventory Reconcile | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 06/30/2017 | 06/30/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/30/2017 | 06/30/2018 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 06/30/2016 | 06/30/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/30/2014 | 06/30/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/30/2011 | 06/30/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 06/30/2009 | 06/30/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 02/15/1992 | 03/15/1996 | FPLIPA | ||||||||
INSURANCE | 12/31/1990 | 12/31/1991 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 04/12/2006 | 04/18/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | MOSER_T | 0/5 | COMPLIANCE ASSURANCE | |||||
Completion Notes NUMEROUS VIOLATIONS NOTED. | |||||||||||
CALL | 11/03/2005 | 11/03/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PER RUTH, DIESEL NOZZLE HAS BEEN REPLACED. STILL WORKING ON BENT VENT PIPE. | |||||||||||
CWOE | 10/28/2005 | 10/28/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NFA CONCERNING THE LATEST TCI. | |||||||||||
SV | 10/26/2005 | 10/28/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REINSPECTION INDICATED THE PREVIOUS N/C ITEMS WERE CORRECTED. | |||||||||||
RRBD | 09/27/2005 | 10/06/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D LETTER. ALL REPAIRS HAVE BEEN MADE. READY FOR REINSPETION. | |||||||||||
CALL | 09/15/2005 | 09/19/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D FAX FROM RUTH. KEROSENE FILLPORT LID IS PROPERTY MARKED. THEY ARE REPLACING HOSES & REMOVING LIQUID FROM FILLPORTS & SUMPS. WILL CALL FOR REINSPECTION. | |||||||||||
CALL | 09/13/2005 | 09/13/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RUTH ASKED IF SHE HAS TO HAVE ALL OF THE HOSES REPLACED. TOLD HER JUST THE ONES WITH EXPOSED THREADS. LINERS, SUMPS HAVE BEEN EMPTIES. SHE WILL CK THEM AGAIN & CALL FOR REINSPECT. | |||||||||||
WLI | 09/02/2005 | 09/02/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO FURTHER RESPONSE. | |||||||||||
TCR | 07/08/2005 | 07/08/2005 | IN-COMPLIANCE | DJ | 0/5 | COMPLIANCE ASSURANCE | |||||
Completion Notes TCR INDICATED THE KEROSENE FILL WAS PROPERLY MARKED. THE DISPENSER HOSES WERE NOT CHANGED. THE DISPENSER LINER 1/2 SLUDGE REMAINS, KEROSENE LINER HAS WATER, AND ALL SPILL BUCKETS HAVE WATER/PRODUCT. DIESEL STP PIPING SUMP O.K. | |||||||||||
RRBD | 06/16/2005 | 06/30/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ALL NC ITEMS HAVE BEEN CORRECTED. REINSPECT. | |||||||||||
NCLI | 05/25/2005 | 06/30/2005 | DERRICK FRITTS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes DISTRICT SENT NCL. | |||||||||||
TCQA | 05/10/2005 | 05/25/2005 | MINOR OUT-OF-COMPLIANCE | FRITTS_D | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 04/25/2005 | 04/28/2005 | IN-COMPLIANCE | MOSER_T | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 04/13/2004 | 04/29/2004 | MINOR OUT-OF-COMPLIANCE | MOSER_T | 0/4 | COMPLIANCE ASSURANCE | |||||
CWOE | 06/26/2003 | 06/26/2003 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NFA CONCERNING THE PREVIOUS TCI AT THIS FACILITY. | |||||||||||
TCR | 06/26/2003 | 06/26/2003 | IN-COMPLIANCE | DJ | 0/5 | COMPLIANCE ASSURANCE | |||||
Completion Notes REINSPECTION INDICATED THE NON-COMPLIANCE ISSUE HAS BEEN RESOLVED. | |||||||||||
RRBD | 06/25/2003 | 06/25/2003 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED DOCUMENTATION INDICATING THE NON-COMPLIANCE ISSUES HAVE BEEN CORRECTED. WILL SCHEDULE REINSPECTION TO VERIFY. | |||||||||||
NCLI | 06/11/2003 | 06/11/2003 | TLM | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NCL MAILED 6/11/03. NO RESPONSE FROM FACILITY. | |||||||||||
TCI | 04/10/2003 | 04/10/2003 | MINOR OUT-OF-COMPLIANCE | DJ | 0/5 | COMPLIANCE ASSURANCE | |||||
Completion Notes DISPENSER #2 HAS A FILTER LEAKING AND PRODUCT IN LINER. | |||||||||||
RRBD | 06/07/2002 | 06/07/2002 | COMPLIANCE ASSURANCE | ||||||||
TCI | 04/23/2002 | 04/23/2002 | MINOR OUT-OF-COMPLIANCE | DJ | 0/5 | COMPLIANCE ASSURANCE | |||||
RRBD | 05/27/2001 | 06/05/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 04/12/2001 | 04/26/2001 | MINOR OUT-OF-COMPLIANCE | LLW | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 06/22/2000 | 06/22/2000 | IN-COMPLIANCE | LLW | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 06/01/1999 | 07/01/1999 | MINOR OUT-OF-COMPLIANCE | MOSER_T | 0/5 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Record Document | 05/04/2025 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Electronic Communication | 04/29/2025 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Letter | 10/12/2023 | Satisfied | BOYLES_S | Enforcement | |||||||
Enforcement Referral | 08/29/2023 | Accepted | GREGORY_JW_1 | Enforcement | |||||||
Letter | 07/14/2023 | Satisfied | GREGORY_JW_1 | Compliance Assistance | |||||||
Letter | 07/14/2023 | Satisfied | GREGORY_JW_1 | Compliance Assistance | |||||||
