Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||
District | South | Type | Retail Station | ||||
County | Collier | Status | OPEN | ||||
ID | 8518194 | Latitude | 26° 24' 46.6156 | ||||
Name |
CIRCLE K #7424 1117 E MAIN ST |
Longitude | 81° 24' 10.158 | ||||
IMMOKALEE, FL 34142-3835 | LL Method | DPHO | |||||
Contact | GRAHAM BIGGS | LL Status | REVIEWED | ||||
Phone | (919) 774-6700 | Status Date | 04/22/2003 | ||||
Account Owner Information | |||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 05/20/1994 | ||||
Contact | IRA LEWIS | ||||||
Phone | (423) 400-2480 | ||||||
ILEWIS@CIRCLEK.COM | |||||||
Placard # / Date | 697588 - 06/28/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 11908 | Unleaded Gas (B) | 12/01/1983 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 11908 | Unleaded Gas (B) | 12/01/1983 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
3 | 10152 | Vehicular Diesel (D) | 12/01/1983 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
4 | 9728 | Unleaded Gas (B) | 12/01/1986 | UNDERGROUND | Closed In Place (A) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system |
(H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
GUARANTEE | 04/25/2021 | 08/27/2022 | |||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2015 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2014 | 12/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2011 | 12/01/2012 | CHUBB | ||||
INSURANCE | 12/01/2011 | 12/01/2013 | CHUBB | ||||
INSURANCE | 12/18/2010 | 12/17/2011 | CHUBB | ||||
INSURANCE | 12/18/2009 | 12/17/2010 | CHUBB | ||||
INSURANCE | 12/17/2008 | 12/17/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
TCI | 04/26/2005 | 04/29/2005 | IN-COMPLIANCE | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes #1112-ANNUAL CP SURVEY DUE | |||||||
LTR | 04/23/2004 | 04/26/2004 | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | ||
Completion Notes COVER LETTER FOR TXI & TIN SPILL CONTAINMENT | |||||||
RRBD | 04/22/2004 | 04/23/2004 | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | ||
Completion Notes CP SURVEY PASSED | |||||||
NCLI | 04/12/2004 | 04/26/2004 | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | ||
Completion Notes PCW REMOVED | |||||||
CWOE | 04/12/2004 | 04/26/2004 | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | ||
Completion Notes CLOSED #155 | |||||||
CCLR | 04/08/2004 | 04/22/2004 | SNYDERBURN_P | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes LIMITED CLOSURES SUMMARY REPORT FOR SPILL BUCKET REPLACEMENT. THE FACILITY IS EDI ELIGIBLE. NO COMMENTS SENT, ONLY FILED. | |||||||
TXI | 03/18/2004 | 03/29/2004 | IN-COMPLIANCE | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes REMOVED DAMAGED SPILL BUCKETS | |||||||
TIN | 03/18/2004 | 03/29/2004 | MINOR OUT-OF-COMPLIANCE | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes INSTALLED EMCO-WHEATON SPILL CONTAINMENT BUCKET EQ-524 | |||||||
NCLI | 03/01/2004 | 03/02/2004 | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | ||
Completion Notes #155 & #144 | |||||||
TCI | 02/23/2004 | 02/27/2004 | MINOR OUT-OF-COMPLIANCE | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes PIPING: SW FIBERGLASS | |||||||
DSNR | 02/18/2004 | 03/01/2004 | KOLANDA | 0/3 | DISCHARGE PROJECT | ||
Completion Notes TANK TIGHTNESS PASSED | |||||||
IRFR | 01/21/2004 | 03/01/2004 | KOLANDA | 0/3 | DISCHARGE PROJECT | ||
Completion Notes 2 CONSECUTIVE MONTHS OF 'INCONCLUSIVE' SIR DATA | |||||||
CWOE | 03/06/2003 | 06/12/2003 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||
RRBD | 03/06/2003 | 06/12/2003 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes FUEL AND FILTER WAS REMOVED FROM DISPENSER LINERS | |||||||
NCLI | 02/11/2003 | 02/26/2003 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes NCLI FOR TCI DATED 2/10/03 | |||||||
TCI | 02/10/2003 | 02/24/2003 | MINOR OUT-OF-COMPLIANCE | HOGAN_S | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes REMOVE DIESEL FROM DISPENSER LINERS. POOR HOUSEKEEPING AT THIS FACILITY. CONTAMINATED SOILS RESULTING FROM DIESEL DISPENSER ISLANDS. FACILITY MUST SUBMIT DRF AND REMOVE SOILS. | |||||||
