Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Retail Station | ||||||||
County | Volusia | Status | OPEN | ||||||||
ID | 8517554 | Latitude | 29° 13' 29.0962 | ||||||||
Name |
The Rite Track 580 MASON AVE |
Longitude | 81° 2' 10.2917 | ||||||||
PALATKA, FL 32177 | LL Method | DPHO | |||||||||
Contact | EMAD KHAN | LL Status | REVIEWED | ||||||||
Phone | (561) 756-1291 | Status Date | 10/04/2022 | ||||||||
Account Owner Information | |||||||||||
Name | VALERO-580 MASON AVE 580 Mason Ave Daytona Beach, FL 32117 |
Effective Date | 04/06/2004 | ||||||||
Contact | EMAD KHAN | ||||||||||
Phone | (561) 756-1291 | ||||||||||
EMAD561@GMAIL.COM | |||||||||||
Placard # / Date | 701314 - 09/09/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | VALERO-580 MASON AVE 580 Mason Ave Daytona Beach, FL 32117 |
Effective Date | 09/09/2024 | ||||||||
Contact | EMAD KHAN | ||||||||||
Phone | (561) 756-1291 | ||||||||||
EMAD561@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 16000 | Unleaded Gas (B) | 10/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (8) Manually sampled wells (K) Monitor dbl wall pipe space (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Unleaded Gas (B) | 12/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket |
(C) Fiberglass | (S) Statistical Inventory Reconcile | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Unleaded Gas (B) | 12/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket |
(C) Fiberglass | (S) Statistical Inventory Reconcile | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 12/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket |
(C) Fiberglass | (S) Statistical Inventory Reconcile | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 03/13/2020 | 03/13/2021 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 01/10/2020 | 01/10/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/10/2019 | 01/10/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/10/2018 | 01/10/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/10/2017 | 01/10/2018 | ACE | ||||||||
INSURANCE | 01/31/2015 | 01/31/2016 | ACE | ||||||||
INSURANCE | 01/10/2013 | 01/10/2014 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/10/2012 | 01/10/2013 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/10/2011 | 01/10/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/10/2010 | 01/10/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/10/2009 | 01/10/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 02/15/1992 | 03/15/1996 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
CALL | 03/21/2006 | 03/21/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED CALL FROM MR. CHOWDHURY, WILL FAX ALL REQUIRED PAPERWORK IN BY NEXT WEEK. | |||||||||||
NCLI | 03/06/2006 | 03/06/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NCL SENT | |||||||||||
TCI | 02/01/2006 | 02/01/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | DJ | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes SIR'S OR INVENTORY NOT AVAILABLE. STP MANWAYS UNL. & MID. SEVERLY DETERIORATED AND COULD LEAD TO A POSSIBLE DISCHARGE. DISPENSER SHEAR VALVE ANCHOR POINTS ALSO DETERIORATED AND NEED REPLACING. FINAN. RESPONS. NOT AVAILABLE. | |||||||||||
CALL | 01/17/2006 | 01/23/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes IRA WILSON CALLED, SPILL BUCKETS HAVE BEEN REPLACED AND SUMP HAVE BEEN PUMPED OUT | |||||||||||
CALL | 01/13/2006 | 01/13/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED CALL FROM IRA WILSON (527-8539) THAT THE SUMPS WILL BE CLEANUP OUT BY THE END OF NEXT WEEK. WILL CONTACT THE OFFICE WHEN THE WORK IS COMPLETE. | |||||||||||
WLI | 12/30/2005 | 12/30/2005 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SENT WLI | |||||||||||
CALL | 08/30/2005 | 08/30/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes IRA WILSON-EXPLAINED PROPOSAL WE REC'D. OWNER HIRED CONSULTANT TO DO TESTING & PD FOR IT. CO HAS NOT ISSUED C.R. & WILL NOT RETUREN IRA'S OR OWNER'S CALLS. OWNER WILL NEED TO GET SOMEONE ELSE TO DO TESTING. | |||||||||||
RRBD | 08/24/2005 | 08/30/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RRBD- COPY OF PROPOSAL FOR CLOSURE REPORT, SHOWING PAYM. WAS MADE. WE STILL NEED CLOSURE REPORT. | |||||||||||
CALL | 08/11/2005 | 08/30/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes JACQUELINE NEEDS COPY OF CLOSURE REPORT FOR REPLACEMENT OF SPILL BUCKETS. WE DO NOT HAVE IT YET. | |||||||||||
CALL | 06/21/2005 | 07/05/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CALL FROM JACQUELINE FOR COPY OF INSTALLATION INSPECTION. INSTALL NOT COMPLETED. FAXED COPY OF WHAT HAS BEEN DONE. | |||||||||||
SV | 02/15/2005 | 02/21/2005 | KLAPPENBACH_J | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes MET T. MOSSER FROM COUNTY TO DO INSPECTION FOUND TWO VIOLATIONS RP MUST CORRECT VIOLATION AND PASS THREE MONTH OF SIRS REPORTS IN ORDER TO RELEASE FACILLITY TO THE COUNTY. | |||||||||||
