![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Retail Station | ||||||||
County | Volusia | Status | OPEN | ||||||||
ID | 8517455 | Latitude | 29° 15' 17.3523 | ||||||||
Name |
SNS QUICK MART 1537 RIDGEWOOD AVE |
Longitude | 81° 2' 45.6802 | ||||||||
HOLLY HILL, FL 32117 | LL Method | DPHO | |||||||||
Contact | KEVIN PATEL | LL Status | REVIEWED | ||||||||
Phone | (386) 872-4949 | Status Date | 10/04/2022 | ||||||||
Account Owner Information | |||||||||||
Name | SNS STORES LLC 1537 RIDGEWOOD AVE HOLLY HILL, FL 32117 |
Effective Date | 02/24/2017 | ||||||||
Contact | SHITAL BEN PATEL | ||||||||||
Phone | (321) 662-3851 | ||||||||||
SITALP66@HOTMAIL.COM | |||||||||||
Placard # / Date | 687402 - 06/12/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | S N S STORES LLC 871 BLAIRMONT LN LAKE MARY, FL 32746 |
Effective Date | 03/30/2020 | ||||||||
Contact | |||||||||||
Phone | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 11/01/1987 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Unleaded Gas (B) | 11/01/1987 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Unleaded Gas (B) | 11/01/1987 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 10000 | Vehicular Diesel (D) | 11/01/1987 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 10/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass |
(D) External protective coating | (H) Mechanical line leak detector | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Unleaded Gas (B) | 09/01/1970 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 05/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Leaded Gas (A) | 12/01/1959 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Leaded Gas (A) | 12/01/1959 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 02/27/2022 | 02/27/2023 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 02/27/2021 | 02/27/2022 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 02/27/2020 | 02/27/2021 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 02/27/2019 | 02/27/2020 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 02/27/2018 | 02/27/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 02/27/2017 | 02/27/2018 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 02/26/2016 | 02/27/2017 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 12/01/2014 | 12/01/2015 | AIG | ||||||||
INSURANCE | 07/30/2011 | 07/30/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/31/2010 | 07/31/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 07/31/2009 | 07/31/2010 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 07/19/2005 | 07/21/2005 | IN-COMPLIANCE | DJ | 0/4 | COMPLIANCE ASSURANCE | |||||
CWOE | 08/27/2004 | 08/27/2004 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NFA CONCERNING THE LATEST TCI. | |||||||||||
RRBD | 08/27/2004 | 08/27/2004 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED DOCUMENTATION ADDRESSING THE NC ISSUES. ALL ITEMS COMPLETED. | |||||||||||
NCLI | 08/12/2004 | 08/13/2004 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes MAILED NCLI TO FACILITY. | |||||||||||
TCI | 07/21/2004 | 07/22/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | DJ | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes FR NOT AVAILABLE. RD EQUIPMENT ANNUAL CERTIFICATION NOT AVAILABLE. | |||||||||||
RRBD | 07/25/2003 | 08/05/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 07/24/2003 | 08/05/2003 | MINOR OUT-OF-COMPLIANCE | MOSER_T | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/01/2002 | 12/20/2002 | DS | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/09/2002 | 07/09/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | DJ | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 08/01/2001 | 08/02/2001 | IN-COMPLIANCE | LLW | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 09/05/2000 | 09/28/2000 | IN-COMPLIANCE | MOSER_T | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 10/19/1999 | 11/01/1999 | IN-COMPLIANCE | MOSER_T | 4/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/24/1999 | 10/13/1999 | MINOR OUT-OF-COMPLIANCE | T MOSER | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/24/1999 | 10/18/1999 | MOSER_T | 0/4 | COMPLIANCE ASSURANCE | ||||||
UTCI | 02/23/1998 | 03/02/1998 | SIGNIFICANT OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 03/25/2025 | Satisfied | KIDDER_MS_1 | Closure | |||||||
Electronic Communication | 03/17/2025 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 02/27/2025 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Enforcement Referral | 09/16/2024 | Accepted | RIVERA_JX_2 | Enforcement | |||||||
