![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||
District | South | Type | Retail Station | ||||
County | Collier | Status | OPEN | ||||
ID | 8518163 | Latitude | 26° 5' 16.966 | ||||
Name |
BP-LELY 11200 TAMIAMI TRL E |
Longitude | 81° 43' 51.8241 | ||||
NAPLES, FL 34113 | LL Method | DPHO | |||||
Contact | STEVEN LAUPERT | LL Status | REVIEWED | ||||
Phone | (239) 775-7114 | Status Date | 09/21/2023 | ||||
Account Owner Information | |||||||
Name | USAL INC 11200 TAMIAMI TRL E NAPLES, FL 34113 |
Effective Date | 08/11/1992 | ||||
Contact | LUCILLE LAUPERT | ||||||
Phone | (239) 775-7114 | ||||||
STEVELAUPERT@GMAIL.COM | |||||||
Placard # / Date | 381799 - 02/20/2012 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 10000 | Unleaded Gas (B) | 11/01/1984 | UNDERGROUND | Out of Service (T) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (8) Manually sampled wells (B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 10000 | Unleaded Gas (B) | 11/01/1984 | UNDERGROUND | Out of Service (T) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (8) Manually sampled wells (B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
3 | 10000 | Unleaded Gas (B) | 11/01/1984 | UNDERGROUND | Out of Service (T) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (8) Manually sampled wells (B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
4 | 10000 | Vehicular Diesel (D) | 11/01/1984 | UNDERGROUND | Out of Service (T) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (8) Manually sampled wells (B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
5 | 500 | Waste Oil (L) | 11/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (O) Tight fill |
(B) Steel/galvanized metal | (M) Manual tank gauging - USTs | |||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
NONE | |||||||
INSURANCE | 09/12/2008 | 09/12/2009 | ZURICH-AMERICAN | ||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
RRBD | 09/16/2005 | 09/20/2005 | SNYDERBURN_P | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes THE ANNUAL CP SURVEY PASSED AND WAS SUBMITTED. DATED 9/16/05. | |||||||
RRBD | 08/01/2005 | 09/07/2005 | SNYDERBURN_P | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes TANKNOLOGY REPORT CONTAINS LINE AND TANK TIGHTNESS TESTS ALONG WITH MLLD TEST. ALL PASSED | |||||||
TCI | 06/30/2005 | 09/07/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | SNYDERBURN_P | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes FACILITY HAS SEVERAL VIOLATIONS: INSURANCE, SPILL BUCKETS ALL DAMAGED, DISPENSER LINERS ALL FILLED WITH WATER, RELAEASE DETECTION NOT BEING DONE MONTHLY, IMPRESSED CURRENT SYSTEM NOT BEING INSPECTED/MAINTAINED, ANNUAL MLLD NOT DONE, TIGHTNESS ON LINES... | |||||||
RRBD | 02/03/2004 | 02/03/2004 | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | ||
Completion Notes REC'D RDRL LOGS | |||||||
CWOE | 02/03/2004 | 02/03/2004 | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | ||
Completion Notes CLOSED #86 | |||||||
RRBD | 11/07/2003 | 11/13/2003 | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | ||
Completion Notes REC'D LINE TIGHTNESS, MLLD, CP RESULTS | |||||||
DSNR | 11/07/2003 | 11/13/2003 | KOLANDA | 0/4 | DISCHARGE PROJECT | ||
Completion Notes PIPING REPLACED ...TIGHTNESS TEST PASSED | |||||||
NCLI | 09/29/2003 | 09/30/2003 | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | ||
Completion Notes #110, #151, #157, #86 | |||||||
TCI | 09/23/2003 | 09/23/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes SW STEEL PIPING WITH CATHODIC PROTECTION | |||||||
NCLI | 02/03/2003 | 02/04/2003 | KOLANDA | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes CLOSE VIOLATION #9 | |||||||
IRFR | 01/27/2003 | 01/27/2003 | KOLANDA | 0/4 | DISCHARGE PROJECT | ||
Completion Notes HELPED FACILITY COMPLETE THE INF | |||||||
TCPI | 01/27/2003 | 01/27/2003 | MINOR OUT-OF-COMPLIANCE | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes RESPONSE TO E-MAIL COMPLAINT: 1. NO INF FILED; 2. DID NOT USE CERTIFIED CONTRACTOR TO REPAIR INTEGRAL PIPING; 3. PROOF OF PASSED TIGHTNESS TEST | |||||||
RRBD | 08/16/2002 | 08/16/2002 | KOLANDA | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes REC'D ANNUAL TESTING FOR LLD & LINE TIGHTNESS & TANK TIGHTNESS | |||||||
NCLI | 07/23/2002 | 07/23/2002 | KOLANDA | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes NEEDS: ANNUAL LINE TIGHTNESS, ANNUAL OPERABILITY FOR MLLD, & CP CHECK-UP 6 MONTHS AFTER INSTALLATION | |||||||
TCI | 07/12/2002 | 07/12/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes NEED PROOF OF ANNUAL LINE TIGHTNESS, ANNUAL OPERABILITY FOR MECH. LLD, & 6 MONTH CHECK-UP AFTER CP INSTALLATION..CLOSED #152 | |||||||
RRBD | 12/21/2001 | 12/28/2001 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes RRBD TANKNOLOGY CP REPORT. CP IS OPERATING ON THE TANKS AND PIPING. FACILITY HAD REPAIRS AND WILL NEED CP EVALUATED IN 6 MONTHS. CLOSED VIOLATION 151/N. | |||||||
NCLI | 09/20/2001 | 09/25/2001 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes NCLI FOR CP PROTECTION NEEDING REPAIRS | |||||||
TCI | 09/19/2001 | 09/19/2001 | MINOR OUT-OF-COMPLIANCE | HOGAN_S | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes OVERFILL PROTECTION WAS INSTALLED EQ-223. RD IS BEING PERFORMED AND A LOG WAS AVAILABLE. STP'S HAVE CP PROTECTION. DISPENSER LINERS AND SPILL BUCKETS ARE DRY. CP PROTECTION IS OPERATING EXCEPT AT DISPESNER END OF PIPING. AMPMETER NEEDS REPLACED. | |||||||
