![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | South | Type | Retail Station | ||||||||
County | Collier | Status | OPEN | ||||||||
ID | 8518131 | Latitude | 26° 9' 16.7147 | ||||||||
Name |
SOUTHERN PETRO HOLDINGS 8900 DAVIS BLVD |
Longitude | 81° 41' 14.1764 | ||||||||
NAPLES, FL 34112 | LL Method | DPHO | |||||||||
Contact | Paola Serrano | LL Status | REVIEWED | ||||||||
Phone | (941) 769-5519 | Status Date | 04/22/2003 | ||||||||
Account Owner Information | |||||||||||
Name | SOUTHERN PETRO HOLDINGS LLC 1909 W ATLANTIC AVE Delray Beach, FL 33444 |
Effective Date | 05/23/2023 | ||||||||
Contact | PAOLA | ||||||||||
Phone | (954) 227-5948 | ||||||||||
PAOLA@UNITEDPETROMANAGEMENT.COM | |||||||||||
Placard # / Date | 678256 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | SOUTHERN PETRO HOLDINGS LLC 1909 W ATLANTIC AVE Delray Beach, FL 33444 |
Effective Date | 05/23/2023 | ||||||||
Contact | PAOLA | ||||||||||
Phone | (954) 227-5948 | ||||||||||
PAOLA@UNITEDPETROMANAGEMENT.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 03/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 03/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (F) Fiberglass clad steel (I) Double wall (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Unleaded Gas (B) | 03/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Vehicular Diesel (D) | 01/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 01/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 01/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 1000 | Other Non Regulated (Z) | 07/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass |
(C) Fiberglass | (8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 04/08/2017 | 04/08/2018 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/08/2016 | 04/08/2017 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/08/2015 | 04/08/2016 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/08/2013 | 04/08/2014 | AMERICAN SAFETY | ||||||||
INSURANCE | 04/08/2012 | 04/08/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 04/08/2011 | 04/08/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/27/2010 | 09/27/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/27/2009 | 09/27/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/27/2008 | 09/27/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 01/10/2006 | 01/30/2006 | MINOR OUT-OF-COMPLIANCE | OWEN_JA | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes VIOLATION # 1103, 1105, 1117. PERFORM HYDROSTATIC ON SPILL BUCKETS. SENSORS & MLLD'S NEED ANNUAL OPERABILITY TEST | |||||||||||
TCI | 02/11/2005 | 02/17/2005 | MINOR OUT-OF-COMPLIANCE | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes #1117: ANNUAL TESTS | |||||||||||
CWOE | 04/13/2004 | 04/15/2004 | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes VERIFIED SHEAR VALVES ANCHORED & HOSES ARE IN NEW CONDITION ==>CLOSED #144 & PCW REMOVED FROM SPILL CONTAINMENT ==>CLOSED #155 | |||||||||||
TCI | 04/13/2004 | 04/15/2004 | IN-COMPLIANCE | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: DW FIBERGLASS | |||||||||||
RRBD | 09/09/2003 | 09/11/2003 | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TANK TIGHTNESS REQ'D EVERY 3 YRS...REC'D TANK TIGHTNESS RESULTS | |||||||||||
NCLI | 04/16/2003 | 04/21/2003 | HOGAN_S | /0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TCI DATED 4/8/03 | |||||||||||
TCI | 04/08/2003 | 04/09/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | HOGAN_S | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes RE-ANCHOR SHEAR VALVES. WORN DISPENSER HOSES. REMOVE DEBRIS FROM SPILL BUCKETS. REMOVE DIESEL FROM DISPENSER LINER #9. TANK TIGHTNESS IN CONJUCNTION WITH ATG PAST DUE, DUE 12/2001. DW RIGID FIBERGLASS PIPING (AMERON). | |||||||||||
TCI | 05/08/2002 | 05/08/2002 | IN-COMPLIANCE | HOGAN_S | /3 | COMPLIANCE ASSURANCE | |||||
Completion Notes IN COMPLIANCE. | |||||||||||
RRBD | 07/31/2001 | 07/31/2001 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LLD PASSED ANNUAL TEST | |||||||||||
CWOE | 07/31/2001 | 07/31/2001 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CLOSE 157/N | |||||||||||
TCI | 05/08/2001 | 05/08/2001 | MINOR OUT-OF-COMPLIANCE | HOGAN_S | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes NEED LLD TESTS | |||||||||||
TCI | 09/07/1999 | 09/07/1999 | IN-COMPLIANCE | SILLERY_W | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 11/20/2024 | Accepted | BATES_TD_1 | Enforcement | |||||||
