![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Federal Government | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8518667 | Latitude | 30° 10' 43.2347 | ||||||||
Name |
NAVAL SUPPORT ACTIVITY PANAMA CITY 101 VERNON AVE |
Longitude | 85° 45' 16.785 | ||||||||
PANAMA CITY BEACH, FL 32407-7018 | LL Method | DPHO | |||||||||
Contact | CHARLOTTE A COPE | LL Status | REVIEWED | ||||||||
Phone | (850) 235-5888 | Status Date | 10/13/2003 | ||||||||
Account Owner Information | |||||||||||
Name | US NAVY - NAVAL SUPPORT ACTIVITY PC 101 VERNON AVE Panama City Beach, FL 32407 |
Effective Date | 08/30/1999 | ||||||||
Contact | PUBLIC WORKS ENVIRONMENTAL | ||||||||||
Phone | (850) 235-5888 | ||||||||||
CHARLOTTE.A.COPE.CIV@US.NAVY.MIL | |||||||||||
Placard # / Date | 698183 - 07/01/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | US NAVY - NAVAL SUPPORT ACTIVITY PC 101 VERNON AVE Panama City Beach, FL 32407 |
Effective Date | 06/20/1985 | ||||||||
Contact | PUBLIC WORKS ENVIRONMENTAL | ||||||||||
Phone | (850) 235-5888 | ||||||||||
CHARLOTTE.A.COPE.CIV@US.NAVY.MIL | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
172R1 | 2000 | Unleaded Gas (B) | 08/01/1997 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
278AR1 | 15000 | Vehicular Diesel (D) | 02/01/1989 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(A) Abv, no soil contact (C) Fiberglass (D) External protective coating (I) Suction piping system (J) Pressurized piping system |
(2) Visual inspect pipe sumps (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
278BR1 | 15000 | Vehicular Diesel (D) | 02/01/1989 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(A) Abv, no soil contact (C) Fiberglass (D) External protective coating (I) Suction piping system (J) Pressurized piping system |
(2) Visual inspect pipe sumps (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
327CR1 | 2000 | Unleaded Gas (B) | 05/28/2019 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (X) Concrete |
(A) Abv, no soil contact (B) Steel/galvanized metal (F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
350GT | 722 | Emerg Generator Diesel (G) | 08/18/2015 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(D) SPCC Plan (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
544GT | 8000 | Emerg Generator Diesel (G) | 10/01/2023 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
551-N | 30000 | Jet Fuel (F) | 11/01/2002 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(1) Continuous electronic sensing (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
551-S | 30000 | Jet Fuel (F) | 11/01/2002 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(1) Continuous electronic sensing (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
577 | 2000 | Vehicular Diesel (D) | 01/01/2005 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
591ER1 | 6000 | Used Oil (J) | 12/15/2016 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (G) Pipe trench liner (J) Pressurized piping system |
(6) External piping monitoring (D) SPCC Plan (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
591WR1 | 6000 | Used Oil (J) | 12/15/2016 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (G) Pipe trench liner (J) Pressurized piping system |
(6) External piping monitoring (D) SPCC Plan (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
600 | 8000 | Waste Oil (L) | 10/01/2011 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
654D | 20000 | Vehicular Diesel (D) | 04/11/2016 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (C) Fiberglass (D) External protective coating (F) Double wall (I) Suction piping system |
(3) Electronic monitor pipe sumps (D) SPCC Plan (F) Monitor dbl wall tank space (G) Electronic line leak detector (Q) Visual inspection of ASTs (R) Monitor tank bottom space (S) Statistical Inventory Reconcile (V) Suction pump check valve |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
654M | 12000 | Unleaded Gas (B) | 04/11/2016 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (C) Fiberglass (D) External protective coating (F) Double wall (I) Suction piping system |
