![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Local Government | ||||||||
County | Alachua | Status | OPEN | ||||||||
ID | 8518118 | Latitude | 29° 41' 13.8859 | ||||||||
Name |
GAINESVILLE CITY-FLEET MANAGEMENT 405 NW 39TH AVE |
Longitude | 82° 19' 40.72 | ||||||||
GAINESVILLE, FL 32609-1738 | LL Method | DPHO | |||||||||
Contact | JASON GARRETT | LL Status | REVIEWED | ||||||||
Phone | (352) 393-7840 | Status Date | 05/19/2003 | ||||||||
Account Owner Information | |||||||||||
Name | GAINESVILLE CITY - FLEET MGMT 6317 NW 16th St Gainesville, FL 32653-3991 |
Effective Date | 10/17/1996 | ||||||||
Contact | JASON FOSTER / STEVE VARVEL 352-393-8894 | ||||||||||
Phone | (352) 393-8258 | ||||||||||
FOSTERJB@CITYOFGAINESVILLE.ORG | |||||||||||
Placard # / Date | 701803 - 10/03/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | GAINESVILLE CITY - FLEET MGMT 6317 NW 16th St Gainesville, FL 32653-3991 |
Effective Date | 09/18/2018 | ||||||||
Contact | JASON FOSTER / STEVE VARVEL 352-393-8894 | ||||||||||
Phone | (352) 393-8258 | ||||||||||
FOSTERJB@CITYOFGAINESVILLE.ORG | |||||||||||
Property Owner Information | |||||||||||
Name | GAINESVILLE CITY - FLEET MGMT 6317 NW 16th St Gainesville, FL 32653-3991 |
Effective Date | 07/25/2018 | ||||||||
Contact | JASON FOSTER / STEVE VARVEL 352-393-8894 | ||||||||||
Phone | (352) 393-8258 | ||||||||||
FOSTERJB@CITYOFGAINESVILLE.ORG | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 200 | Waste Oil (L) | ABOVEGROUND | In Service (U) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (A) Abv, no soil contact | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 661 | Emerg Generator Diesel (G) | 09/01/2010 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (I) Suction piping system (N) Approved synthetic material |
(1) Continuous electronic sensing (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 30000 | Vehicular Diesel (D) | 06/01/2018 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 30000 | Vehicular Diesel (D) | 07/01/1990 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (O) Tight fill (P) Level gauges/alarms |
(B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 20000 | Unleaded Gas (B) | 07/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 2000 | Kerosene (K) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel |
(C) Fiberglass | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 10/01/2021 | 10/01/2022 | STARR SURPLUS LINES INSURANCE COMPANY | ||||||||
INSURANCE | 10/01/2020 | 10/01/2021 | STEADFAST INSURANCE COMPANY | ||||||||
INSURANCE | 10/01/2019 | 10/01/2020 | STEADFAST INSURANCE COMPANY | ||||||||
INSURANCE | 10/01/2018 | 10/01/2019 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 10/01/2017 | 10/01/2018 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 10/01/2016 | 10/01/2017 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 10/01/2015 | 10/01/2016 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 10/01/2014 | 10/01/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/01/2013 | 10/01/2014 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2012 | 10/01/2013 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2011 | 10/01/2012 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2010 | 10/01/2011 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2009 | 10/01/2010 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2008 | 10/01/2009 | INDIAN HARBOR | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 01/03/2006 | 01/05/2006 | IN-COMPLIANCE | OWENS_JS | 1/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes MLLD & ANNUAL OPERABILITY TEST 12/15/05 | |||||||||||
TCI | 02/10/2005 | 02/10/2005 | IN-COMPLIANCE | OWENS_JS | 1/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes LLD TEST 12/22/04, ANNUAL OPERABILITY TEST 2/10/05 | |||||||||||
RRBD | 01/09/2004 | 01/12/2004 | RAMSEY_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED COPY OF INSURANCE CERTIFICATE | |||||||||||
TCI | 01/05/2004 | 01/08/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | OWENS_JS | 1/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes LLD TEST 12/30/03, ANNUAL OPERABILITY TEST 1/5/04 | |||||||||||
TCR | 04/24/2003 | 04/28/2003 | IN-COMPLIANCE | OWENS_JS | 1/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes OVERFILL PROTECTION AND ANTI-SIPHON VALVE INSTALLED | |||||||||||
TCI | 01/09/2003 | 01/13/2003 | IN-COMPLIANCE | OWENS_JS | 2/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes LLD & OPERABILITY TEST 12/6/02 | |||||||||||
TDI | 08/30/2002 | 11/01/2002 | IN-COMPLIANCE | OWENS_JS | 1/1 | DISCHARGE PROJECT | |||||
Completion Notes DISCHARGE INSPECTION TO INVESTIGATE RECEIPT OF DRF. | |||||||||||
TCI | 01/08/2002 | 01/09/2002 | IN-COMPLIANCE | CHANDLER_R | 1/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION, RELEASE DETECTION TESTED 1/8/02 | |||||||||||