TCI | 02/15/2005 | 02/17/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
CALL | 01/21/2005 | 01/28/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes DOUG GREEN CALLED TO SEE WHAT HE NEEDS TO DO TO HELP OWNER. REFERRED HIM TO DISTRICT. | |||||||||||
CALL | 12/21/2004 | 12/21/2004 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes IRA WILSON CALLED. TOLD HIM WE HAVE REC'D NOTHING. NEED COPIES OF EVERYTHING HE HAS ON NC ITEMS AND HAVE TEST DONE. | |||||||||||
LTR | 12/21/2004 | 12/21/2004 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ELRA LETTER SENT. | |||||||||||
RRBD | 06/14/2004 | 06/16/2004 | TLM | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED LETTER FROM IRA WILSON INDICATING WILSON PUMP WILL CORRECT THE NON-COMPLIANCE ISSUES AT THIS FAILITY. SHOULD COMPLETE WITHIN 2 WEEKS. | |||||||||||
TCI | 04/26/2004 | 04/28/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
CWOE | 08/20/2003 | 08/20/2003 | JOHNSON_CJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 07/11/2003 | 07/11/2003 | GT | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TANK LINER TEST RESULTS FAXED TO GT FROM RUTH OF DELCO OIL. | |||||||||||
TIN | 07/08/2003 | 07/23/2003 | IN-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
MEET | 06/17/2003 | 07/11/2003 | GT | 0/0 | COMPLIANCE ASSURANCE | ||||||
WLI | 05/16/2003 | 05/16/2003 | GT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/29/2003 | 04/30/2003 | IN-COMPLIANCE | DJ | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 03/12/2003 | 03/20/2003 | IN-COMPLIANCE | GT | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes TANK LINER INSPECTION | |||||||||||
RRBD | 02/04/2003 | 02/25/2003 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED A SECOND LETTER FROM DELCO STATING TANK TECH WAS CONTRACTED TO DO THE LINER INSPECTIONS. NO CONTRACT ACCOMPANIED THE LETTER. | |||||||||||
RRBD | 11/05/2002 | 02/25/2003 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED A LETTER FROM DELCO STATING THEY CONTRACTED WITH TANK TECH TO INSPECT LINERS. NO CONTRACT ACCOMPANIED THE LETTER. | |||||||||||
WLI | 10/21/2002 | 02/25/2003 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SENT WLI TO DELCO CONCERNING THE LINER TESTING. | |||||||||||
NCLI | 06/28/2002 | 02/25/2003 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SENT NCLI TO DELCO CONCERNING THE LINER TEST REQUIREMENT. NO RESPONSE. | |||||||||||
RRBD | 06/07/2002 | 06/07/2002 | COMPLIANCE ASSURANCE | ||||||||
TCI | 05/01/2002 | 05/15/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 05/15/2001 | 05/17/2001 | LLW | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/27/2001 | 05/01/2001 | MINOR OUT-OF-COMPLIANCE | LLW | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 06/20/2000 | 06/20/2000 | IN-COMPLIANCE | LLW | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 09/02/1999 | 10/13/1999 | IN-COMPLIANCE | T MOSER | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 08/11/1999 | 09/07/1999 | IN-COMPLIANCE | MOSER_T | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 08/11/1999 | 09/07/1999 | MINOR OUT-OF-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 05/27/1999 | 06/04/1999 | MINOR OUT-OF-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 02/09/1999 | 03/10/1999 | IN-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes MOSER_T | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 04/07/2025 | Satisfied | DEVICTORIA_F | Compliance Assistance | |||||||
Enforcement Tracking | 04/04/2025 | Closed Without Enforcement | DEVICTORIA_F | Enforcement | |||||||
Document Management | 01/06/2025 | Satisfied | PIERCE_BN_1 | Closure | |||||||
Enforcement Referral | 12/26/2024 | Accepted | RIVERA_JX_2 | Enforcement | |||||||
Enforcement Tracking | 10/30/2024 | Closed With Enforcement | DEVICTORIA_F | Enforcement | |||||||
Document Management | 10/03/2024 | Satisfied | DEVICTORIA_F | Enforcement | |||||||
Letter | 09/18/2024 | Satisfied | PEREZ_EX_1 | Compliance Assistance | |||||||
Electronic Communication | 09/10/2024 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||||||
Document Management | 08/30/2024 | Satisfied | DEVICTORIA_F | Enforcement | |||||||
Letter | 05/22/2024 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 05/14/2024 | Major Out of Compliance | PIERCE_BN_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 05/06/2024 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Electronic Communication | 03/01/2023 | Satisfied | WILLIS_F | Enforcement | |||||||
Electronic Communication | 03/01/2023 | Satisfied | WILLIS_F | Enforcement | |||||||
Electronic Communication | 03/01/2023 | Satisfied | WILLIS_F | Enforcement | |||||||
Meeting | 02/24/2023 | Satisfied | WILLIS_F | Enforcement | |||||||
Electronic Communication | 12/28/2022 | Satisfied | WILLIS_F | Enforcement | |||||||
Letter | 07/29/2022 | Satisfied | BOYLES_S | Enforcement | |||||||
