Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Wakulla | Status | OPEN | ||||||||
ID | 8517831 | Latitude | 30° 13' 57.5581 | ||||||||
Name |
CIRCLE K # 2723908 979 WOODVILLE HWY 363 & 267 |
Longitude | 84° 13' 46.1296 | ||||||||
CRAWFORDVILLE, FL 32327 | LL Method | DPHO | |||||||||
Contact | GRAHAM BIGGS | LL Status | REVIEWED | ||||||||
Phone | (919) 774-6700 | Status Date | 06/18/2003 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 01/06/2016 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 697583 - 06/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | SOUTHWEST GEORGIA OIL CO INC PO BOX 1510 BAINBRIDGE, GA 39818-1510 |
Effective Date | 03/05/2007 | ||||||||
Contact | CHARLES BROCK/MICHAEL TARNOW/GLENNIE BENCH | ||||||||||
Phone | (229) 246-1553 | ||||||||||
CHARLES.BROCK@INLAND-STORES.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 12000 | Unleaded Gas (B) | 02/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
13 | 12000 | Unleaded Gas (B) | 02/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
14 | 12000 | Vehicular Diesel (D) | 02/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Unleaded Gas (B) | 07/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve | (C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Gasohol (C) | 07/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve | (C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 3000 | Vehicular Diesel (D) | 07/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve | (C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 6000 | Vehicular Diesel (D) | 07/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve | (D) External protective coating | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 04/01/1991 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 6000 | Unleaded Gas (B) | 04/01/1991 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 6000 | Unleaded Gas (B) | 04/01/1991 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Vehicular Diesel (D) | 04/01/1991 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 1000 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 2000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 1000 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/28/2024 | 08/26/2025 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2023 | 08/28/2024 | |||||||||
FULLY FUNDED TRUST | 04/24/2022 | 08/21/2023 | |||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2015 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2014 | 11/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2013 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2013 | 11/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2010 | 11/01/2011 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 11/01/2009 | 11/01/2010 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 11/01/2008 | 11/01/2009 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 08/24/2005 | 08/25/2005 | IN-COMPLIANCE | PAUL HUTCHERSON | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/26/2004 | 09/02/2004 | WAYNE ERATO | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED COPIES OF LINE TESTING AND FILL BUCKET REPAIRS | |||||||||||
NCLI | 08/26/2004 | 08/26/2004 | WAYNE ERATO | 0/4 | COMPLIANCE ASSURANCE | ||||||
CWOE | 08/26/2004 | 06/28/2005 | WAYNE ERATO | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/25/2004 | 08/26/2004 | MINOR OUT-OF-COMPLIANCE | WAYNE ERATO | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 05/28/2003 | 06/09/2003 | IN-COMPLIANCE | WAYNE ERATO | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION DONE THIS DATE FACILITY APPEARS TO BE IN COMPLIANCE | |||||||||||
DCNC | 09/20/2002 | 10/01/2002 | WAYNE ERATO | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes SPILL ON AN IMPREVIOUS SURFACE AND CLEANED UP | |||||||||||
DRFR | 09/18/2002 | 10/01/2002 | WAYNE ERATO | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DRF SUBMITTED FOR VEHICLE OVERFILL | |||||||||||
TCI | 03/27/2002 | 03/28/2002 | IN-COMPLIANCE | WAYNE ERATO | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY IN COMPLIANCE | |||||||||||
TCI | 02/27/2001 | 02/27/2001 | IN-COMPLIANCE | WAYNE ERATO | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes IN COMPLIANCE | |||||||||||
TCI | 02/10/2000 | 02/15/2000 | IN-COMPLIANCE | WAYNE ERATO | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY IN COMPLIANCE | |||||||||||
TCI | 12/29/1998 | 03/05/1999 | IN-COMPLIANCE | STOUT_J | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 01/27/2025 | Accepted | FRENCH_EC_1 | Enforcement | |||||||
Electronic Communication | 01/13/2025 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Letter | 10/15/2024 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Site Inspection | 10/15/2024 | Major Out of Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Letter | 10/15/2024 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Site Inspection | 11/16/2022 | In Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Enforcement Tracking | 03/25/2022 | Closed With Enforcement | BRISTOL_S | Enforcement | |||||||
Electronic Communication | 02/08/2022 | Satisfied | FRENCH_EC_1 | Discharge | |||||||
Letter | 02/08/2022 | Satisfied | FRENCH_EC_1 | Discharge | |||||||
Enforcement Referral | 06/29/2021 | Accepted | FRENCH_EC_1 | Enforcement | |||||||
Site Inspection | 10/30/2020 | Minor Out of Compliance | FRENCH_EC_1 | 0/3 | Routine Compliance | ||||||
Letter | 10/30/2020 | Satisfied | HATCHER_JD_1 | Compliance Assistance | |||||||
Site Inspection | 09/13/2018 | In Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 09/15/2016 | In Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 07/12/2016 | In Compliance | FRENCH_EC_1 | 0/3 | Installation | ||||||
Site Inspection | 06/13/2016 | In Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 03/19/2014 | In Compliance | HATCHER_JD_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 03/19/2014 | In Compliance | HATCHER_JD_1 | 0/3 | Installation | ||||||
Letter | 02/24/2014 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Site Inspection | 02/24/2014 | Minor Out of Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/18/2014 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Site Inspection | 09/23/2011 | In Compliance | GRAHAM_DL_1 | 0/3 | Non-Compliance | ||||||
Emergency Preparedness Information | 09/15/2011 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Letter | 09/15/2011 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 09/14/2011 | Minor Out of Compliance | GRAHAM_DL_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 11/04/2010 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 11/04/2010 | In Compliance | GRAHAM_DL_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 11/19/2009 | In Compliance | GRAHAM_DL_1 | 0/3 | Non-Compliance | ||||||
Record Document | 11/17/2009 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 10/14/2009 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 10/14/2009 | Minor Out of Compliance | GRAHAM_DL_1 | 0/3 | Routine Compliance | ||||||
Letter | 10/14/2009 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 10/10/2008 | In Compliance | GRAHAM_DL_1 | 0/3 | Non-Compliance | ||||||
Record Document | 09/24/2008 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 09/17/2008 | Minor Out of Compliance | GRAHAM_DL_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/17/2008 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Letter | 09/17/2008 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
TCAR | 05/08/2008 | Complete | HUTCHERSON_P | Closure | |||||||
Site Inspection | 05/08/2008 | In Compliance | HUTCHERSON_P | 0/4 | Closure | ||||||
Letter | 05/08/2008 | Satisfied | HUTCHERSON_P | Closure | |||||||
Emergency Preparedness Information | 04/16/2008 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Site Inspection | 04/16/2008 | In Compliance | HUTCHERSON_P | 0/3 | Installation | ||||||
Record Document | 01/29/2008 | Satisfied | HUTCHERSON_P | Closure | |||||||
Site Inspection | 07/26/2007 | In Compliance | HUTCHERSON_P | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/26/2007 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Letter | 08/10/2006 | Satisfied | HUTCHERSON_P | Non-Compliance | |||||||
Phone Conversation | 07/31/2006 | Satisfied | HUTCHERSON_P | Non-Compliance | |||||||
Site Inspection | 07/18/2006 | Minor Out of Compliance | HUTCHERSON_P | 0/4 | Routine Compliance | ||||||
Phone Conversation | 07/11/2006 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
02/04/2022 | INACTIVE | GIDDINGS_M | |||||||||
11/06/1990 | INACTIVE | 30 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
12/27/1988 | INACTIVE | 30 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||