Cover Page Report
Report Run Date: 02/23/2025        Last Data Refresh: 02/22/2025        Report Generated from DOPPLER
 
District South   Type    County Government
 
County Collier   Status    OPEN
 
ID 8518749   Latitude    25° 59' 55.9617
 
Name COLLIER CNTY-MARCO ISLAND EXEC AIRPRT
2005 MAINSAIL DR
Longitude    81° 40' 29.4849
  NAPLES, FL 34114 LL Method    DPHO
 
Contact Nick Rossdale   LL Status    REVIEWED
 
Phone (239) 776-1481   Status Date    04/23/2003
 
Account Owner Information
 
Name COLLIER CNTY BD COMMISSIONERS
3339 TAMIAMI TRL E #302
Naples, FL 34112
Effective Date    05/04/2018
 
Contact PHIL SYNDERBURN
 
Phone (239) 252-2508
 
Email TANKS@COLLIERCOUNTYFL.GOV
  Placard # / Date    678692 - 06/05/2024
Property Owner Information
 
Name COLLIER CNTY BD COMMISSIONERS
3339 TAMIAMI TRL E #302
Naples, FL 34112
Effective Date    05/04/2018
 
Contact PHIL SYNDERBURN
 
Phone (239) 252-2508
 
Email TANKS@COLLIERCOUNTYFL.GOV
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
1A 12000 Aviation Gas (E) 02/01/2007 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
2J 12000 Jet Fuel (F) 02/01/2007 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
3J 12000 Jet Fuel (F) 02/01/2007 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
4D 500 Vehicular Diesel (D) 02/01/2007 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
5U 500 Unleaded Gas (B) 02/01/2007 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
6J 12000 Jet Fuel (F) 12/01/2023 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
1 10000 Aviation Gas (E) 07/01/1976 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
2 10000 Jet Fuel (F) 07/01/1976 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
3 12000 Jet Fuel (F) 07/01/1976 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
4 20000 Unleaded Gas (B) 07/01/1976 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
5 1000 Aviation Gas (E) 03/01/1997 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
  (X) No piping associated w/tank (Q) Visual inspection of ASTs
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   10/01/2023 10/01/2026 INDIAN HARBOR INSURANCE COMPANY
INSURANCE   10/01/2020 10/01/2023 INDIAN HARBOR INSURANCE COMPANY
INSURANCE   10/01/2017 10/01/2020 INDIAN HARBOR
INSURANCE   10/01/2014 10/01/2017 INDIAN HARBOR
INSURANCE   10/01/2011 10/01/2014 INDIAN HARBOR
INSURANCE   10/01/2009 09/30/2010 GREENWICH
INSURANCE   10/01/2009 10/01/2011 INDIAN HARBOR
INSURANCE   10/01/2007 10/01/2008 INDIAN HARBOR
INSURANCE   01/01/1989 01/01/1991 FPLIPA
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 01/04/2006 02/02/2006 MINOR OUT-OF-COMPLIANCE OWEN_JA 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes EPOXY LINER NEEDS REPAIR # 2131, UNREGISTERED TANK AT FACILITY #2001, AST EXTERIOR COATING NEEDS REPAIR #2014
 
TCI 03/11/2005 04/02/2005 IN-COMPLIANCE GARBEE_M 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes TANK 4 OUT OF SERVICE. NEEDS NEW REGISTRATION FORM TO REVISE STATUS.
 
TCI 05/21/2004 06/16/2004 IN-COMPLIANCE DUNGAN_D 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes RECOMMEND REPAIR OF CRACKING IN CONTAINMENT COATING.
 
CWOE 05/06/2004 05/07/2004 KOLANDA 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes CLOSED #3
 
RRBD 05/06/2004 05/07/2004 KOLANDA 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes PROOF OF POLLUTION LIABILITY INSURANCE REC'D
 
TCI 05/04/2004 05/04/2004 SIGNIFICANT OUT-OF-COMPLIANCE KOLANDA 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: SW STEEL -- ALL IN DIKE FIELD AREA
 
NCLI 02/03/2003 02/03/2003 HOGAN_S 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes NCLI FOR TCI DATED 1/27/03
 
TCI 01/27/2003 01/29/2003 IN-COMPLIANCE HOGAN_S 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes IN COMPLIANCE. FACILITY WAS ASSIGNED TO POLLUTION CONTROL ON FY02-03 TANK INSPECTION CONTRACT.
 
TCR 09/18/2002 09/18/2002 IN-COMPLIANCE NORMAN, T 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes CONTAINMENT COATED AND TANKS PAINTED WITH DEP APPROVED LINER
 
TCI 05/13/2002 05/13/2002 IN-COMPLIANCE NORMAN, T 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes FACILITY IN PROCESS OF COATING CONTAINMENT-REPAINT TANKS
 
TCI 06/26/2001 06/27/2001 MINOR OUT-OF-COMPLIANCE NORMAN, T 4/0 COMPLIANCE ASSURANCE
 
TCI 12/16/1999 12/17/1999 IN-COMPLIANCE PHILIP SNYDERBURN 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes IN COMPLIANCE. HOWEVER, LINER NEEDS TO BE PAINTED ON THE CONCRETE TO MEET REQUIREMENTS OF TABLE AST BY 1/1/2000
 
TCR 01/22/1999 06/15/1999 IN-COMPLIANCE SNYDERBURN_P 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes FACILITY IN COMPLIANCE, CORRECTIVE ACTIONS TAKEN.
 