RRBD | 04/11/2001 | 05/07/2001 | HOGAN_S | 0/4 | COMPLIANCE ASSURANCE | ||
Completion Notes TANK, LINE AND LLD TESTS | |||||||
TCI | 04/11/2001 | 04/11/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | HOGAN_S | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes CP TEST, RD DEVICE TEST, LINE TIGHTNESS TEST, NEEDS OVERFILL | |||||||
TCI | 12/16/1999 | 12/17/1999 | IN-COMPLIANCE | SILLERY_W | 0/4 | COMPLIANCE ASSURANCE | |
TCI | 02/19/1999 | 03/18/1999 | IN-COMPLIANCE | RAMSEY_T | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes COMPLIANCE INSPECTION | |||||||
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Electronic Communication | 04/22/2025 | Satisfied | CERQUERA_L | Enforcement | |||
Site Inspection | 02/03/2025 | Major Out of Compliance | STANDIFORD_JA | 0/4 | Closure | ||
Site Inspection | 08/16/2024 | Major Out of Compliance | STANDIFORD_JA | 0/4 | Routine Compliance | ||
Phone Conversation | 08/14/2024 | Satisfied | STANDIFORD_JA | Routine Compliance | |||
Letter | 11/30/2021 | Satisfied | HERNANDEZ_N_5 | Non-Compliance | |||
Site Inspection | 11/29/2021 | Major Out of Compliance | HERNANDEZ_N_5 | 0/4 | Routine Compliance | ||
Electronic Communication | 11/23/2021 | Satisfied | HERNANDEZ_N_5 | Routine Compliance | |||
Letter | 10/31/2019 | Satisfied | JENSEN_NJ_1 | Compliance Assistance | |||
Site Inspection | 10/31/2019 | Major Out of Compliance | JENSEN_NJ_1 | 0/4 | Routine Compliance | ||
Enforcement Referral | 02/14/2018 | Accepted | SNYDERBURN_PJ_2 | Enforcement | |||
Electronic Communication | 02/14/2018 | Satisfied | HERNANDEZ_N | Enforcement | |||
Enforcement Referral | 02/08/2018 | Accepted | SNYDERBURN_PJ_2 | Enforcement | |||
Letter | 03/16/2017 | Satisfied | STANDIFORD_JA_2 | Non-Compliance | |||
Site Inspection | 02/28/2017 | Minor Out of Compliance | STANDIFORD_JA_2 | 0/4 | Routine Compliance | ||
Enforcement Tracking | 05/19/2016 | Closed With Enforcement | HERNANDEZ_N | Enforcement | |||
Issue Document | 05/17/2016 | Satisfied | HERNANDEZ_N | Enforcement | |||
Issue Document | 04/15/2016 | Satisfied | HERNANDEZ_N | Enforcement | |||
Letter | 06/26/2015 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Site Inspection | 06/25/2015 | Minor Out of Compliance | BATES_TD_1 | 0/4 | Routine Compliance | ||
Letter | 06/19/2013 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Site Inspection | 06/19/2013 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/4 | Routine Compliance | ||
Electronic Communication | 04/18/2013 | Satisfied | CERQUERA_L | Enforcement | |||
Issue Document | 09/24/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Electronic Communication | 09/24/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Electronic Communication | 09/24/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Record Document | 09/19/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Phone Conversation | 09/14/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Phone Conversation | 09/04/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Electronic Communication | 09/04/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Phone Conversation | 09/04/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Phone Conversation | 08/29/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Electronic Communication | 08/29/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Emergency Preparedness Information | 08/10/2012 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Phone Conversation | 06/08/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Record Document | 06/08/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Electronic Communication | 06/04/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Issue Document | 06/01/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Electronic Communication | 05/31/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Issue Document | 05/30/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Phone Conversation | 05/30/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Electronic Communication | 05/30/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Phone Conversation | 05/30/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Electronic Communication | 05/30/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Record Document | 05/30/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Phone Conversation | 05/22/2012 | Satisfied | CERQUERA_L | Enforcement | |||
Enforcement Referral | 01/30/2012 | Accepted | FOXWORTH_S | Enforcement | |||
Site Inspection | 01/27/2012 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/4 | Routine Compliance | ||
Site Inspection | 06/30/2011 | In Compliance | SNYDERBURN_PJ_2 | 0/4 | Routine Compliance | ||
Document Management | 01/14/2010 | Complete | SNYDERBURN_PJ_2 | Discharge | |||
Discharge Reporting | 01/14/2010 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||
Site Inspection | 01/11/2010 | In Compliance | SNYDERBURN_PJ_2 | 0/4 | Routine Compliance | ||
Site Inspection | 06/18/2009 | In Compliance | NOVAK_KM_1 | 0/4 | Routine Compliance | ||