RRBD | 04/02/2002 | 04/19/2002 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes TEST RSULTS FOR LLD AND LINE TIGHTNESS. CLOSE 157/N | |||||||
NCLI | 03/28/2002 | 04/01/2002 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes NCLI FOR TCI DATED 3/25/02 | |||||||
TCI | 03/25/2002 | 03/26/2002 | MINOR OUT-OF-COMPLIANCE | HOGAN_S | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes CRACKED HOSE ON DIESEL DISPENSER #7. FUEL IN DISPENSER LINER #8. DIESEL LINE AND LLD OPEREABILITY TEST IS PAST DUE. | |||||||
LTR | 12/04/2001 | 12/11/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes LTR TO FDEP REQUESTING THE DELETION OF THE 2/1/96 DISCHARGE | |||||||
DSNR | 09/21/2001 | 09/26/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes WORK ORDER LOG HISTORY FROM TOSCO STATES THE BLENDING VALVES WERE REPLACED BY J&M PUMP AND PROBLEM APPEARS TO BE FIXED. | |||||||
DSNR | 09/21/2001 | 09/26/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes WORK ORDER LOG HISTORY FROM TOSCO STATES BLENDING VALVES WERE REPLACED BY J&M PUMP AND THE PROBLEM IS FIXED. | |||||||
IRFR | 09/20/2001 | 09/26/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes FAILED SIR FOR AUG2001. BLENDING VALVES WERE REPLACED AND PROBLEM APPEARS TO FIXED. | |||||||
IRFR | 08/21/2001 | 08/22/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes INF FOR INCONCLUSIVE SIR ON UNLEADED AND PREMIUM | |||||||
DSNR | 08/04/2001 | 08/14/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes PASSED TANK TIGHTNESS ON REGULAR ADN PREMIUM | |||||||
DSNR | 08/04/2001 | 08/14/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes PASSED TANK TIGTNESS ON REGULAR AND PREMIUM | |||||||
IRFR | 07/20/2001 | 07/23/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes 2 CONSECUTIVE INCONLUSIVES ON PREMIUM AND REGULAR | |||||||
IRFR | 06/21/2001 | 06/26/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes TWO INCONCLUSIVES IN A ROW ON PREMIUM AND REGULAR | |||||||
DSNR | 06/06/2001 | 06/07/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes TANK TESTS RESULT: REGULAR PASSED 4/3/01 AND PREMIUM PASSED 5/16/01. CLOSE INF. | |||||||
DSNR | 06/06/2001 | 06/07/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes PREMIUM PASSED TANK TEST | |||||||
RRBD | 06/06/2001 | 06/07/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes TEST RESULTS TO CLOSE INF DATED 3/20/01 4/20/01 AND 5/21/01 | |||||||
DSNR | 06/06/2001 | 06/07/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes TANK TESTS: REGULAR PASSED 4/3/01 AND PREMIUM PASSED 5/16/01 | |||||||
IRFR | 05/21/2001 | 05/21/2001 | HOGAN_S | 0/2 | DISCHARGE PROJECT | ||
Completion Notes TANK TEST ON UNLEADED AND PREMIUM DUE TO SIR RESULTS | |||||||
LTR | 05/07/2001 | 05/08/2001 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes COVER LETTER | |||||||
TCI | 05/03/2001 | 05/04/2001 | IN-COMPLIANCE | HOGAN_S | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes IN COMPLIANCE | |||||||
IRFR | 04/20/2001 | 04/20/2001 | HOGAN_S | 0/3 | DISCHARGE PROJECT | ||
Completion Notes FAILED SIR ON UNLEADED, 2 INCONCLUSIVES IN A ROW ON PREMIUM | |||||||
DSNR | 03/28/2001 | 03/30/2001 | HOGAN_S | 0/2 | DISCHARGE PROJECT | ||
Completion Notes TANK RESULTS CLEAR INF | |||||||
RRBD | 03/28/2001 | 03/30/2001 | HOGAN_S | 0/2 | DISCHARGE PROJECT | ||
Completion Notes PASSED TANK RESULTS | |||||||
RRBD | 03/20/2001 | 03/21/2001 | HOGAN_S | 0/2 | DISCHARGE PROJECT | ||
Completion Notes INF FOR 2 CONSECUTIVE INCONCLUSIVES ON SIR | |||||||
IRFR | 03/20/2001 | 03/21/2001 | HOGAN_S | 0/2 | DISCHARGE PROJECT | ||
Completion Notes INF FOR 2 CONSECUTIVE INCONCLUSIVES ON SIR | |||||||
IRFR | 02/20/2001 | 02/22/2001 | HOGAN_S | 0/0 | DISCHARGE PROJECT | ||
Completion Notes TANK TEST IS SCHEDULED | |||||||
RRBD | 02/05/2001 | 02/06/2001 | HOGAN_S | 0/1 | DISCHARGE PROJECT | ||
Completion Notes TANK TEST-PASSED | |||||||
DSNR | 02/05/2001 | 02/06/2001 | HOGAN_S | 0/1 | DISCHARGE PROJECT | ||
Completion Notes TANK TEST RESULTS-PASS | |||||||
