Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/23/2025 Last Data Refresh: 02/22/2025 Report Generated from DOPPLER | |||||||||||
District | South | Type | County Government | ||||||||
County | Collier | Status | OPEN | ||||||||
ID | 8518749 | Latitude | 25° 59' 55.9617 | ||||||||
Name |
COLLIER CNTY-MARCO ISLAND EXEC AIRPRT 2005 MAINSAIL DR |
Longitude | 81° 40' 29.4849 | ||||||||
NAPLES, FL 34114 | LL Method | DPHO | |||||||||
Contact | Nick Rossdale | LL Status | REVIEWED | ||||||||
Phone | (239) 776-1481 | Status Date | 04/23/2003 | ||||||||
Account Owner Information | |||||||||||
Name | COLLIER CNTY BD COMMISSIONERS 3339 TAMIAMI TRL E #302 Naples, FL 34112 |
Effective Date | 05/04/2018 | ||||||||
Contact | PHIL SYNDERBURN | ||||||||||
Phone | (239) 252-2508 | ||||||||||
TANKS@COLLIERCOUNTYFL.GOV | |||||||||||
Placard # / Date | 678692 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | COLLIER CNTY BD COMMISSIONERS 3339 TAMIAMI TRL E #302 Naples, FL 34112 |
Effective Date | 05/04/2018 | ||||||||
Contact | PHIL SYNDERBURN | ||||||||||
Phone | (239) 252-2508 | ||||||||||
TANKS@COLLIERCOUNTYFL.GOV | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1A | 12000 | Aviation Gas (E) | 02/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2J | 12000 | Jet Fuel (F) | 02/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3J | 12000 | Jet Fuel (F) | 02/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4D | 500 | Vehicular Diesel (D) | 02/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5U | 500 | Unleaded Gas (B) | 02/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6J | 12000 | Jet Fuel (F) | 12/01/2023 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Aviation Gas (E) | 07/01/1976 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Jet Fuel (F) | 07/01/1976 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | Jet Fuel (F) | 07/01/1976 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 20000 | Unleaded Gas (B) | 07/01/1976 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 1000 | Aviation Gas (E) | 03/01/1997 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(X) No piping associated w/tank | (Q) Visual inspection of ASTs | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 10/01/2023 | 10/01/2026 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 10/01/2020 | 10/01/2023 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 10/01/2017 | 10/01/2020 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2014 | 10/01/2017 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2011 | 10/01/2014 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2009 | 09/30/2010 | GREENWICH | ||||||||
INSURANCE | 10/01/2009 | 10/01/2011 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2007 | 10/01/2008 | INDIAN HARBOR | ||||||||
INSURANCE | 01/01/1989 | 01/01/1991 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 01/04/2006 | 02/02/2006 | MINOR OUT-OF-COMPLIANCE | OWEN_JA | 4/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes EPOXY LINER NEEDS REPAIR # 2131, UNREGISTERED TANK AT FACILITY #2001, AST EXTERIOR COATING NEEDS REPAIR #2014 | |||||||||||
TCI | 03/11/2005 | 04/02/2005 | IN-COMPLIANCE | GARBEE_M | 4/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes TANK 4 OUT OF SERVICE. NEEDS NEW REGISTRATION FORM TO REVISE STATUS. | |||||||||||
TCI | 05/21/2004 | 06/16/2004 | IN-COMPLIANCE | DUNGAN_D | 4/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes RECOMMEND REPAIR OF CRACKING IN CONTAINMENT COATING. | |||||||||||
CWOE | 05/06/2004 | 05/07/2004 | KOLANDA | 4/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CLOSED #3 | |||||||||||
RRBD | 05/06/2004 | 05/07/2004 | KOLANDA | 4/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PROOF OF POLLUTION LIABILITY INSURANCE REC'D | |||||||||||
TCI | 05/04/2004 | 05/04/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | KOLANDA | 4/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: SW STEEL -- ALL IN DIKE FIELD AREA | |||||||||||
NCLI | 02/03/2003 | 02/03/2003 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NCLI FOR TCI DATED 1/27/03 | |||||||||||
TCI | 01/27/2003 | 01/29/2003 | IN-COMPLIANCE | HOGAN_S | 4/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes IN COMPLIANCE. FACILITY WAS ASSIGNED TO POLLUTION CONTROL ON FY02-03 TANK INSPECTION CONTRACT. | |||||||||||
TCR | 09/18/2002 | 09/18/2002 | IN-COMPLIANCE | NORMAN, T | 4/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes CONTAINMENT COATED AND TANKS PAINTED WITH DEP APPROVED LINER | |||||||||||
TCI | 05/13/2002 | 05/13/2002 | IN-COMPLIANCE | NORMAN, T | 4/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY IN PROCESS OF COATING CONTAINMENT-REPAINT TANKS | |||||||||||
TCI | 06/26/2001 | 06/27/2001 | MINOR OUT-OF-COMPLIANCE | NORMAN, T | 4/0 | COMPLIANCE ASSURANCE | |||||
TCI | 12/16/1999 | 12/17/1999 | IN-COMPLIANCE | PHILIP SNYDERBURN | 4/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes IN COMPLIANCE. HOWEVER, LINER NEEDS TO BE PAINTED ON THE CONCRETE TO MEET REQUIREMENTS OF TABLE AST BY 1/1/2000 | |||||||||||
