![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Alachua | Status | OPEN | ||||||||
ID | 8518122 | Latitude | 29° 39' 36.2895 | ||||||||
Name |
CHEVRON-NEWBERRY RD 7500 NEWBERRY RD |
Longitude | 82° 25' 19.2294 | ||||||||
GAINESVILLE, FL 32605 | LL Method | DPHO | |||||||||
Contact | WENDA LEWIS | LL Status | REVIEWED | ||||||||
Phone | (352) 376-3293 | Status Date | 04/04/2003 | ||||||||
Account Owner Information | |||||||||||
Name | LEWIS OIL CO INC PO BOX 141286 GAINESVILLE, FL 32614 |
Effective Date | 06/27/1994 | ||||||||
Contact | WENDA LEWIS (MGR) | ||||||||||
Phone | (352) 376-3293 | ||||||||||
WLEWIS@LEWISOILCO.COM | |||||||||||
Placard # / Date | 701585 - 10/02/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | LEWIS OIL CO INC PO BOX 141286 GAINESVILLE, FL 32614 |
Effective Date | 10/18/2012 | ||||||||
Contact | WENDA LEWIS (MGR) | ||||||||||
Phone | (352) 376-3293 | ||||||||||
WLEWIS@LEWISOILCO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 06/01/1982 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 06/01/1982 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Unleaded Gas (B) | 01/01/1982 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Vehicular Diesel (D) | 07/01/1984 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 1000 | Waste Oil (L) | 01/01/1982 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (C) Fiberglass | (I) Not required | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/14/2022 | 05/14/2024 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2021 | 05/14/2022 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2020 | 05/14/2021 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2019 | 05/14/2020 | ACE | ||||||||
INSURANCE | 05/14/2018 | 05/14/2019 | ACE | ||||||||
INSURANCE | 05/14/2017 | 05/14/2018 | ACE | ||||||||
INSURANCE | 05/14/2016 | 05/14/2017 | ACE AMER INS CO | ||||||||
INSURANCE | 01/31/2015 | 01/31/2016 | AIG | ||||||||
INSURANCE | 01/31/2014 | 01/31/2015 | AIG | ||||||||
INSURANCE | 01/31/2013 | 01/31/2014 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/31/2012 | 01/31/2013 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/31/2011 | 01/31/2012 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/31/2010 | 01/31/2011 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/01/2009 | 01/01/2010 | AIG | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 09/26/2005 | 09/28/2005 | RAMSEY_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED TANK TIGHTNESS TEST RESULTS, ALL PASSED ON 9/20/05 | |||||||||||
TCI | 08/18/2005 | 08/19/2005 | MINOR OUT-OF-COMPLIANCE | OWENS_JS | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes MLLD TEST 4/18/05, ANNUAL OPERABILITY TEST 8/18/05 | |||||||||||
TCR | 03/23/2005 | 03/25/2005 | IN-COMPLIANCE | OWENS_JS | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes PROPER OVERFILL INSTALLED | |||||||||||
TCI | 01/19/2005 | 01/24/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | OWENS_JS | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes LLD TEST 4/4/04, ANNAUL OPERABILITY TEST 1/19/05 | |||||||||||
TCI | 11/13/2003 | 11/14/2003 | IN-COMPLIANCE | OWENS_JS | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes LLD TEST 4/28/03, ANNUAL OPERABILITY TEST 11/13/03 | |||||||||||
TCI | 01/03/2003 | 01/06/2003 | IN-COMPLIANCE | OWENS_JS | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes LLD TEST 4/23/02, OPERABILITY TEST 1/3/03 | |||||||||||
TCI | 08/21/2001 | 08/22/2001 | IN-COMPLIANCE | CHANDLER_R | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION | |||||||||||
TCI | 08/30/2000 | 08/31/2000 | IN-COMPLIANCE | DC | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION | |||||||||||
PDNE | 11/08/1999 | 11/08/1999 | BUONO_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 09/09/1999 | 09/13/1999 | MINOR OUT-OF-COMPLIANCE | CHANDLER_D | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 07/27/1999 | 08/11/1999 | MINOR OUT-OF-COMPLIANCE | CHANDLER_D | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 02/08/1999 | 03/05/1999 | MINOR OUT-OF-COMPLIANCE | CHANDLER_D | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 05/30/2024 | Satisfied | JACKSON_SM | Enforcement | |||||||
Enforcement Referral | 02/05/2024 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 02/05/2024 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 12/03/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 12/03/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Record Document | 11/24/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/12/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/12/2023 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 11/05/2023 | Major Out of Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Letter | 02/01/2023 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Record Document | 01/31/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Record Document | 09/27/2021 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Site Inspection | 08/30/2021 | Major Out of Compliance | KEIM_MJ_1 | 0/4 | Routine Compliance | ||||||
