![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Walton | Status | OPEN | ||||||||
ID | 8517922 | Latitude | 30° 22' 28.1162 | ||||||||
Name |
CHEVRON FOOD MART-SANTA ROSA 3008 US HWY 98 W |
Longitude | 86° 13' 41.5335 | ||||||||
SANTA ROSA BEACH, FL 32549 | LL Method | DGPS | |||||||||
Contact | PAUL BAISCH | LL Status | REVIEWED | ||||||||
Phone | (850) 774-5172 | Status Date | 11/14/2003 | ||||||||
Account Owner Information | |||||||||||
Name | US 98 3008 CENTER LLC PO BOX 1565 LAWRENCEVILLE, GA 30046 |
Effective Date | 06/10/2011 | ||||||||
Contact | SCOTT A MOON | ||||||||||
Phone | (770) 338-2620 | ||||||||||
PENNY@MAJORSMGMT.COM | |||||||||||
Placard # / Date | 701355 - 09/11/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | US 98 3008 CENTER LLC PO BOX 1565 LAWRENCEVILLE, GA 30046 |
Effective Date | 06/10/2011 | ||||||||
Contact | SCOTT A MOON | ||||||||||
Phone | (770) 338-2620 | ||||||||||
PENNY@MAJORSMGMT.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 8000 | Unleaded Gas (B) | 12/01/1992 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 8000 | Unleaded Gas (B) | 12/01/1992 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 6000 | Vehicular Diesel (D) | 12/01/1992 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Vehicular Diesel (D) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Unleaded Gas (B) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6000 | Unleaded Gas (B) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 6000 | Unleaded Gas (B) | 07/01/1978 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 12/31/2023 | 12/31/2024 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2021 | 12/31/2022 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2020 | 12/31/2021 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2019 | 12/31/2020 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2017 | 12/31/2018 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2016 | 12/31/2017 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2016 | 12/31/2017 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2014 | 12/31/2015 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/15/2012 | 12/31/2013 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 05/24/2011 | 04/15/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 11/01/2010 | 11/01/2011 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 11/11/2009 | 11/11/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/11/2007 | 11/11/2008 | ZURICH-AMERICAN | ||||||||
INSURANCE | 02/19/1991 | 02/19/1998 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/14/2005 | 10/20/2005 | MINOR OUT-OF-COMPLIANCE | J. SCOTT HALE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/13/2004 | 10/18/2004 | IN-COMPLIANCE | J. SCOTT HALE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/17/2003 | 11/24/2003 | IN-COMPLIANCE | J. SCOTT HALE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 09/17/2002 | 09/24/2002 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 04/05/2002 | 04/16/2002 | IN-COMPLIANCE | JOHN B. HOLLINSHEAD | 0/3 | COMPLIANCE ASSURANCE | |||||
IRFR | 04/03/2002 | 04/04/2002 | JOHN B. HOLLINGSHEAD | 0/1 | DISCHARGE PROJECT | ||||||
Completion Notes WATER IN DIESEL TANK | |||||||||||
TCR | 03/28/2002 | 04/04/2002 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 09/18/2001 | 10/13/2001 | MINOR OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 07/18/2000 | 08/09/2000 | IN-COMPLIANCE | HUTCHERSON_VP | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 07/13/1999 | 08/03/1999 | IN-COMPLIANCE | HUTCHERSON_VP | 0/3 | COMPLIANCE ASSURANCE | |||||
UTCR | 12/30/1997 | 01/02/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 08/20/2024 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Letter | 05/15/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Site Inspection | 05/13/2024 | Major Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 04/25/2024 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Enforcement Tracking | 09/12/2022 | Closed Without Enforcement | MAZZOLA_V | Enforcement | |||||||
Letter | 09/12/2022 | Satisfied | TOMAS_M | Enforcement | |||||||
Document Management | 06/13/2022 | Satisfied | WILSON_ML_1 | Discharge | |||||||
TCAR | 06/13/2022 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Discharge Reporting | 06/13/2022 | Satisfied | WILSON_ML_1 | Discharge | |||||||
Site Inspection | 06/13/2022 | Major Out of Compliance | WILSON_ML_1 | 0/3 | Discharge | ||||||
Letter | 06/13/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 06/13/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Enforcement Referral | 12/15/2021 | Accepted | PANGAHAS_RL_1 | Enforcement | |||||||
Record Document | 10/05/2021 | Satisfied | PANGAHAS_RL_1 | Compliance Assistance | |||||||
Electronic Communication | 10/05/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Record Document | 09/23/2021 | Satisfied | PANGAHAS_RL_1 | Compliance Assistance | |||||||
Record Document | 09/14/2021 | Satisfied | PANGAHAS_RL_1 | Compliance Assistance | |||||||
Issue Document | 09/09/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 09/09/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 09/08/2021 | Major Out of Compliance | PANGAHAS_RL_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 02/19/2020 | In Compliance | PANGAHAS_RL_1 | 0/3 | Routine Compliance | ||||||
Issue Document | 02/19/2020 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Letter | 02/19/2020 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Electronic Communication | 02/19/2020 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Enforcement Tracking | 09/14/2018 | Closed Without Enforcement | BRISTOL_S | Enforcement | |||||||
Letter | 08/15/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Document Management | 08/15/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
TCAR | 08/15/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Document Management | 08/08/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Enforcement Referral | 07/23/2018 | Accepted | PANGAHAS_RL_1 | Enforcement | |||||||
Letter | 06/28/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Issue Document | 06/28/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Document Management | 06/13/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Site Inspection | 01/31/2018 | Minor Out of Compliance | PANGAHAS_RL_1 | 0/3 | Compliance Assistance | ||||||