(3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (G) Electronic line leak detector (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G300R1 | 1000 | Emerg Generator Diesel (G) | 06/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (P) Level gauges/alarms (X) Concrete |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G470 | 806 | Emerg Generator Diesel (G) | 04/23/2024 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (I) Suction piping system (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G608 | 660 | Emerg Generator Diesel (G) | 01/01/2010 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (I) Suction piping system |
(D) SPCC Plan (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 11200 | Vehicular Diesel (D) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
13 | 11200 | Unleaded Gas (B) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
172 | 2000 | Unleaded Gas (B) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off |
(D) External protective coating (I) Suction piping system |
(D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
241 | 6000 | Unleaded Gas (B) | 07/01/1958 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
242 | 6000 | Leaded Gas (A) | 07/01/1958 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
243 | 6000 | Unleaded Gas (B) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (C) Fiberglass | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
278A | 7500 | Vehicular Diesel (D) | 07/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (C) Fiberglass | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
278B | 7500 | Vehicular Diesel (D) | 07/01/1964 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
278C | 7500 | Vehicular Diesel (D) | 07/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (C) Fiberglass | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
278D | 7500 | Vehicular Diesel (D) | 07/01/1964 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
300A | 2500 | Emerg Generator Diesel (G) | 07/01/1972 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
307 | 5000 | Vehicular Diesel (D) | 07/01/1964 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
307R1 | 6000 | Vehicular Diesel (D) | 02/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (K) Dispenser liners |
(F) Monitor dbl wall tank space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
318B | 300 | Waste Oil (L) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
324 | 300 | Waste Oil (L) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
325A | 20000 | Jet Fuel (F) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket |
(D) External protective coating | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
325B | 20000 | Jet Fuel (F) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket |
(D) External protective coating | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
325C | 20000 | Jet Fuel (F) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket |
(D) External protective coating | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
327 | 2500 | Unleaded Gas (B) | 07/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (C) Fiberglass | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
327A | 1000 | Unleaded Gas (B) | 08/01/1991 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (M) Manual tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
327C | 2000 | Unleaded Gas (B) | 06/01/1998 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
333 | 550 | Waste Oil (L) | 07/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
362A | 12000 | Vehicular Diesel (D) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
362B | 12000 | Vehicular Diesel (D) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
362C | 12000 | Vehicular Diesel (D) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
362D | 12000 | Unleaded Gas (B) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
362E | 2000 | Vehicular Diesel (D) | 05/01/1999 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
363 | 6000 | Waste Oil (L) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
439 | 4900 | Waste Oil (L) | 07/01/1988 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(Q) Visual inspection of ASTs | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
439R1 | 5000 | Waste Oil (L) | 01/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
462E | 6000 | Waste Oil (L) | 08/01/1996 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (D) External protective coating (G) Pipe trench liner (J) Pressurized piping system |
