Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Federal Government | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8518772 | Latitude | 30° 4' 46.6865 | ||||||||
Name |
US AIR FORCE TYNDALL 400 TANK FARM 119 ALABAMA AVE - 325 CES |
Longitude | 85° 35' 57.9044 | ||||||||
PANAMA CITY, FL 32403-5014 | LL Method | DPHO | |||||||||
Contact | PAUL HULL | LL Status | REVIEWED | ||||||||
Phone | (850) 283-8096 | Status Date | 04/15/2020 | ||||||||
Account Owner Information | |||||||||||
Name | 325 CES ENVIRONMENTAL FLIGHT 101 MISSISSIPPI RD - BLDG 36233 Tyndall Afb, FL 32403-5014 |
Effective Date | 02/11/1997 | ||||||||
Contact | CHANDLER BROOME | ||||||||||
Phone | (850) 358-1767 | ||||||||||
CHANDLER.BROOME.1@US.AF.MIL | |||||||||||
Placard # / Date | |||||||||||
Property Owner Information | |||||||||||
Name | 325 CES - ENVIRONMENTAL FLIGHT 119 ALABAMA AVE - 325 CES TYNDALL AFB, FL 32403 |
Effective Date | 01/04/2019 | ||||||||
Contact | PAUL HULL | ||||||||||
Phone | (850) 867-0379 | ||||||||||
PAUL.HULL@US.AF.MIL | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
402-02 | 2000 | Emerg Generator Diesel (G) | 05/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
415 | 12000 | Vehicular Diesel (D) | 11/01/2010 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms (W) Built on supports |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
416 | 12000 | Ethanol E10 (8) | 11/01/2010 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms (W) Built on supports |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (L) Bulk product system |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
417 | 12000 | Vehicular Diesel (D) | 11/01/2010 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms (W) Built on supports |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (L) Bulk product system |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
012201 | 4275 | Generator/Pump Diesel (H) | 01/01/1975 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
021401 | 1000 | Generator/Pump Diesel (H) | 01/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
021601 | 1000 | Generator/Pump Diesel (H) | 01/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
021901 | 1600 | Emerg Generator Diesel (G) | 01/01/1989 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (D) External protective coating (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
023-01 | 10000 | Aviation Gas (E) | 01/01/1970 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
023903 | 760 | Aviation Gas (E) | 01/01/1987 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (W) Built on supports |
(A) Abv, no soil contact | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
040201 | 2000 | Generator/Pump Diesel (H) | 01/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
040501 | 50000 | Unleaded Gas (B) | 01/01/1985 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
048501 | 5000 | Vehicular Diesel (D) | 01/01/1982 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
050401 | 600 | Generator/Pump Diesel (H) | 01/01/1970 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
064901 | 2000 | Generator/Pump Diesel (H) | 01/01/1959 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
093401 | 1000 | Waste Oil (L) | 01/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
096810 | 10000 | Unleaded Gas (B) | 01/01/1981 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(D) SPCC Plan (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (N) Groundwater monitoring (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
096811 | 10000 | Unleaded Gas (B) | 01/01/1981 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(D) SPCC Plan (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (N) Groundwater monitoring (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
096812 | 10000 | Unleaded Gas (B) | 01/01/1981 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(D) SPCC Plan (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (N) Groundwater monitoring (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1120-1 | 1000 | Generator/Pump Diesel (H) | 01/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1120-2 | 1000 | Emerg Generator Diesel (G) | 05/01/1995 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(Y) Polyethylene | (G) Pipe trench liner | (M) Manual tank gauging - USTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
112001 | 1000 | Generator/Pump Diesel (H) | 01/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
122 | 4275 | Vehicular Diesel (D) | 01/01/1986 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
122-01 | 4275 | Generator/Pump Diesel (H) | 01/01/1975 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
122-02 | 1000 | Vehicular Diesel (D) | 05/01/1995 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system (M) Double wall - pipe jacket (N) Approved synthetic material |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1255-1 | 1000 | Emerg Generator Diesel (G) | 01/01/1993 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
127401 | 42000 | Vehicular Diesel (D) | 01/01/1964 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (Q) DEP approved protection (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