Site Inspection | 09/19/2023 | Major Out of Compliance | STANDIFORD_JA | 0/3 | Routine Compliance | ||||||
Electronic Communication | 12/10/2021 | Satisfied | HERNANDEZ_N_5 | Routine Compliance | |||||||
Site Inspection | 12/10/2021 | Major Out of Compliance | HERNANDEZ_N_5 | 0/3 | Routine Compliance | ||||||
Letter | 12/10/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 10/27/2020 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Meeting | 10/27/2020 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Site Inspection | 12/18/2019 | Major Out of Compliance | BATES_TD_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 12/18/2019 | Satisfied | BATES_TD_1 | Routine Compliance | |||||||
Letter | 12/18/2019 | Satisfied | BATES_TD_1 | Compliance Assistance | |||||||
Letter | 09/06/2019 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Enforcement Tracking | 08/08/2019 | Closed Without Enforcement | HERNANDEZ_N | Enforcement | |||||||
Enforcement Referral | 01/24/2018 | Accepted | STANDIFORD_JA_2 | Enforcement | |||||||
Enforcement Referral | 01/22/2018 | Rejected | STANDIFORD_JA_2 | Enforcement | |||||||
Record Document | 01/16/2018 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||||||
Letter | 08/29/2017 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||||||
Site Inspection | 08/25/2017 | Major Out of Compliance | STANDIFORD_JA_2 | 0/3 | Routine Compliance | ||||||
Site Inspection | 05/31/2016 | In Compliance | STANDIFORD_JA_2 | 0/3 | Installation | ||||||
Letter | 10/22/2015 | Satisfied | STANDIFORD_JA_2 | Non-Compliance | |||||||
Site Inspection | 10/21/2015 | Major Out of Compliance | STANDIFORD_JA_2 | 0/3 | Routine Compliance | ||||||
Site Inspection | 08/27/2014 | Major Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Non-Compliance | ||||||
Letter | 08/27/2014 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Record Document | 02/18/2014 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Letter | 02/12/2014 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 02/12/2014 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/23/2013 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Discharge Reporting | 01/04/2013 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||||||
Site Inspection | 01/04/2013 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Discharge | ||||||
Document Management | 01/04/2013 | Complete | SNYDERBURN_PJ_2 | Discharge | |||||||
Emergency Preparedness Information | 08/26/2012 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Site Inspection | 04/13/2012 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Non-Compliance | ||||||
Letter | 02/02/2012 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 02/02/2012 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Incident | 02/07/2011 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||||||
Emergency Preparedness Information | 01/24/2011 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Site Inspection | 01/24/2011 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Letter | 01/24/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Document Management | 01/14/2011 | Complete | SNYDERBURN_PJ_2 | Incident | |||||||
Incident | 07/09/2010 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||||||
Document Management | 04/12/2010 | Complete | SNYDERBURN_PJ_2 | Incident | |||||||
TCAR | 03/29/2010 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||||||
Letter | 03/29/2010 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||||||
Site Inspection | 03/29/2010 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Closure | ||||||
Emergency Preparedness Information | 03/24/2010 | Satisfied | SNYDERBURN_PJ_2 | Installation | |||||||
Site Inspection | 03/24/2010 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Installation | ||||||
Record Document | 03/13/2009 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Site Inspection | 01/16/2009 | Minor Out of Compliance | NOVAK_KM_1 | 0/4 | Routine Compliance | ||||||
Letter | 01/16/2009 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 01/16/2009 | Satisfied | NOVAK_KM_1 | Routine Compliance | |||||||
Record Document | 02/04/2008 | Satisfied | POTTS_CR | Non-Compliance | |||||||
Letter | 12/26/2007 | Satisfied | POTTS_CR | Non-Compliance | |||||||
Site Inspection | 10/19/2007 | Minor Out of Compliance | POTTS_CR | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/19/2007 | Satisfied | POTTS_CR | Routine Compliance | |||||||