Electronic Communication | 05/10/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 05/05/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 05/05/2022 | Major Out of Compliance | PIERCE_BN_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 05/03/2022 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Electronic Communication | 09/02/2021 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 02/18/2020 | Satisfied | RAUENZAHN_RA_1 | Enforcement | |||||||
Electronic Communication | 02/18/2020 | Satisfied | RAUENZAHN_RA_1 | Enforcement | |||||||
Electronic Communication | 11/19/2019 | Satisfied | RAUENZAHN_RA_1 | Enforcement | |||||||
Record Document | 11/15/2019 | Satisfied | RAUENZAHN_RA_1 | Enforcement | |||||||
Electronic Communication | 11/04/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Issue Document | 11/04/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Enforcement Referral | 11/04/2019 | Accepted | RAUENZAHN_RA_1 | Enforcement | |||||||
Phone Conversation | 06/20/2019 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Letter | 05/15/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Site Inspection | 04/22/2019 | Major Out of Compliance | PERRY_JF_2 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 04/22/2019 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Letter | 04/22/2019 | Satisfied | PERRY_JF_2 | Compliance Assistance | |||||||
Electronic Communication | 04/22/2019 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Letter | 01/15/2018 | Satisfied | PERRY_JF_2 | Compliance Assistance | |||||||
Site Inspection | 08/29/2017 | In Compliance | PERRY_JF_2 | 0/1 | Non-Compliance | ||||||
Electronic Communication | 06/07/2017 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Electronic Communication | 01/24/2017 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Electronic Communication | 01/20/2017 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Letter | 01/06/2017 | Satisfied | RAUENZAHN_RA_1 | Non-Compliance | |||||||
Letter | 12/22/2016 | Satisfied | RAUENZAHN_RA_1 | Non-Compliance | |||||||
Letter | 12/11/2016 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Letter | 12/11/2016 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Site Inspection | 12/09/2016 | Minor Out of Compliance | PERRY_JF_2 | 0/1 | Routine Compliance | ||||||
Site Inspection | 12/09/2016 | Major Out of Compliance | PERRY_JF_2 | 0/1 | Non-Compliance | ||||||
Electronic Communication | 03/05/2015 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Letter | 02/26/2015 | Satisfied | RAUENZAHN_RA_1 | Non-Compliance | |||||||
Letter | 02/18/2015 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Site Inspection | 02/18/2015 | Major Out of Compliance | PERRY_JF_2 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 02/18/2015 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Electronic Communication | 02/17/2015 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/04/2015 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Letter | 07/16/2014 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Site Inspection | 07/16/2014 | Major Out of Compliance | PERRY_JF_2 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 07/14/2014 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Letter | 07/02/2014 | Satisfied | RAUENZAHN_RA_1 | Non-Compliance | |||||||
Site Inspection | 06/29/2014 | Major Out of Compliance | PERRY_JF_2 | 0/1 | Non-Compliance | ||||||
Letter | 06/29/2014 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Letter | 03/28/2014 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Site Inspection | 03/28/2014 | Major Out of Compliance | PERRY_JF_2 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/10/2014 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Enforcement Tracking | 02/06/2013 | Closed With Enforcement | SCHULTZ_C | Enforcement | |||||||
Site Inspection | 05/26/2012 | In Compliance | JOHNSON_CJ | 0/1 | QA/QC | ||||||
Site Inspection | 05/18/2012 | In Compliance | COIL_JM_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/08/2012 | Satisfied | COIL_JM_1 | Routine Compliance | |||||||
Phone Conversation | 05/03/2012 | Satisfied | COIL_JM_1 | Routine Compliance | |||||||
Site Inspection | 04/12/2012 | In Compliance | SCHULTZ_C | 0/1 | Enforcement | ||||||
Meeting | 10/17/2011 | Satisfied | CRAFT_TT_1 | Closure | |||||||
Record Document | 09/28/2011 | Satisfied | CRAFT_TT_1 | Non-Compliance | |||||||
Phone Conversation | 09/23/2011 | Satisfied | CRAFT_TT_1 | Closure | |||||||
Phone Conversation | 09/16/2011 | Satisfied | CRAFT_TT_1 | Non-Compliance | |||||||
Phone Conversation | 08/05/2011 | Satisfied | CRAFT_TT_1 | Non-Compliance | |||||||
Phone Conversation | 07/28/2011 | Satisfied | CRAFT_TT_1 | Closure | |||||||
Meeting | 07/06/2011 | Satisfied | SCHULTZ_C | Enforcement | |||||||
Site Inspection | 05/20/2011 | Major Out of Compliance | CRAFT_TT_1 | 0/5 | Routine Compliance | ||||||
Electronic Communication | 09/23/2010 | Satisfied | STAFFORD_P_1 | Closure | |||||||