Issue Document | 10/18/2017 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 10/12/2017 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 10/10/2017 | Minor Out of Compliance | PANGAHAS_RL_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 10/05/2017 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Electronic Communication | 10/05/2017 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Phone Conversation | 08/30/2017 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Electronic Communication | 08/30/2017 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 02/08/2017 | In Compliance | BRAZILE_DO_1 | 0/3 | Installation | ||||||
Site Inspection | 12/16/2015 | In Compliance | BRAZILE_DO_1 | 0/3 | Closure | ||||||
Site Inspection | 12/16/2015 | In Compliance | BRAZILE_DO_1 | 0/3 | Installation | ||||||
Site Inspection | 12/14/2015 | In Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 03/17/2014 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Electronic Communication | 01/13/2014 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 12/23/2013 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 12/20/2013 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 12/20/2013 | Minor Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 09/13/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Electronic Communication | 09/09/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Record Document | 09/09/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Electronic Communication | 07/08/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 07/03/2013 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Phone Conversation | 07/02/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Phone Conversation | 07/02/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Electronic Communication | 06/27/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Electronic Communication | 06/27/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Electronic Communication | 06/27/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Electronic Communication | 06/27/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Electronic Communication | 06/27/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Record Document | 05/30/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Record Document | 05/30/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Incident | 05/10/2013 | Has not led to Discharge | KHAN_MR_1 | Incident | |||||||
Record Document | 05/10/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Phone Conversation | 05/06/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Record Document | 09/17/2012 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 09/13/2012 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 09/12/2012 | Minor Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/11/2012 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Record Document | 06/21/2012 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Record Document | 05/29/2012 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Letter | 04/05/2012 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 03/30/2012 | Minor Out of Compliance | BRAZILE_DO_1 | 0/3 | Routine Compliance | ||||||
Record Document | 03/29/2011 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Incident | 03/29/2011 | Has not led to Discharge | TISSINGTON_AB_1 | Incident | |||||||
Letter | 03/29/2011 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 03/22/2011 | Minor Out of Compliance | TISSINGTON_AB_1 | 0/3 | Installation | ||||||
Letter | 03/16/2011 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Record Document | 03/11/2011 | Satisfied | TISSINGTON_AB_1 | Non-Compliance | |||||||
Site Inspection | 03/10/2011 | Minor Out of Compliance | TISSINGTON_AB_1 | 0/3 | Closure | ||||||
Letter | 02/15/2011 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/10/2011 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 02/10/2011 | Minor Out of Compliance | TISSINGTON_AB_1 | 0/3 | Routine Compliance | ||||||
Record Document | 03/22/2010 | Satisfied | TISSINGTON_AB_1 | Non-Compliance | |||||||
Letter | 03/17/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 03/10/2010 | Minor Out of Compliance | TISSINGTON_AB_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/08/2010 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 09/30/2008 | In Compliance | HALE_JS_1 | 0/7 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/19/2008 | Satisfied | HALE_JS_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/07/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 08/30/2007 | In Compliance | HALE_JS_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/22/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | HALE_JS_1 | Routine Compliance | |||||||
Letter | 11/07/2006 | Satisfied | HALE_JS_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/28/2006 | Satisfied | HALE_JS_1 | Routine Compliance | |||||||
Site Inspection | 09/15/2006 | Minor Out of Compliance | HALE_JS_1 | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/13/2024 | 6002 | Minor | 2.1 Operator Training records not available. | Provide copies of ABC, operator training for the cashiers who work at the facility, to this office. | |||||||
05/13/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Empty above-mentioned components, send invoice/pictures for each component when work is completed. | |||||||
05/13/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide current Annual operability testing of release detection systems (inline leak detectors) to this office | |||||||
05/13/2024 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Provide monthly visual inspection log and release detection (VEEDER ROOT) print outs from 09/2021 till now to this office | |||||||
05/13/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide annual interstitial test for tank vacuum to this office | |||||||
05/13/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide the primary overfill protection devices testing to this office. | |||||||
05/13/2024 | 6024 | Minor | 2.2 Integrity test not performed on storage tank, integral piping, single-walled spill containment system, double-walled spill containment system, or doubled-walled sump prior to placing into service. | Provide current/Valid integrity test for Spill buckets, STPs and Dispenser liners to this office | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/20/2022 | COMPLETED | ||||||||||
08/26/1993 | COMPLETED | ||||||||||
07/30/1986 | ACTIVE | 47 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||