TCR | 01/22/1999 | 06/15/1999 | IN-COMPLIANCE | SNYDERBURN_P | 4/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY IN COMPLIANCE, CORRECTIVE ACTIONS TAKEN. | |||||||||||
TCI | 12/15/1998 | 06/15/1999 | MINOR OUT-OF-COMPLIANCE | SNYDERBURN_P | 4/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes WRITTEN RD, DRAIN VALVES OPEN, SECONDARY CONTAINMENT CRACKED. | |||||||||||
ATCI | 12/01/1997 | 12/17/1997 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Completion Notes 4 SINGLE WALL STEEL TANKS IN LARGE CONTAINMENT AREA W/ PIPING & DISPENSERS. | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 02/13/2025 | Satisfied | CAMERO_H | Enforcement | |||||||
Enforcement Referral | 02/12/2025 | Accepted | CAMERO_H | Enforcement | |||||||
Site Inspection | 02/10/2025 | Major Out of Compliance | CAMERO_H | 4/0 | Routine Compliance | ||||||
Letter | 11/14/2024 | Satisfied | CAMERO_H | Compliance Assistance | |||||||
Site Inspection | 11/14/2024 | Major Out of Compliance | CAMERO_H | 4/0 | Installation | ||||||
Letter | 12/13/2022 | Satisfied | CERQUERA_L | Compliance Assistance | |||||||
Site Inspection | 12/12/2022 | Major Out of Compliance | CERQUERA_L | 3/0 | Routine Compliance | ||||||
Letter | 01/17/2020 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Electronic Communication | 09/19/2019 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Electronic Communication | 08/27/2019 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Site Inspection | 07/08/2019 | Major Out of Compliance | HERNANDEZ_N | 3/0 | Routine Compliance | ||||||
Letter | 07/08/2019 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Site Inspection | 07/06/2017 | In Compliance | BATES_TD_1 | 0/0 | Installation | ||||||
Discharge Reporting | 06/01/2017 | Satisfied | HERNANDEZ_N | Discharge | |||||||
Document Management | 04/17/2017 | Satisfied | HERNANDEZ_N | Discharge | |||||||
Site Inspection | 01/20/2016 | In Compliance | HERNANDEZ_N | 3/0 | Routine Compliance | ||||||
Site Inspection | 02/15/2013 | In Compliance | SPARKS_JD_1 | 3/0 | Routine Compliance | ||||||
Site Inspection | 06/17/2011 | In Compliance | SPARKS_JD_1 | 3/0 | Routine Compliance | ||||||
Record Document | 03/19/2010 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Record Document | 03/01/2010 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Site Inspection | 02/25/2010 | Minor Out of Compliance | NOVAK_KM_1 | 1/0 | Closure | ||||||
Letter | 02/25/2010 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Site Inspection | 02/19/2010 | Minor Out of Compliance | NOVAK_KM_1 | 3/0 | Routine Compliance | ||||||
Letter | 02/19/2010 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Site Inspection | 10/03/2007 | In Compliance | SNYDERBURN_PJ_2 | 10/0 | Non-Compliance | ||||||
Letter | 03/20/2007 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 03/19/2007 | Major Out of Compliance | SNYDERBURN_PJ_2 | 4/0 | Installation | ||||||
Site Inspection | 01/17/2007 | In Compliance | POTTS_CR | 4/0 | Routine Compliance | ||||||
Record Document | 01/02/2007 | Satisfied | POTTS_CR | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/28/2025 | 7064 | Minor | 3.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Record any issues found during monthly visual inspections on inspection log. For three consecutive months, perform the MVI and send copy to the inspector by email. | |||||||
01/24/2025 | 7042 | SNC-B | 3.9 Storage tank system not installed with a spill containment system at each tank fill connection. Does not meet performance requirements. | Ensure drain valves on spill containment stay closed to prevent discharges. Storage tanks shall be installed with a spill containment system at each storage tank fill connection, except within dike field areas with secondary containment. The spill containment system shall meet the requirements of paragraph 62-762.501(1)(b), F.A.C., and be registered in accordance with subsection 62-762.851(2), F.A.C. | |||||||
12/01/2022 | 7040 | SNC-B | 3.8 Overfill protection not provided. Fuel transfer not monitored. Alarms not installed. | Provide at least one overfill protection device or containment method for each of the systems, in accordance with Chapter 62-762.501(2)(e)2. | |||||||
12/01/2022 | 7095 | Minor | 1.14 Records requiring 3 year documentation period not kept by facility. | Provide the 2022 annual operability testing result records for the release detection & designated primary overfill protection devices currently present at the system. | |||||||
11/30/2022 | 7030 | Minor | 3.6 Exterior coatings not protected from external corrosion, deterioration or degradation. | Investigate the severity of the corrosion and conduct the necessary repairs. Periodic maintenance is required as a preventative measure to minimize corrosion. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/12/2017 | COMPLETED | ||||||||||
12/06/1988 | ACTIVE | 7 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||