IRFR | 01/18/2001 | 01/22/2001 | HOGAN_S | 0/1 | DISCHARGE PROJECT | ||
Completion Notes FAILED SIR ON GASOLINE TANK | |||||||
RRBD | 01/10/2001 | 01/10/2001 | HOGAN_S | 0/3 | COMPLIANCE ASSURANCE | ||
Completion Notes LEAK DETECTOR RESULTS PASSED | |||||||
DSNR | 01/10/2001 | 01/10/2001 | HOGAN_S | 0/1 | DISCHARGE PROJECT | ||
Completion Notes IRFR RESOLVED BY TANK TIGHTNESS TEST | |||||||
RRBD | 01/10/2001 | 01/10/2001 | HOGAN_S | 0/1 | DISCHARGE PROJECT | ||
Completion Notes PASSED TANK TEST TO RESOLVE INF. ANNUAL LEAK DETECTOR TEST. | |||||||
IRFR | 10/20/2000 | 12/01/2000 | HOGAN_S | 1/3 | DISCHARGE PROJECT | ||
Completion Notes FAILED SIR. TANK TEST SCHEDULED. | |||||||
IRFR | 07/20/2000 | 07/24/2000 | SNYDERBURN_P | 0/0 | DISCHARGE PROJECT | ||
Completion Notes FAILED SIRS. TIGHTNESS TEST SCHEDULED. | |||||||
TCR | 01/20/2000 | 01/24/2000 | IN-COMPLIANCE | SILLERY_W | 0/3 | COMPLIANCE ASSURANCE | |
TCI | 10/20/1999 | 10/29/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | SILLERY_W | 0/3 | COMPLIANCE ASSURANCE | |
UTCI | 11/20/1998 | 11/25/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||
Completion Notes ROUTINE INSPECTION | |||||||
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Enforcement Referral | 11/20/2024 | Rejected | HERNANDEZ_N_5 | Enforcement | |||
Document Management | 03/11/2024 | Satisfied | STANDIFORD_JA | Incident | |||
Enforcement Referral | 02/29/2024 | Accepted | STANDIFORD_JA | Enforcement | |||
Electronic Communication | 12/04/2023 | Satisfied | STANDIFORD_JA | Routine Compliance | |||
Electronic Communication | 12/04/2023 | Satisfied | STANDIFORD_JA | Compliance Assistance | |||
Letter | 08/04/2023 | Satisfied | STANDIFORD_JA | Compliance Assistance | |||
Site Inspection | 08/02/2023 | Major Out of Compliance | STANDIFORD_JA | 0/3 | Routine Compliance | ||
Letter | 05/26/2022 | Satisfied | HERNANDEZ_N_5 | Closure | |||
TCAR | 05/26/2022 | Satisfied | HERNANDEZ_N_5 | Component Closure | |||
Incident | 05/26/2022 | Has not led to Discharge | HERNANDEZ_N_5 | Incident | |||
Site Inspection | 05/23/2022 | In Compliance | HERNANDEZ_N_5 | 0/3 | Component Installation | ||
Letter | 05/23/2022 | Satisfied | HERNANDEZ_N_5 | Component Installation | |||
Electronic Communication | 05/20/2022 | Satisfied | HERNANDEZ_N_5 | Component Installation | |||
Electronic Communication | 05/11/2022 | Satisfied | HERNANDEZ_N_5 | Component Installation | |||
Electronic Communication | 05/11/2022 | Satisfied | HERNANDEZ_N_5 | Component Installation | |||
Electronic Communication | 03/25/2022 | Satisfied | HERNANDEZ_N_5 | Incident | |||
Electronic Communication | 03/21/2022 | Satisfied | HERNANDEZ_N_5 | Incident | |||
Document Management | 12/16/2021 | Satisfied | HERNANDEZ_N_5 | Incident | |||
Electronic Communication | 10/13/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||
Electronic Communication | 09/14/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||
Site Inspection | 08/09/2021 | Major Out of Compliance | HERNANDEZ_N_5 | 0/3 | Routine Compliance | ||
Letter | 08/09/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||
Electronic Communication | 08/09/2021 | Satisfied | HERNANDEZ_N_5 | Routine Compliance | |||
Electronic Communication | 02/06/2020 | Satisfied | BATES_TD_1 | Routine Compliance | |||
Letter | 01/31/2020 | Satisfied | BATES_TD_1 | Compliance Assistance | |||
Incident | 01/24/2020 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||
Document Management | 12/20/2019 | Satisfied | BATES_TD_1 | Incident | |||
Letter | 11/04/2019 | Satisfied | BATES_TD_1 | Compliance Assistance | |||
Site Inspection | 11/04/2019 | Minor Out of Compliance | BATES_TD_1 | 0/3 | Routine Compliance | ||
Incident | 10/29/2019 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||
Document Management | 10/29/2019 | Satisfied | BATES_TD_1 | Incident | |||
Incident | 06/06/2018 | Has not led to Discharge | STANDIFORD_JA_2 | Incident | |||
Record Document | 01/02/2018 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||
Letter | 08/30/2017 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||