127701 | 1000 | Vehicular Diesel (D) | 01/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1280-1 | 2000 | Vehicular Diesel (D) | 01/01/1970 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1280-2 | 2000 | Emerg Generator Diesel (G) | 01/01/1995 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket |
(A) Abv, no soil contact | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
128201 | 1000 | Vehicular Diesel (D) | 01/01/1991 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
13-01 | 600 | Generator/Pump Diesel (H) | 01/01/1970 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1465-2 | 6000 | Emerg Generator Diesel (G) | 01/01/1993 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
16-02 | 250 | Generator/Pump Diesel (H) | 02/01/1995 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner | (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1601 | 250 | Generator/Pump Diesel (H) | 01/01/1975 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
172501 | 3000 | Emerg Generator Diesel (G) | 01/01/1991 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
180801 | 1000 | Emerg Generator Diesel (G) | 01/01/1980 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (W) Built on supports |
(A) Abv, no soil contact (D) External protective coating (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
183 | 1000 | Jet Fuel (F) | 04/01/1971 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
203 | 3000 | Jet Fuel (F) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
206-03 | 1000 | Emerg Generator Diesel (G) | 01/01/1980 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (D) External protective coating (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
206-04 | 2000 | Emerg Generator Diesel (G) | 10/01/1998 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (M) Manual tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
214-01 | 1000 | Vehicular Diesel (D) | 01/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
214-02 | 1000 | Vehicular Diesel (D) | 05/01/1995 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(F) Double wall | (A) Site Suitability Plan (B) Site Suitabilitiy Plan exemption (I) Not required |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
216-01 | 1000 | Vehicular Diesel (D) | 01/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
217-1 | 1200 | Emerg Generator Diesel (G) | 01/01/1980 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
217-2 | 1000 | Emerg Generator Diesel (G) | 01/01/1990 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (R) Double wall - tank jacket |
(A) Abv, no soil contact (I) Suction piping system (N) Approved synthetic material |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
219-01 | 1600 | Emerg Generator Diesel (G) | 01/01/1989 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (D) External protective coating (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
219-02 | 1000 | Emerg Generator Diesel (G) | 05/01/1995 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(Y) Polyethylene | (G) Pipe trench liner | (M) Manual tank gauging - USTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
235-01 | 600 | Vehicular Diesel (D) | 01/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
23501 | 600 | Generator/Pump Diesel (H) | 01/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
239-03 | 760 | Aviation Gas (E) | 01/01/1987 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (W) Built on supports |
(A) Abv, no soil contact | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
239-04 | 1000 | Jet Fuel (F) | 11/01/1998 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (M) Spill containment bucket (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
239-10 | 250 | Aviation Gas (E) | 09/01/1998 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(F) Monitor dbl wall tank space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
263-1 | 1000 | Vehicular Diesel (D) | 08/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
263-2 | 2000 | Leaded Gas (A) | 08/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
263-3 | 1500 | Unleaded Gas (B) | 08/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2631 | 1000 | Vehicular Diesel (D) | 08/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2632 | 2000 | Leaded Gas (A) | 08/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2633 | 2000 | Leaded Gas (A) | 08/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2693 | 3000 | Leaded Gas (A) | 07/01/1977 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (E) Fiberglass (K) AST containment |
(D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
270601 | 10000 | Unleaded Gas (B) | 01/01/1990 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(B) Steel/galvanized metal (D) External protective coating (F) Double wall (I) Suction piping system (M) Double wall - pipe jacket (N) Approved synthetic material |
(K) Monitor dbl wall pipe space (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
270602 | 2000 | Unleaded Gas (B) | 06/01/1997 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system (K) Dispenser liners |
(F) Monitor dbl wall tank space (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