Phone Conversation | 09/23/2010 | Satisfied | STAFFORD_P_1 | Closure | |||||||
Site Inspection | 08/18/2010 | Major Out of Compliance | SCHULTZ_C | 0/5 | Enforcement | ||||||
Site Inspection | 06/03/2010 | Major Out of Compliance | CRAFT_TT_1 | 0/5 | Routine Compliance | ||||||
Site Inspection | 08/07/2009 | Major Out of Compliance | STAFFORD_P_1 | 0/1 | Installation | ||||||
Phone Conversation | 07/22/2009 | Satisfied | STAFFORD_P_1 | Installation | |||||||
Record Document | 03/30/2009 | Satisfied | STAFFORD_P_1 | Installation | |||||||
Record Document | 03/26/2009 | Satisfied | STAFFORD_P_1 | Installation | |||||||
Record Document | 03/26/2009 | Satisfied | STAFFORD_P_1 | Installation | |||||||
Site Inspection | 03/23/2009 | Major Out of Compliance | STAFFORD_P_1 | 0/5 | Closure | ||||||
Record Document | 03/16/2009 | Satisfied | LEIGH_MM_1 | Closure | |||||||
Record Document | 03/10/2009 | Satisfied | LEIGH_MM_1 | Closure | |||||||
Record Document | 02/18/2009 | Satisfied | LEIGH_MM_1 | Closure | |||||||
Record Document | 02/12/2009 | Satisfied | LEIGH_MM_1 | Closure | |||||||
Phone Conversation | 01/23/2009 | Satisfied | STAFFORD_P_1 | Closure | |||||||
Site Inspection | 07/25/2008 | Major Out of Compliance | SHIELDS_DJ | 0/5 | Routine Compliance | ||||||
Enforcement Referral | 12/03/2007 | Accepted | ALDERMAN_J | Enforcement | |||||||
Site Inspection | 07/18/2007 | Major Out of Compliance | LEIGH_MM_1 | 0/5 | Non-Compliance | ||||||
Record Document | 07/18/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 07/18/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 06/06/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 05/17/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Enforcement Referral Activity - OLD | 05/09/2007 | Cancelled | LEIGH_MM_1 | Enforcement | |||||||
Site Inspection | 04/26/2007 | Major Out of Compliance | MOSER_T | 0/5 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | LEIGH_MM_1 | Routine Compliance | |||||||
Letter | 01/18/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/20/2006 | Satisfied | MOSER_T | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/05/2025 | 6043 | Minor | 4.13 Fillbox covers not marked according to requirements. | The PUL fill port lid should be repainted all red. Please supply a picture for review once complete. | |||||||
05/05/2025 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Please begin conducting the monthly visual inspections of the tank. Inspections should be performed & documented every 30-35 days. Please provide the next two months of monthly visual inspections & liquid status reports as completed. | |||||||
05/05/2025 | 6002 | Minor | 2.1 Operator Training records not available. | Please have applicable representatives complete operator A/B & C training. Please use the following link to access approved operator training for Florida: https://floridadep.gov/waste/permitting-compliance-assistance/content/underground-storage-tank-operator-training | |||||||
05/05/2022 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Please have the liquids removed by and properly disposed of. Please supply a work order and disposal manifest for liquid removal. | |||||||
05/05/2022 | 6001 | Minor | 2.1 No reasonable access provided. | Please arrange for access to be provided to system components. Or, alternatively, please have all current integrity testing completed. All testing records should be supplied promptly for review. | |||||||
02/18/2020 | 5014 | Minor | 1.7 Incident investigation not completed timely, with written explanation or DRF provided. | Please perform an investigation at dispenser liner 3/4 to determine if a new discharge has occurred. | |||||||
02/18/2020 | 5174 | Minor | 1.6 Incident notification not submitted within 72-hours for mineral acid tanks. | Please submit an INF to document the failed test of dispenser liner 3/4. | |||||||
11/04/2019 | 4086 | SNC-B | 5.5 Storage tank systems not closed as required. | Please provide documentation of continuous financial responsibility for storage tanks since 2011 or provide plans to remove storage tank systems. | |||||||
11/04/2019 | 4014 | SNC-B | 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. | Please provide documentation of financial responsibility for 2011 to present. | |||||||
04/22/2019 | 4057 | Minor | 4.31 Overfill protection devices not registered or tested annually. | Have overfill protection properly installed. Send documentation to inspector at jacqueline.perry@ocfl.net. | |||||||
04/22/2019 | 4067 | Minor | 4.2 Release detection devices not tested annually. | Have all release detection devices properly tested. Send documentation to inspector at jacqueline.perry@ocfl.net. | |||||||
04/09/2019 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | Have spill buckets, dispenser pans, and STP sumps integrity testing. Send documentation to inspector at jacqueline.perry@ocfl.net. | |||||||
No Discharges Found |