Letter | 08/30/2021 | Satisfied | KEIM_MJ_1 | Non-Compliance | |||||||
Electronic Communication | 08/30/2021 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Electronic Communication | 08/30/2021 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Record Document | 08/29/2021 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Phone Conversation | 05/25/2019 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Electronic Communication | 05/25/2019 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Site Inspection | 05/25/2019 | Minor Out of Compliance | KEIM_MJ_1 | 0/4 | Routine Compliance | ||||||
Letter | 05/25/2019 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Site Inspection | 01/11/2017 | In Compliance | ZIMMERMAN_RA_2 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 01/11/2017 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Phone Conversation | 01/09/2017 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Electronic Communication | 11/17/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 11/17/2015 | Satisfied | HARRINGTON_RD_1 | Complaint | |||||||
Electronic Communication | 11/17/2015 | Satisfied | HARRINGTON_RD_1 | Complaint | |||||||
Site Inspection | 11/17/2015 | In Compliance | HARRINGTON_RD_1 | 0/4 | Complaint | ||||||
Electronic Communication | 09/02/2015 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 09/01/2015 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 04/19/2015 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Letter | 04/19/2015 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 04/19/2015 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 04/16/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 10/17/2012 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/17/2012 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 10/17/2012 | In Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 04/29/2011 | In Compliance | OWENS_JS_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 06/21/2010 | In Compliance | OWENS_JS_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 06/21/2010 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Site Inspection | 05/15/2009 | In Compliance | OWENS_JS_1 | 0/4 | Routine Compliance | ||||||
Letter | 05/05/2009 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
TCAR | 05/05/2009 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Site Inspection | 03/30/2009 | In Compliance | OWENS_JS_1 | 0/4 | Closure | ||||||
Emergency Preparedness Information | 03/30/2009 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Site Inspection | 03/30/2009 | In Compliance | OWENS_JS_1 | 0/4 | Installation | ||||||
Site Inspection | 03/04/2008 | In Compliance | OWENS_JS_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/04/2008 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/22/2007 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/08/2007 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Site Inspection | 11/21/2006 | In Compliance | OWENS_JS_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/20/2006 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/05/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Address the 87 tank interstice alarm issue. The liquid should be removed from the 87 tank interstice and the interstice should be closely monitored until incident investigation and repairs are made. If the issue cannot be resolved within 90 days, the tank must be placed Out of Service. Provide verification of completion. | |||||||
11/05/2023 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | File Incident Notification Form in regards to the 87 tank interstice alarm. Provide Incident Investigation Results within 14 days. | |||||||
11/05/2023 | 6066 | Minor | 4.4 Not repaired per applicable standards. | Address the corrosion that is present in the 87 and 93 STP sumps. Provide verification of completion. | |||||||
11/05/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide current sensor and line leak detector function test results. | |||||||
11/05/2023 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide current overfill prevention device function test results. | |||||||
11/05/2023 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove liquid from the components listed above. Provide verification of completion and status of the Plus DW spill bucket gauge. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
10/22/1991 | COMPLETED | 10 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||