(D) SPCC Plan (Q) Visual inspection of ASTs (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
462W | 6000 | Waste Oil (L) | 08/01/1996 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (D) External protective coating (G) Pipe trench liner (J) Pressurized piping system |
(D) SPCC Plan (Q) Visual inspection of ASTs (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
591-E | 6000 | Waste Oil (L) | 03/01/2006 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (D) External protective coating (G) Pipe trench liner (J) Pressurized piping system |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
591-W | 6000 | Waste Oil (L) | 03/01/2006 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (D) External protective coating (G) Pipe trench liner (J) Pressurized piping system |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G110A | 500 | Emerg Generator Diesel (G) | 07/01/1957 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G110AB | 500 | Emerg Generator Diesel (G) | 07/01/1982 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G129 | 550 | Emerg Generator Diesel (G) | 07/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off |
(B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G300-A | 2500 | Emerg Generator Diesel (G) | 06/01/1972 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off |
(D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G322 | 1175 | Emerg Generator Diesel (G) | 07/01/1975 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off |
(B) Steel/galvanized metal | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G326 | 560 | Emerg Generator Diesel (G) | 07/01/1976 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (R) Double wall - tank jacket |
(B) Steel/galvanized metal | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G9-A | 10000 | Emerg Generator Diesel (G) | 07/01/1973 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (R) Double wall - tank jacket |
(D) External protective coating | (D) SPCC Plan (I) Not required |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
240 | 600 | Waste Oil (L) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G101 | 150 | Emerg Generator Diesel (G) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
G9 | 1200 | Emerg Generator Diesel (G) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | |||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 09/18/2018 | 09/18/2038 | |||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 03/29/2009 | 03/29/2010 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 12/21/2005 | 01/06/2006 | IN-COMPLIANCE | BRAZILE | 7/6 | COMPLIANCE ASSURANCE | |||||
TCI | 07/20/2005 | 07/21/2005 | IN-COMPLIANCE | BRAZILE | 9/6 | COMPLIANCE ASSURANCE | |||||
Completion Notes POST HURRICANE DENNIS INSPECTION, NO DAMAGE AT THE TIME OF THE INSPECTION | |||||||||||
TXI | 02/08/2005 | 02/14/2005 | IN-COMPLIANCE | PINKOVSKY | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLOSURE OF TANK 362E AND PIPING | |||||||||||
DPRI | 02/08/2005 | 02/14/2005 | IN-COMPLIANCE | PINKOVSKY | 0/0 | TERMINAL FACILITY PROJECT | |||||
Completion Notes DPRC #099950 | |||||||||||
TCI | 02/08/2005 | 02/14/2005 | IN-COMPLIANCE | PINKOVSKY | 9/6 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL AND DW AMERON FIBERGLASS, DPRC #099950 | |||||||||||
TXI | 12/16/2004 | 12/17/2004 | IN-COMPLIANCE | PINKOVSKY | 2/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL AND DW AMERON; CLOSURE OF TANKS 462 E & W | |||||||||||
TIN | 09/30/2004 | 09/30/2004 | IN-COMPLIANCE | PINKOVSKY | 6/9 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL AND DW AMERON FIBERGLASS; VEEDER ROOT TLS350 PLUS ATG INSTALLATIONS AT 362, 278, 551, 172 AREAS | |||||||||||
TCI | 09/24/2004 | 09/28/2004 | IN-COMPLIANCE | PINKOVSKY | 9/6 | COMPLIANCE ASSURANCE | |||||
Completion Notes POST HURRICANE IVAN INSPECTION | |||||||||||
DSNR | 08/11/2004 | 08/16/2004 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes VISUAL CHECKS AND OVA READINGS INDICATE NO FUEL LEAKS. POSSIBLY FAULTY ELECTRICAL CONNECTOR. | |||||||||||
IRFR | 08/05/2004 | 08/05/2004 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INF FOR PERMALERT SENSOR CABLE ALARM IN DW PIPING. | |||||||||||
TCR | 06/14/2004 | 06/15/2004 | IN-COMPLIANCE | PINKOVSKY | 9/6 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL & AMERON DW | |||||||||||