Site Inspection | 08/28/2017 | Minor Out of Compliance | STANDIFORD_JA_2 | 0/3 | Routine Compliance | ||
Document Management | 08/09/2017 | Satisfied | STANDIFORD_JA_2 | Incident | |||
Letter | 06/01/2016 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||
TCAR | 06/01/2016 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||
Incident | 11/09/2015 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||
Document Management | 11/09/2015 | Complete | SNYDERBURN_PJ_2 | Incident | |||
Site Inspection | 11/09/2015 | In Compliance | SNYDERBURN_PJ_2 | 0/1 | Closure | ||
Site Inspection | 11/09/2015 | In Compliance | SNYDERBURN_PJ_2 | 0/1 | Installation | ||
Site Inspection | 10/26/2015 | In Compliance | STANDIFORD_JA_2 | 0/3 | Routine Compliance | ||
Discharge Reporting | 01/18/2015 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||
Site Inspection | 01/17/2015 | In Compliance | SNYDERBURN_PJ_2 | 0/1 | Discharge | ||
Incident | 09/18/2014 | Led to Discharge (Incident promoted) | SNYDERBURN_PJ_2 | Incident | |||
Document Management | 09/18/2014 | Complete | SNYDERBURN_PJ_2 | Incident | |||
Site Inspection | 04/19/2014 | In Compliance | SPARKS_JD_1 | 0/3 | Installation | ||
Site Inspection | 04/19/2014 | In Compliance | SPARKS_JD_1 | 0/3 | Closure | ||
Discharge Reporting | 04/14/2014 | Satisfied | SPARKS_JD_1 | Discharge | |||
TCAR | 04/14/2014 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||
Letter | 04/14/2014 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||
Document Management | 04/14/2014 | Complete | SNYDERBURN_PJ_2 | Closure | |||
Letter | 02/18/2014 | Satisfied | SPARKS_JD_1 | Non-Compliance | |||
Site Inspection | 02/11/2014 | Minor Out of Compliance | SPARKS_JD_1 | 0/3 | Routine Compliance | ||
Letter | 02/10/2014 | Satisfied | SPARKS_JD_1 | Non-Compliance | |||
Site Inspection | 02/09/2014 | Minor Out of Compliance | SPARKS_JD_1 | 0/3 | Discharge | ||
Incident | 01/22/2014 | Led to Discharge (Incident promoted) | SPARKS_JD_1 | Incident | |||
Emergency Preparedness Information | 09/19/2013 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Site Inspection | 09/04/2013 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Non-Compliance | ||
Site Inspection | 08/29/2013 | Major Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Installation | ||
Letter | 08/29/2013 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Letter | 02/20/2013 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Record Document | 12/17/2012 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Letter | 12/13/2012 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Site Inspection | 12/13/2012 | Major Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Non-Compliance | ||
Emergency Preparedness Information | 08/26/2012 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 08/03/2012 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Letter | 08/03/2012 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Site Inspection | 08/02/2012 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||
Record Document | 06/07/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Letter | 04/11/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Site Inspection | 04/11/2011 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||
Emergency Preparedness Information | 03/12/2011 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Incident | 11/29/2010 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||
Document Management | 11/29/2010 | Complete | SNYDERBURN_PJ_2 | Incident | |||
Document Management | 11/29/2010 | Complete | SNYDERBURN_PJ_2 | Incident | |||
Incident | 10/06/2010 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||
Document Management | 09/27/2010 | Complete | SNYDERBURN_PJ_2 | Incident | |||
Incident | 09/14/2010 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||
Document Management | 09/13/2010 | Complete | SNYDERBURN_PJ_2 | Incident | |||
Record Document | 07/12/2010 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||
Document Management | 07/06/2010 | Complete | SNYDERBURN_PJ_2 | Incident | |||