TCI 12/15/1998 06/15/1999 MINOR OUT-OF-COMPLIANCE SNYDERBURN_P 4/0 COMPLIANCE ASSURANCE
 
 Completion Notes WRITTEN RD, DRAIN VALVES OPEN, SECONDARY CONTAINMENT CRACKED.
 
ATCI 12/01/1997 12/17/1997 MINOR OUT-OF-COMPLIANCE COMPLIANCE ASSURANCE
 
 Completion Notes 4 SINGLE WALL STEEL TANKS IN LARGE CONTAINMENT AREA W/ PIPING & DISPENSERS.
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 02/13/2025 Satisfied CAMERO_H Enforcement
 
Enforcement Referral 02/12/2025 Accepted CAMERO_H Enforcement
 
Site Inspection 02/10/2025 Major Out of Compliance CAMERO_H 4/0 Routine Compliance
 
Letter 11/14/2024 Satisfied CAMERO_H Compliance Assistance
 
Site Inspection 11/14/2024 Major Out of Compliance CAMERO_H 4/0 Installation
 
Letter 12/13/2022 Satisfied CERQUERA_L Compliance Assistance
 
Site Inspection 12/12/2022 Major Out of Compliance CERQUERA_L 3/0 Routine Compliance
 
Letter 01/17/2020 Satisfied HERNANDEZ_N Compliance Assistance
 
Electronic Communication 09/19/2019 Satisfied HERNANDEZ_N Compliance Assistance
 
Electronic Communication 08/27/2019 Satisfied HERNANDEZ_N Compliance Assistance
 
Site Inspection 07/08/2019 Major Out of Compliance HERNANDEZ_N 3/0 Routine Compliance
 
Letter 07/08/2019 Satisfied HERNANDEZ_N Compliance Assistance
 
Site Inspection 07/06/2017 In Compliance BATES_TD_1 0/0 Installation
 
Discharge Reporting 06/01/2017 Satisfied HERNANDEZ_N Discharge
 
Document Management 04/17/2017 Satisfied HERNANDEZ_N Discharge
 
Site Inspection 01/20/2016 In Compliance HERNANDEZ_N 3/0 Routine Compliance
 
Site Inspection 02/15/2013 In Compliance SPARKS_JD_1 3/0 Routine Compliance
 
Site Inspection 06/17/2011 In Compliance SPARKS_JD_1 3/0 Routine Compliance
 
Record Document 03/19/2010 Satisfied NOVAK_KM_1 Non-Compliance
 
Record Document 03/01/2010 Satisfied NOVAK_KM_1 Non-Compliance
 
Site Inspection 02/25/2010 Minor Out of Compliance NOVAK_KM_1 1/0 Closure
 
Letter 02/25/2010 Satisfied NOVAK_KM_1 Non-Compliance
 
Site Inspection 02/19/2010 Minor Out of Compliance NOVAK_KM_1 3/0 Routine Compliance
 
Letter 02/19/2010 Satisfied NOVAK_KM_1 Non-Compliance
 
Site Inspection 10/03/2007 In Compliance SNYDERBURN_PJ_2 10/0 Non-Compliance
 
Letter 03/20/2007 Satisfied SNYDERBURN_PJ_2 Non-Compliance
 
Site Inspection 03/19/2007 Major Out of Compliance SNYDERBURN_PJ_2 4/0 Installation
 
Site Inspection 01/17/2007 In Compliance POTTS_CR 4/0 Routine Compliance
 
Record Document 01/02/2007 Satisfied POTTS_CR Non-Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
01/28/2025 7064 Minor 3.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. Record any issues found during monthly visual inspections on inspection log. For three consecutive months, perform the MVI and send copy to the inspector by email.
 
01/24/2025 7042 SNC-B 3.9 Storage tank system not installed with a spill containment system at each tank fill connection. Does not meet performance requirements. Ensure drain valves on spill containment stay closed to prevent discharges. Storage tanks shall be installed with a spill containment system at each storage tank fill connection, except within dike field areas with secondary containment. The spill containment system shall meet the requirements of paragraph 62-762.501(1)(b), F.A.C., and be registered in accordance with subsection 62-762.851(2), F.A.C.
 
12/01/2022 7040 SNC-B 3.8 Overfill protection not provided. Fuel transfer not monitored. Alarms not installed. Provide at least one overfill protection device or containment method for each of the systems, in accordance with Chapter 62-762.501(2)(e)2.
 
12/01/2022 7095 Minor 1.14 Records requiring 3 year documentation period not kept by facility. Provide the 2022 annual operability testing result records for the release detection & designated primary overfill protection devices currently present at the system.
 
11/30/2022 7030 Minor 3.6 Exterior coatings not protected from external corrosion, deterioration or degradation. Investigate the severity of the corrosion and conduct the necessary repairs. Periodic maintenance is required as a preventative measure to minimize corrosion.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
04/12/2017   COMPLETED
 
12/06/1988   ACTIVE 7 EARLY DETECTION INCENTIVE-ELIGIBLE