TIN | 06/14/2004 | 06/15/2004 | IN-COMPLIANCE | PINKOVSKY | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL, NEW TANK 439R1 | |||||||||||
RRBD | 03/24/2004 | 03/25/2004 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/23/2004 | 03/25/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | PINKOVSKY | 9/6 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL & DW AMERON FIBERGLASS; DPRI, CERTIFICATE #099936 | |||||||||||
DPRI | 03/23/2004 | 03/25/2004 | IN-COMPLIANCE | PINKOVSKY | 9/6 | TERMINAL FACILITY PROJECT | |||||
Completion Notes CERTIFICATE #099936 | |||||||||||
TXI | 01/14/2004 | 01/28/2004 | IN-COMPLIANCE | PINKOVSKY | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL | |||||||||||
DSNR | 10/15/2003 | 10/15/2003 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DSNR FOR TANK 362-D (TWO SIR INCONCLUSIVES)--TANK AND LINE TESTS DONE 8/6/2003, RECEIVED 10/15/2003. | |||||||||||
TCR | 09/30/2003 | 10/01/2003 | IN-COMPLIANCE | PINKOVSKY | 9/6 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: ABOVEGROUND- IRON; UNDERGROUND AMERON DOUBLEWALLED FIBERGLASS | |||||||||||
TIN | 08/15/2003 | 08/20/2003 | IN-COMPLIANCE | PINKOVSKY | 9/6 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL, INSTALL TWO 3000 GALLON ASTS | |||||||||||
IRFR | 07/23/2003 | 07/23/2003 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INF FOR TWO CONSECUTIVE INCONCLUSIVE SIR REPORTS, TANK 362D. TANK TIGHTNESS TEST BEING ARRANGED. | |||||||||||
DSNR | 04/24/2003 | 04/29/2003 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DSNR FOR INVESTIGATION REPORT RECEIVED FROM S. PUMP AND TANK--NO WATER IN TANK INTERSTICE AND SENSORS REPLACED. | |||||||||||
IRFR | 03/27/2003 | 03/28/2003 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INF FOR WATER ALARM IN TANK 278BRI INTERSTICE. | |||||||||||
TCI | 03/26/2003 | 03/31/2003 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 9/6 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: IRON, FIBERGLASS (AMERON) NEW DPRI CERTIFICATE #099925 | |||||||||||
DPRI | 03/26/2003 | 03/31/2003 | PINKOVSKY | 9/6 | TERMINAL FACILITY PROJECT | ||||||
Completion Notes CERTIFICATE # 099925 | |||||||||||
LTR | 08/27/2002 | 08/27/2002 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NOTIFICATION OF COUNTY REVIEW FOR DPRI | |||||||||||
DSNR | 06/05/2002 | 06/06/2002 | DREW PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes RELEASE CONFINED TO SECONDARY PIPING, PER 30 MAY 2002 LTR. | |||||||||||
TCR | 04/26/2002 | 04/29/2002 | IN-COMPLIANCE | PINKOVSKY | 7/6 | COMPLIANCE ASSURANCE | |||||
TCI | 03/28/2002 | 04/01/2002 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 7/6 | COMPLIANCE ASSURANCE | |||||
IRFR | 03/27/2002 | 03/29/2002 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INCIDENT REPORT FOR SENSOR CABLE ALARM IN DOUBLEWALLED PIPING | |||||||||||
TXI | 12/26/2001 | 12/27/2001 | IN-COMPLIANCE | PINKOVSKY | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLOSING OLD PIPELINE NEAR BLDG 370, 393, 431(OLD TANK #11 AREA) | |||||||||||
TCI | 03/28/2001 | 03/28/2001 | IN-COMPLIANCE | PINKOVSKY | 7/6 | COMPLIANCE ASSURANCE | |||||
TCR | 08/02/2000 | 08/04/2000 | IN-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 06/26/2000 | 06/28/2000 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | |||||
TCI | 03/22/2000 | 03/27/2000 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 7/6 | COMPLIANCE ASSURANCE | |||||
TXI | 02/23/2000 | 02/24/2000 | IN-COMPLIANCE | PINKOVSKY | 1/0 | COMPLIANCE ASSURANCE | |||||
TXI | 10/13/1999 | 10/13/1999 | IN-COMPLIANCE | PINKOVSKY | 1/0 | COMPLIANCE ASSURANCE | |||||
TIN | 05/20/1999 | 06/01/1999 | IN-COMPLIANCE | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | |||||
TIN | 02/19/1999 | 03/17/1999 | IN-COMPLIANCE | PINKOVSKY | 7/6 | COMPLIANCE ASSURANCE | |||||
TCI | 02/18/1999 | 03/16/1999 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 7/6 | COMPLIANCE ASSURANCE | |||||
TXI | 01/15/1999 | 03/11/1999 | IN-COMPLIANCE | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Phone Conversation | 04/11/2025 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Site Inspection | 04/11/2025 | Major Out of Compliance | GARTIN_D | 15/2 | Routine Compliance | ||||||
Letter | 04/10/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 04/10/2025 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Letter | 04/10/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Discharge Reporting | 02/20/2025 | Satisfied | GARTIN_D | Discharge | |||||||