Electronic Communication | 07/18/2024 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 05/22/2024 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 05/17/2024 | Major Out of Compliance | PIERCE_BN_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 05/14/2024 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Electronic Communication | 07/15/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 07/14/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 04/11/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 04/11/2022 | Major Out of Compliance | PIERCE_BN_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 03/27/2022 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Electronic Communication | 06/04/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 01/26/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 06/26/2020 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 03/08/2020 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 03/08/2020 | Minor Out of Compliance | PIERCE_BN_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 02/25/2020 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Enforcement Tracking | 04/03/2018 | Closed Without Enforcement | JOHNSON_CJ | Enforcement | |||||||
Electronic Communication | 04/03/2018 | Satisfied | JOHNSON_CJ | Enforcement | |||||||
Electronic Communication | 03/26/2018 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 03/26/2018 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 03/21/2018 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Enforcement Referral | 09/25/2017 | Accepted | RAUENZAHN_RA_1 | Enforcement | |||||||
Letter | 09/22/2017 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Letter | 07/08/2017 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Site Inspection | 06/08/2017 | Major Out of Compliance | PERRY_JF_2 | 0/4 | Non-Compliance | ||||||
Letter | 06/08/2017 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Electronic Communication | 03/29/2017 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Electronic Communication | 03/24/2017 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Electronic Communication | 02/27/2017 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Letter | 02/25/2017 | Satisfied | RAUENZAHN_RA_1 | Non-Compliance | |||||||
Electronic Communication | 02/24/2017 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Site Inspection | 02/24/2017 | Major Out of Compliance | PERRY_JF_2 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 02/24/2017 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Letter | 02/24/2017 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Letter | 02/24/2017 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Meeting | 01/07/2017 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 02/23/2015 | Minor Out of Compliance | PERRY_JF_2 | 0/4 | Routine Compliance | ||||||
Letter | 02/23/2015 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/10/2015 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 01/10/2012 | In Compliance | COIL_JM_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 11/29/2010 | In Compliance | COIL_JM_1 | 0/4 | Routine Compliance | ||||||
Record Document | 10/19/2009 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 10/12/2009 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 10/01/2009 | Major Out of Compliance | COIL_JM_1 | 0/4 | Routine Compliance | ||||||
Letter | 10/01/2009 | Satisfied | COIL_JM_1 | Non-Compliance | |||||||
Site Inspection | 09/02/2009 | In Compliance | COIL_JM_1 | 0/9 | Routine Compliance | ||||||
Record Document | 11/06/2008 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 10/14/2008 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 10/14/2008 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 09/24/2008 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 09/08/2008 | Major Out of Compliance | COIL_JM_1 | 0/4 | Routine Compliance | ||||||
Record Document | 08/28/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 08/28/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 08/20/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 08/03/2007 | Minor Out of Compliance | SHIELDS_DJ | 0/4 | Routine Compliance | ||||||
Site Inspection | 03/01/2007 | In Compliance | SHIELDS_DJ | 0/4 | Closure | ||||||
Site Inspection | 03/01/2007 | In Compliance | SHIELDS_DJ | 0/4 | Installation | ||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | LEIGH_MM_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/25/2006 | Satisfied | LEIGH_MM_1 | Routine Compliance | |||||||
Letter | 08/07/2006 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 08/07/2006 | In Compliance | LEIGH_MM_1 | 0/9 | Non-Compliance | ||||||
Letter | 08/04/2006 | Warning Letter Issued | LEIGH_MM_1 | Non-Compliance | |||||||
Phone Conversation | 07/19/2006 | Satisfied | SHIELDS_DJ | Non-Compliance | |||||||
Site Inspection | 07/07/2006 | Major Out of Compliance | SHIELDS_DJ | 0/4 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/17/2024 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Please begin conducting the monthly visual inspections of the tanks. Please provide the next two months of inspections as completed. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
02/26/1991 | COMBINED | 9 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
09/01/1988 | INACTIVE | 9 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||