TCI | 01/23/2001 | 01/25/2001 | IN-COMPLIANCE | CHANDLER_R | 1/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION | |||||||||||
TCI | 02/21/2000 | 02/22/2000 | IN-COMPLIANCE | DC | 1/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION | |||||||||||
TCR | 04/15/1999 | 06/02/1999 | MINOR OUT-OF-COMPLIANCE | CHANDLER_D | 1/1 | COMPLIANCE ASSURANCE | |||||
UTCI | 11/11/1998 | 12/18/1998 | SIGNIFICANT OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Completion Notes SUMP TAKE ON H2O,R/D IN ALARM | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 08/01/2023 | Satisfied | MONFORT_V | Enforcement | |||||||
Enforcement Referral | 06/06/2023 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||||||
Letter | 09/13/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 09/13/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 09/13/2022 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 2/0 | Routine Compliance | ||||||
Phone Conversation | 07/11/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 06/09/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 08/12/2020 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Electronic Communication | 08/12/2020 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
TCAR | 08/12/2020 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Document Management | 07/20/2020 | Satisfied | ZIMMERMAN_RA_2 | Closure | |||||||
Site Inspection | 11/16/2019 | Major Out of Compliance | ZIMMERMAN_RA_2 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 11/16/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 11/16/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Phone Conversation | 10/29/2019 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Phone Conversation | 10/29/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Discharge Reporting | 02/08/2019 | Satisfied | ZIMMERMAN_RA_2 | Discharge | |||||||
TCAR | 02/08/2019 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Letter | 02/08/2019 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Letter | 02/08/2019 | Satisfied | RAMSEY_TH_1 | Discharge | |||||||
Electronic Communication | 02/08/2019 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Site Inspection | 12/28/2018 | In Compliance | ZIMMERMAN_RA_2 | 2/1 | Closure | ||||||
Site Inspection | 12/28/2018 | In Compliance | ZIMMERMAN_RA_2 | 2/1 | Installation | ||||||
Record Document | 05/09/2018 | Satisfied | ZIMMERMAN_RA_2 | Discharge | |||||||
Site Inspection | 08/16/2017 | In Compliance | RAMSEY_TH_1 | 2/1 | Routine Compliance | ||||||
Issue Document | 08/16/2017 | Satisfied | RAMSEY_TH_1 | Routine Compliance | |||||||
Electronic Communication | 08/16/2017 | Satisfied | RAMSEY_TH_1 | Routine Compliance | |||||||
Electronic Communication | 07/31/2017 | Satisfied | RAMSEY_TH_1 | Routine Compliance | |||||||
Site Inspection | 01/13/2015 | In Compliance | HARRINGTON_RD_1 | 2/1 | Routine Compliance | ||||||
Electronic Communication | 01/13/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 07/17/2013 | In Compliance | HARRINGTON_RD_1 | 2/1 | Routine Compliance | ||||||
Electronic Communication | 07/17/2013 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 03/26/2012 | In Compliance | OWENS_JS_1 | 2/1 | Routine Compliance | ||||||
Site Inspection | 12/16/2010 | In Compliance | OWENS_JS_1 | 2/1 | Routine Compliance | ||||||
Site Inspection | 11/02/2010 | In Compliance | OWENS_JS_1 | 2/1 | Installation | ||||||
Site Inspection | 01/12/2010 | In Compliance | OWENS_JS_1 | 1/1 | Routine Compliance | ||||||
Site Inspection | 01/26/2009 | In Compliance | OWENS_JS_1 | 1/1 | Routine Compliance | ||||||
Site Inspection | 04/07/2008 | In Compliance | OWENS_JS_1 | 1/1 | Non-Compliance | ||||||
Site Inspection | 02/28/2008 | Major Out of Compliance | DOHANEY_T | 1/1 | QA/QC | ||||||
Letter | 02/28/2008 | Satisfied | DOHANEY_T | Non-Compliance | |||||||
Site Inspection | 02/20/2008 | Major Out of Compliance | OWENS_JS_1 | 1/1 | Routine Compliance | ||||||
Letter | 02/20/2008 | Satisfied | OWENS_JS_1 | Non-Compliance | |||||||
Record Document | 02/18/2008 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Site Inspection | 12/19/2006 | In Compliance | OWENS_JS_1 | 1/1 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/16/2019 | 5102 | Minor | 3.3 Shop fabricated storage tank system release detection devices not tested annually. | Have tank 7 Krueger gauge interstitial monitoring device operability tested and certified; email passing test certification to ACEPD. | |||||||
11/16/2019 | 4057 | Minor | 4.31 Overfill protection devices not registered or tested annually. | Have tank 7 primary overfill protection device tested and certified; email passing test certification to ACEPD. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/30/2018 | COMPLETED | KARKI_S | |||||||||
08/29/2002 | COMPLETED | 45 | |||||||||
02/25/1998 | COMPLETED | ||||||||||
07/19/1990 | COMPLETED | ||||||||||