Site Inspection | 02/20/2025 | In Compliance | GARTIN_D | 13/2 | Discharge | ||||||
Enforcement Tracking | 12/20/2023 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Enforcement Referral | 08/07/2023 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Letter | 05/18/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 05/18/2023 | Major Out of Compliance | KHAN_MR_1 | 13/2 | Routine Compliance | ||||||
Issue Document | 08/16/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 08/16/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 08/13/2021 | Satisfied | PANGAHAS_RL_1 | Compliance Assistance | |||||||
Letter | 05/21/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 05/21/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Phone Conversation | 05/20/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Electronic Communication | 05/20/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 05/20/2021 | Minor Out of Compliance | PANGAHAS_RL_1 | 13/2 | Routine Compliance | ||||||
Electronic Communication | 05/20/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Electronic Communication | 05/20/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Record Document | 06/28/2019 | Satisfied | PANGAHAS_RL_1 | Closure | |||||||
Site Inspection | 06/28/2019 | In Compliance | PANGAHAS_RL_1 | 13/2 | Closure | ||||||
Issue Document | 06/25/2019 | Satisfied | WILSON_ML_1 | Installation | |||||||
Site Inspection | 06/24/2019 | In Compliance | PANGAHAS_RL_1 | 13/2 | Installation | ||||||
Site Inspection | 05/30/2019 | In Compliance | GILLMAN_M | 13/2 | QA/QC | ||||||
Issue Document | 10/01/2018 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Letter | 10/01/2018 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Site Inspection | 09/28/2018 | In Compliance | PANGAHAS_RL_1 | 13/2 | Routine Compliance | ||||||
Phone Conversation | 09/27/2018 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Electronic Communication | 09/27/2018 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 12/22/2016 | In Compliance | BRAZILE_DO_1 | 2/0 | Installation | ||||||
Site Inspection | 11/21/2016 | In Compliance | BRAZILE_DO_1 | 13/2 | Routine Compliance | ||||||
Site Inspection | 06/12/2015 | In Compliance | BRAZILE_DO_1 | 1/0 | Installation | ||||||
Site Inspection | 05/13/2015 | In Compliance | BRAZILE_DO_1 | 9/2 | Routine Compliance | ||||||
Site Inspection | 05/30/2013 | In Compliance | BRAZILE_DO_1 | 11/2 | Routine Compliance | ||||||
Site Inspection | 05/10/2012 | In Compliance | BRAZILE_DO_1 | 9/2 | Routine Compliance | ||||||
Site Inspection | 03/06/2012 | In Compliance | BRAZILE_DO_1 | 1/35 | Closure | ||||||
Site Inspection | 03/06/2012 | In Compliance | BRAZILE_DO_1 | 1/0 | Installation | ||||||
Site Inspection | 02/24/2012 | In Compliance | BRAZILE_DO_1 | 9/2 | Non-Compliance | ||||||
Letter | 11/23/2011 | Satisfied | CLEMONS_AM_1 | Closure | |||||||
TCAR | 11/23/2011 | Satisfied | PURDY_EM_1 | Closure | |||||||
Enforcement Tracking | 10/10/2011 | Closed With Enforcement | GILLMAN_M | Enforcement | |||||||
Document Management | 10/10/2011 | Complete | GILLMAN_M | Enforcement | |||||||
Document Management | 10/10/2011 | Complete | GILLMAN_M | Enforcement | |||||||
TCAR | 09/30/2011 | Satisfied | CLEMONS_AM_1 | Closure | |||||||
Letter | 09/30/2011 | Satisfied | CLEMONS_AM_1 | Closure | |||||||
Site Inspection | 08/22/2011 | In Compliance | BRAZILE_DO_1 | 0/5 | Closure | ||||||
Document Management | 08/09/2011 | Complete | GILLMAN_M | Enforcement | |||||||
Site Inspection | 07/28/2011 | In Compliance | BRAZILE_DO_1 | 0/5 | Routine Compliance | ||||||
Letter | 05/02/2011 | Satisfied | RHOADS_KM_1 | Non-Compliance | |||||||
Site Inspection | 04/27/2011 | Major Out of Compliance | BRAZILE_DO_1 | 9/6 | Routine Compliance | ||||||
Letter | 07/26/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 07/16/2010 | Major Out of Compliance | BRAZILE_DO_1 | 9/6 | Non-Compliance | ||||||
Enforcement Referral | 06/07/2010 | Accepted | GILLMAN_M | Enforcement | |||||||
Letter | 06/02/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 06/02/2010 | Major Out of Compliance | BRAZILE_DO_1 | 9/6 | Routine Compliance | ||||||
Complaint | 03/13/2009 | Satisfied | BRAZILE_DO_1 | Complaint | |||||||