Incident | 07/06/2010 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||
Document Management | 06/28/2010 | Complete | SNYDERBURN_PJ_2 | Incident | |||
Record Document | 05/28/2010 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||
Incident | 05/28/2010 | Has not led to Discharge | NOVAK_KM_1 | Incident | |||
Document Management | 05/28/2010 | Complete | NOVAK_KM_1 | Incident | |||
Document Management | 05/21/2010 | Complete | NOVAK_KM_1 | Non-Compliance | |||
Record Document | 05/21/2010 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||
Document Management | 05/14/2010 | Complete | POTTS_CR | Discharge | |||
Discharge Reporting | 05/14/2010 | Satisfied | POTTS_CR | Discharge | |||
Site Inspection | 04/08/2010 | Minor Out of Compliance | NOVAK_KM_1 | 0/3 | Routine Compliance | ||
Emergency Preparedness Information | 04/08/2010 | Satisfied | NOVAK_KM_1 | Routine Compliance | |||
Letter | 04/08/2010 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||
Document Management | 03/30/2010 | Complete | NOVAK_KM_1 | Non-Compliance | |||
Record Document | 06/08/2009 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||
Record Document | 05/12/2009 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||
Letter | 05/05/2009 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||
Emergency Preparedness Information | 05/05/2009 | Satisfied | NOVAK_KM_1 | Routine Compliance | |||
Site Inspection | 05/05/2009 | Minor Out of Compliance | NOVAK_KM_1 | 0/3 | Routine Compliance | ||
Record Document | 11/13/2008 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 09/17/2008 | Satisfied | WILSON_KM | Routine Compliance | |||
Record Document | 07/21/2008 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Site Inspection | 05/19/2008 | Minor Out of Compliance | POTTS_CR | 0/3 | Routine Compliance | ||
Letter | 05/19/2008 | Satisfied | POTTS_CR | Non-Compliance | |||
Record Document | 04/11/2008 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Emergency Preparedness Information | 04/04/2008 | Satisfied | POTTS_CR | Routine Compliance | |||
Record Document | 12/11/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 11/06/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 10/17/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 10/17/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 09/11/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 08/28/2007 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Record Document | 08/07/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 07/20/2007 | Satisfied | POTTS_CR | Routine Compliance | |||
Issue Document | 06/11/2007 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||
Record Document | 03/07/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 02/21/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Site Inspection | 02/14/2007 | In Compliance | POTTS_CR | 0/3 | Discharge | ||
Phone Conversation | 02/14/2007 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||
Emergency Preparedness Information | 02/06/2007 | Satisfied | POTTS_CR | Routine Compliance | |||
Site Inspection | 12/08/2006 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Installation | ||
Emergency Preparedness Information | 09/25/2006 | Satisfied | OWEN_JA | Routine Compliance | |||
Record Document | 07/17/2006 | Satisfied | OWEN_JA | Non-Compliance | |||
Site Inspection | 03/31/2006 | Minor Out of Compliance | OWEN_JA | 0/4 | Routine Compliance | ||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
08/01/2023 | 7075 | SNC-B | 3.1 Not repaired component or piping which has not caused a discharge or release. | Within 90 days of the inspection date, please ensure all noted corrosion has been corrected and DSLH #6 has been replaced. Please provide photos via email to the inspector documenting the corrective actions have occurred within the same time frame. | |||
Discharge Information | |||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||
02/06/2007 | COMPLETED | ||||||
12/01/1988 | COMPLETED | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||