Emergency Preparedness Information | 06/10/2009 | Satisfied | NOVAK_KM_1 | Routine Compliance | |||
Record Document | 04/16/2009 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 06/30/2008 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 02/12/2008 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||
Site Inspection | 11/27/2007 | In Compliance | SNYDERBURN_PJ_2 | 0/4 | Routine Compliance | ||
Emergency Preparedness Information | 11/27/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 08/22/2007 | Satisfied | SNYDERBURN_PJ_2 | Installation | |||
Site Inspection | 08/08/2007 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/1 | Installation | ||
Record Document | 08/08/2007 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Letter | 08/08/2007 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Emergency Preparedness Information | 02/07/2007 | Satisfied | POTTS_CR | Routine Compliance | |||
Meeting | 11/27/2006 | Satisfied | OWEN_JA | Enforcement | |||
Letter | 11/27/2006 | Satisfied | OWEN_JA | Non-Compliance | |||
Site Inspection | 11/27/2006 | Major Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Installation | ||
Letter | 11/27/2006 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Meeting | 11/02/2006 | Satisfied | OWEN_JA | Non-Compliance | |||
Meeting | 09/28/2006 | Satisfied | OWEN_JA | Non-Compliance | |||
Emergency Preparedness Information | 09/28/2006 | Satisfied | OWEN_JA | Routine Compliance | |||
Site Inspection | 07/10/2006 | Major Out of Compliance | OWEN_JA | 0/4 | Routine Compliance | ||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
08/15/2024 | 6030 | SNC-B | 4.2 Any component(s) of storage tank system not installed according to reference standards. | Close the system (either close UST's in place or have UST's removed). | |||
08/13/2024 | 6077 | Minor | 4.8 Out of service storage tank systems not tested annually for operability or interstice and liquid level not monitored annually. | Facility owners and operators of out-of-service storage tank systems shall monitor the liquid level in the storage tank annually but not to exceed 12 months, unless the tank system contains no regulated substances. Records of these inspections shall be maintained in accordance with subsection 62-761.710(2), F.A.C. In the event that liquid in excess of one inch, or 0.3 percent by weight, in the storage tank is discovered, facility owners and operators must have the liquid removed and maintain associated disposal manifests for Inspector review. Close the System (either close UST's in place or have the UST's removed). | |||
08/13/2024 | 6069 | Minor | 4.5 Cathodic protection not operated and maintained to provide continuous protection. System not inspected 6 months after installation or repair. Cathodic protection system not inspected in accordance with NACE International Standards. Impressed current system not inspected every 2 months. | Cathodic protection systems shall be operated and maintained to provide continuous corrosion protection to the metal components of those portions of the storage tank and integral piping in contact with the soil. Storage tank systems equipped with cathodic protection must be inspected, tested, and evaluated by or under the direction of a Corrosion Professional within six months of installation or repair and at least every year, or every three years for factory-installed (galvanic) cathodic protection systems. Close the System (either close UST's in place or have the UST's removed). | |||
11/24/2021 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Facility is out of service since 20210; however, financial responsibility shall be maintained and demonstrated to the county or Department for all storage tank systems until the storage tank systems are properly closed pursuant to subsections 62-761.800(2). | |||
11/23/2021 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Water in excess of one inch in depth, or any regulated substance collected in secondary containment, spill containment systems, or in piping sumps and dispenser sumps shall be removed within 72 hours of discovery and be either reused or properly disposed. Removed the water and send photos or manifest by email to the County inspector. | |||
11/23/2021 | 6005 | Minor | 2.4 Registration fees not paid (not receiving fuel). | Storage tank registration fees are due to the Department each year by July 1. Ensure that your contact information is up-to-date with the Department in order to receive updates concerning your annual registration fees. Once fees are paid, you must print a copy of your placard from the Department's ESSA Online Business Portal. In general, you are not legally allowed to receive motor fuel without a valid placard on display at your facility. | |||
10/30/2019 | 4086 | SNC-B | 5.5 Storage tank systems not closed as required. | Close tank and provide proof of closure procedures to inspector. | |||
01/27/2012 | 1128 | Minor | 5.252 System out-of-service longer than required time limit. | Remove / abandon the tanks in place or upgrade the tank systems to secondary containment. | |||
Discharge Information | |||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||
11/13/2006 | ACTIVE | 7 | Sellers, Robert | 8134705761 | |||
08/31/1993 | COMPLETED | 10 | |||||