Site Inspection | 02/12/2009 | In Compliance | BRAZILE_DO_1 | 9/6 | Routine Compliance | ||||||
Site Inspection | 02/16/2008 | In Compliance | BRAZILE_DO_1 | 9/6 | Routine Compliance | ||||||
Site Inspection | 12/21/2006 | In Compliance | BRAZILE_DO_1 | 9/6 | Routine Compliance | ||||||
Site Inspection | 06/23/2006 | In Compliance | BRAZILE_DO_1 | 2/0 | Installation | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
04/10/2025 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have integrity testing conducted for the 3 Dispenser sumps for tank 654M and 654D; Piping and Transition sumps associated with tank 654M/654D, 278AR1, and 278BR1; Double Wall Spill Bucket 278AR1 and 278BR1 and provide current integrity testing results to Daniel.Gartin@flhealth.gov. | |||||||
04/10/2025 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide current annual operability testing for release detection devices of the Spill bucket gauges for tank 278AR1 and 278BR1 and the Automatic Tank Gauge systems with sensor monitoring for tank 278AR1 and 278BR1 to Daniel.Gartin@flhealth.gov. | |||||||
04/10/2025 | 6021 | SNC-B | 4.1 Failure of secondary containment to meet standards including: impervious spill containment, liners, allowing for release detection, allow for monitoring point, and hydrant pit secondary containment. | Unless concrete meets requirements of secondary containment and can serve to collect potential discharge without release occurring, the system is required to either remove single wall piping for double wall piping installation or make secondary containment meet requirements for impervious to petroleum product. If the concrete trench is designed to be impervious, that information is required to be provided that demonstrates the concrete containment is impervious and capable of holding maximum capacity of a potential discharge from pressurized piping. Ensure Daniel.Gartin@flhealth.gov and Mark.Gillman@FloridaDEP.gov, and Sara.Merritt@FloridaDEP.gov are included regarding communication with this item and the actions the facility will be taking. | |||||||
04/10/2025 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Have annual operability testing for release detection conducted for the following devices: Rupture Basin alarm for tank 591ER1, 591WR1, 350GT, G608, G470, and G300R1; Krueger At-A-Glance Leak Gauge for tank 600 and 544GT; Automatic Tank Gauge systems with interstitial monitoring sensor for 551S, 551N, 654M, 654D, 577, and 172R1. Submit the testing results to Daniel.Gartin@flhealth.gov. | |||||||
04/10/2025 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide the annual operability testing for the line leak detectors of tank 278AR1 and 278BR1 to Daniel.Gartin@flhealth.gov. | |||||||
04/10/2025 | 7089 | Minor | 1.11 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Submit testing for the double wall piping line's integrity to Daniel.Gartin@flhealth.gov. Note this testing is required to be conducted once within at least every 36 months. | |||||||
04/10/2025 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide current annual operability testing conducted for the Flapper Valve for tank 278AR1 and 278BR1 to Daniel.Gartin@flhealth.gov. | |||||||
04/10/2025 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Have the annual operability for overfill prevention testing conducted for the following overfill prevention devices installed on tanks: OPW fuel level gauge for tank 591ER1, 591WR1, and 172R1; Rochester Gauge for tank G608 and G470; Krueger Fuel Level Gauge for tank 600, G300R1, and 350GT [note 350GT has unknown additional fuel gauge on separate compartment requiring testing]; Morrison Clock Gauge for tank 654M, 654D, 551S, 551N and 544GT; Veeder Root overfill alarm for tank 577. Submit associated testing results to Daniel.Gartin@flhealth.gov | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
08/24/2024 | INACTIVE | ||||||||||
08/11/1997 | INACTIVE | 9 | |||||||||
07/17/1997 | INACTIVE | 9 | BOUTWELL_CJ | ||||||||
09/17/1996 | INACTIVE | 9 | |||||||||
08/25/1995 | INACTIVE | 9 | |||||||||
07/17/1995 | COMPLETED | ||||||||||
07/03/1995 | INACTIVE | 10 | |||||||||
05/16/1995 | INACTIVE | 10 | |||||||||
02/16/1994 | INACTIVE | 10 | |||||||||
09/03/1992 | INACTIVE | 9 | |||||||||
06/30/1992 | INACTIVE | 10 | |||||||||