![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Retail Station | ||||||||
County | Volusia | Status | OPEN | ||||||||
ID | 8517647 | Latitude | 28° 54' 38.5417 | ||||||||
Name |
CIRCLE K #2709753 2661 ENTERPRISE RD |
Longitude | 81° 17' 27.6042 | ||||||||
ORANGE CITY, FL 32763 | LL Method | DPHO | |||||||||
Contact | GRAHAM BIGGS | LL Status | REVIEWED | ||||||||
Phone | (919) 774-6700 | Status Date | 10/04/2022 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 12/05/2006 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 697582 - 06/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MACMILLAN OIL 609 N Hepburn Ave Jupiter, FL 33458-5015 |
Effective Date | 03/23/2004 | ||||||||
Contact | GERLAD DONNINI | ||||||||||
Phone | (561) 768-9327 | ||||||||||
COMPLIANCE@SSMINC.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 12/01/1993 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 12/01/1993 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Unleaded Gas (B) | 12/01/1993 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Vehicular Diesel (D) | 12/01/1993 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Vehicular Diesel (D) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Unleaded Gas (B) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2023 | 08/28/2024 | |||||||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2011 | 12/01/2012 | CHUBB | ||||||||
INSURANCE | 12/17/2010 | 12/17/2011 | CHUBB | ||||||||
INSURANCE | 12/17/2009 | 12/17/2010 | CHUBB | ||||||||
INSURANCE | 12/07/2007 | 12/07/2008 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 04/17/2006 | 04/17/2006 | MINOR OUT-OF-COMPLIANCE | MOSER_T | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes CWOE FOR ATG CERTIFICATION. | |||||||||||
CALL | 04/17/2006 | 04/17/2006 | COMPLIANCE ASSURANCE | ||||||||
CWOE | 12/12/2005 | 12/12/2005 | FRITTS_D | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RP PROVIDED CURRENT DECLARATION PAGE FROM ZURICH AMERICAN INSURANCE WITH DATES RANGE FROM 01/01/2005 TO 01/01/2006. CASE WILL NOW BE CWOE. | |||||||||||
LTR | 10/03/2005 | 12/09/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes COPY OF REFERRAL LETTER TO CONTACT @ STORE ADDRESS RETURNED. (WAS ALSO SENT TO HER @ MOTIVA ENTERPRISES IN TX.) | |||||||||||
EPI | 09/23/2005 | 09/27/2005 | FRITTS_D | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ENFORCEMENT STARTED, COMET PROJECT NUMBER IS 292014 | |||||||||||
CRDE | 09/21/2005 | 09/22/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REFERRED FOR NO PROOF OF FR. | |||||||||||
LTR | 08/05/2005 | 08/05/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ELRA LETTER MAILED. NO RESPONSE FROM FACILITY. | |||||||||||
WLI | 07/01/2005 | 07/01/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO RESPONSE FROM FACILITY. | |||||||||||
NCLI | 05/19/2005 | 05/20/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO RESPONSE. | |||||||||||
TCI | 04/14/2005 | 04/14/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | DJ | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes FINAN. RESPONS. NOT AVAILABLE. | |||||||||||
TCI | 04/16/2004 | 04/28/2004 | IN-COMPLIANCE | MOSER_T | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 03/04/2003 | 03/05/2003 | IN-COMPLIANCE | DJ | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 03/27/2002 | 04/01/2002 | IN-COMPLIANCE | SHIELDS_DJ | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 03/08/2001 | 03/13/2001 | IN-COMPLIANCE | LLW | 0/4 | COMPLIANCE ASSURANCE | |||||
TDI | 07/28/2000 | 07/28/2000 | IN-COMPLIANCE | LLW | 0/4 | DISCHARGE PROJECT | |||||
TCI | 04/11/2000 | 04/13/2000 | IN-COMPLIANCE | LLW | 0/4 | COMPLIANCE ASSURANCE | |||||
UTCI | 02/23/1998 | 03/04/1998 | SIGNIFICANT OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 03/07/2025 | Satisfied | HALL_DK | Enforcement | |||||||
Enforcement Referral | 06/11/2024 | Accepted | GREGORY_JW_1 | Enforcement | |||||||
Electronic Communication | 03/29/2024 | Satisfied | BECKER_GT_1 | Incident | |||||||
Electronic Communication | 03/19/2024 | Satisfied | KIDDER_MS_1 | Incident | |||||||