Electronic Communication | 06/02/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 04/27/2022 | Satisfied | DALTON_K | Enforcement | |||||||
Enforcement Referral | 04/25/2022 | Accepted | RAUENZAHN_RA_1 | Enforcement | |||||||
Electronic Communication | 03/16/2022 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Issue Document | 03/16/2022 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Letter | 03/15/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 03/15/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 03/14/2022 | Major Out of Compliance | PIERCE_BN_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 02/21/2022 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Electronic Communication | 09/02/2021 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 07/14/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 01/05/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 04/06/2020 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 04/06/2020 | Major Out of Compliance | PIERCE_BN_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 03/18/2020 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Site Inspection | 03/15/2017 | In Compliance | PERRY_JF_2 | 0/1 | Routine Compliance | ||||||
Site Inspection | 05/13/2015 | In Compliance | PERRY_JF_2 | 0/1 | Closure | ||||||
Site Inspection | 04/27/2015 | In Compliance | PERRY_JF_2 | 0/1 | Installation | ||||||
Site Inspection | 04/20/2015 | In Compliance | PERRY_JF_2 | 0/1 | Non-Compliance | ||||||
Electronic Communication | 03/20/2015 | Satisfied | MOORHEAD_SB_1 | Closure | |||||||
Electronic Communication | 03/20/2015 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Electronic Communication | 03/20/2015 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Letter | 02/26/2015 | Satisfied | RAUENZAHN_RA_1 | Non-Compliance | |||||||
Letter | 02/18/2015 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Site Inspection | 02/15/2015 | Minor Out of Compliance | PERRY_JF_2 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/10/2015 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 03/01/2013 | In Compliance | PERRY_JF_2 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/10/2013 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Letter | 09/30/2011 | Satisfied | CRAFT_TT_1 | Non-Compliance | |||||||
Site Inspection | 09/16/2011 | Minor Out of Compliance | CRAFT_TT_1 | 0/1 | Routine Compliance | ||||||
Record Document | 10/25/2010 | Satisfied | COIL_JM_1 | Non-Compliance | |||||||
Letter | 10/11/2010 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 10/04/2010 | Minor Out of Compliance | CRAFT_TT_1 | 0/1 | Routine Compliance | ||||||
Enforcement Tracking | 06/28/2010 | Closed Without Enforcement | JOHNSON_CJ | Enforcement | |||||||
Discharge Reporting | 06/17/2010 | Satisfied | LEIGH_MM_1 | Discharge | |||||||
Document Management | 01/19/2010 | Complete | LEIGH_MM_1 | Discharge | |||||||
Record Document | 10/21/2009 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 10/14/2009 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 09/30/2009 | Satisfied | CRAFT_TT_1 | Non-Compliance | |||||||
Site Inspection | 09/25/2009 | Minor Out of Compliance | CRAFT_TT_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 03/25/2008 | In Compliance | SHIELDS_DJ | 0/1 | Routine Compliance | ||||||
Site Inspection | 03/04/2008 | In Compliance | STAFFORD_P_1 | 0/1 | Installation | ||||||
Record Document | 11/14/2007 | Satisfied | LEIGH_MM_1 | Discharge | |||||||
Letter | 11/08/2007 | Satisfied | LEIGH_MM_1 | Discharge | |||||||
Record Document | 10/17/2007 | Satisfied | LEIGH_MM_1 | Installation | |||||||
Phone Conversation | 10/16/2007 | Satisfied | STAFFORD_P_1 | Installation | |||||||
Enforcement Referral | 09/28/2007 | Accepted | FRITTS_D | Enforcement | |||||||
Record Document | 09/27/2007 | Satisfied | STAFFORD_P_1 | Installation | |||||||
Record Document | 09/05/2007 | Satisfied | STAFFORD_P_1 | Closure | |||||||
Record Document | 09/05/2007 | Satisfied | STAFFORD_P_1 | Closure | |||||||
Site Inspection | 08/21/2007 | In Compliance | SHIELDS_DJ | 0/4 | Closure | ||||||
Letter | 03/26/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 03/26/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 02/20/2007 | Major Out of Compliance | SHIELDS_DJ | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | LEIGH_MM_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/28/2006 | Satisfied | LEIGH_MM_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/22/2006 | Satisfied | SHIELDS_DJ | Routine Compliance | |||||||
Site Inspection | 08/02/2006 | In Compliance | LEIGH_MM_1 | 0/3 | Non-Compliance | ||||||
Letter | 08/02/2006 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 07/28/2006 | Warning Letter Issued | LEIGH_MM_1 | Non-Compliance | |||||||
Phone Conversation | 07/17/2006 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 07/06/2006 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
08/31/2007 | COMPLETED | 27 | |||||||||