Letter | 10/19/2007 | Satisfied | POTTS_CR | Non-Compliance | |||||||
Record Document | 04/16/2007 | Satisfied | POTTS_CR | Non-Compliance | |||||||
Letter | 03/27/2007 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 03/20/2007 | Major Out of Compliance | POTTS_CR | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/05/2007 | Satisfied | POTTS_CR | Routine Compliance | |||||||
Emergency Preparedness Information | 09/26/2006 | Satisfied | POTTS_CR | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
09/18/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Please schedule 3 year integrity testing of UDC's and STP sumps as required by rule. Once completed, please submit the completed test record. | |||||||
09/13/2023 | 6006 | Minor | 2.5 Placard not displayed (or available upon request). | Please post the current placard in a visible location as required by rule. The current registration fees have been paid. | |||||||
09/12/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Conduct an integrity test of UDC 5/6 as soon as possible. If the integrity test fails an Incident Notification Form must be submitted. Please then continue with an investigation to determine if surrounding soil around UDC 5/6 has been impacted. If it is determined that a discharge occurred, then sampling will need to occur and an associated assessment report will need to be submitted. If the integrity test passes, sampling will not be required. Please ensure the associated boot is repaired/replaced. Please notify of associated TXI/TIN activity 30 days in advance,10 days in advance, and then 48 hours in advance. | |||||||
12/10/2021 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide system test from 2020 to the current one, or perform system test (OPV-flapper) and send copy by email to the County inspector. | |||||||
12/10/2021 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide system test from 2020 to the current one or perform system test (line leak detector, spill bucket gauges, and Veeder Root and sensors) and send copy by email to the County inspector. | |||||||
12/10/2021 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | At least once a month, but not exceeding 35 days, every component of a storage tank system that contains, transfers, or stores, or is designed to contain, transfer, or store regulated substances that can be inspected visually shall be visually inspected and documented as to its condition pursuant to Rule 62-761.710, F.A.C. For three consecutive months (December, January, and February) perform the MVI and send copy to the County inspector by email. | |||||||
12/10/2021 | 6001 | Minor | 2.1 No reasonable access provided. | The facility owner or operator shall provide an authorized facility representative to unlock and open any covers, manways, and release detection equipment associated with the storage tank system or system component at time of the inspection. Violation shall be resolve with the issuance of the CAO Letter. | |||||||
12/10/2021 | 6074 | Minor | 2.8 Improper maintenance of records. Records requiring to be maintained for 3 years or for the life of the system not kept by facility. Records not provided within 5 business days. | Records shall be kept for three years. Violation shall be resolved with the issuance of the CAO Letter. | |||||||
12/16/2019 | 4068 | Minor | 4.3 Storage tank system has a not repaired component which has or could cause a release or discharge. | Submit an Incident Notification Form. Remove liquids. Investigate as an Incident. Provide the county with a passing integrity test and an explanation of repairs. If the secondary bucket was affected, sampling may be required. Replace the gauge or alternatively, document visual interstitial checks monthly. | |||||||
12/16/2019 | 4049 | Minor | 4.24 Dispensers not installed and maintained according to reference guidelines. | Replace damaged or aged hoses or whips #2, #4, and #6. Replace missing shear valve anchor bolts in #4 and #8 | |||||||
12/13/2019 | 4014 | SNC-B | 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. | Send proof of FR to the county. The proof should include FDEP Form Part P, the Certification of Financial Responsibility | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/27/1988 | COMPLETED | 26 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||