Document Management | 03/19/2024 | Satisfied | KIDDER_MS_1 | Incident | |||||||
Electronic Communication | 03/12/2024 | Satisfied | GREGORY_JW_1 | Compliance Assistance | |||||||
Electronic Communication | 02/15/2024 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 12/04/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 11/29/2023 | Major Out of Compliance | PIERCE_BN_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 11/27/2023 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Letter | 01/23/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 10/11/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 11/30/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 11/29/2021 | Major Out of Compliance | PIERCE_BN_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 11/08/2021 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Document Management | 06/21/2021 | Satisfied | PIERCE_BN_1 | Incident | |||||||
Site Inspection | 02/27/2019 | In Compliance | PERRY_JF_2 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 02/27/2019 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Letter | 02/27/2019 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 12/31/2016 | In Compliance | PERRY_JF_2 | 0/4 | Routine Compliance | ||||||
Site Inspection | 06/01/2015 | In Compliance | COX_CD_1 | 0/4 | Routine Compliance | ||||||
Record Document | 03/03/2015 | Satisfied | MOORHEAD_SB_1 | Routine Compliance | |||||||
Site Inspection | 11/09/2012 | In Compliance | PERRY_JF_2 | 0/4 | Non-Compliance | ||||||
Site Inspection | 10/26/2012 | Minor Out of Compliance | PERRY_JF_2 | 0/4 | Routine Compliance | ||||||
Letter | 10/26/2012 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Emergency Preparedness Information | 10/15/2012 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 08/01/2011 | In Compliance | COIL_JM_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/01/2011 | Satisfied | COIL_JM_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 07/27/2011 | Satisfied | COIL_JM_1 | Routine Compliance | |||||||
Site Inspection | 08/05/2010 | In Compliance | COIL_JM_1 | 0/4 | Routine Compliance | ||||||
Discharge Reporting | 01/19/2010 | Satisfied | LEIGH_MM_1 | Discharge | |||||||
Document Management | 01/19/2010 | Complete | LEIGH_MM_1 | Discharge | |||||||
Emergency Preparedness Information | 03/05/2009 | Satisfied | SHIELDS_DJ | Routine Compliance | |||||||
Site Inspection | 11/24/2008 | In Compliance | JOHNSON_CJ | 0/8 | QA/QC | ||||||
Record Document | 08/07/2008 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 08/07/2008 | In Compliance | LEIGH_MM_1 | 0/8 | Non-Compliance | ||||||
Letter | 07/30/2008 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 07/01/2008 | Major Out of Compliance | STAFFORD_P_1 | 0/4 | Routine Compliance | ||||||
Record Document | 09/20/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 09/05/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 08/24/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 08/24/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 07/26/2007 | Warning Letter Issued | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 07/18/2007 | Major Out of Compliance | LEIGH_MM_1 | 0/8 | Non-Compliance | ||||||
Record Document | 07/06/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 06/20/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 06/13/2007 | Major Out of Compliance | MOSER_T | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | LEIGH_MM_1 | Routine Compliance | |||||||
Record Document | 01/26/2007 | Satisfied | LEIGH_MM_1 | Discharge | |||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | MOSER_T | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/29/2023 | 6052 | SNC-B | 4.6 Overfill that shuts off/restricts flow or triggers alarm not provided. | Please have the flapper valves repaired & retested. Please supply a work order & test results once available. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/06/2006 | COMPLETED | ||||||||||
12/23/1988 | COMPLETED | 61 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||