270603 | 6000 | Unleaded Gas (B) | 02/01/1999 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (F) Fiberglass clad steel (K) AST containment (M) Spill containment bucket (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
320-01 | 1000 | Generator/Pump Diesel (H) | 01/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
323-1 | 2500 | Jet Fuel (F) | 01/01/1992 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (I) Suction piping system (Z) DEP approved piping |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
325-1 | 5000 | Jet Fuel (F) | 01/01/1993 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (I) Suction piping system (Z) DEP approved piping |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
325-5 | 2500 | Jet Fuel (F) | 01/01/1993 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (I) Suction piping system (Z) DEP approved piping |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3350-1 | 12000 | Unleaded Gas (B) | 06/01/1998 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3350-2 | 12000 | Unleaded Gas (B) | 06/01/1998 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3350-3 | 12000 | Unleaded Gas (B) | 06/01/1998 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
401-01 | 50000 | Vehicular Diesel (D) | 01/01/1985 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (K) AST containment (P) Level gauges/alarms (U) Field erected tank |
(B) Steel/galvanized metal (E) Cathodic protection (I) Suction piping system (K) Dispenser liners (L) Bulk product system |
(4) Visual inspect dispenser liners (D) SPCC Plan (Q) Visual inspection of ASTs (R) Monitor tank bottom space (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
401-1 | 50000 | Vehicular Diesel (D) | 01/01/1985 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
402-01 | 2000 | Vehicular Diesel (D) | 01/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
403-01 | 50000 | Vehicular Diesel (D) | 01/01/1985 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (K) AST containment (P) Level gauges/alarms (U) Field erected tank |
(B) Steel/galvanized metal (E) Cathodic protection (I) Suction piping system (K) Dispenser liners (L) Bulk product system |
(4) Visual inspect dispenser liners (D) SPCC Plan (Q) Visual inspection of ASTs (R) Monitor tank bottom space (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
403-1 | 50000 | Vehicular Diesel (D) | 01/01/1985 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
405-01 | 50000 | Unleaded Gas (B) | 01/01/1985 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (K) AST containment (P) Level gauges/alarms (U) Field erected tank |
(B) Steel/galvanized metal (E) Cathodic protection (I) Suction piping system (K) Dispenser liners (L) Bulk product system |
(4) Visual inspect dispenser liners (D) SPCC Plan (Q) Visual inspection of ASTs (R) Monitor tank bottom space (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
407-01 | 480000 | Jet Fuel (F) | 01/01/1985 | ABOVEGROUND | FieldAST TempOutServ (V) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (H) Impressed current CP (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms (U) Field erected tank |
(B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (L) Bulk product system |
(1) Continuous electronic sensing (6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
407-1 | 480000 | Jet Fuel (F) | 01/01/1985 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms (U) Field erected tank |
(B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (L) Bulk product system |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
409-1 | 480000 | Jet Fuel (F) | 01/01/1985 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms (U) Field erected tank |
(B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (L) Bulk product system |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
409-1 | 479662 | Jet Fuel (F) | 01/01/1985 | ABOVEGROUND | FieldAST TempOutServ (V) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (H) Impressed current CP (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms (U) Field erected tank |
(B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (L) Bulk product system |
(1) Continuous electronic sensing (6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
411-01 | 2000 | Jet Fuel (F) | 01/01/1985 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(D) SPCC Plan (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
42-01 | 250 | Generator/Pump Diesel (H) | 01/01/1975 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4201 | 250 | Generator/Pump Diesel (H) | 01/01/1975 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
43-01 | 600 | Generator/Pump Diesel (H) | 01/01/1975 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
501303 | 1000 | Unleaded Gas (B) | 01/01/1975 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
501304 | 1000 | Unleaded Gas (B) | 01/01/1975 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5022-1 | 5200 | Vehicular Diesel (D) | 07/01/1996 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (M) Spill containment bucket (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
504-01 | 600 | Generator/Pump Diesel (H) | 01/01/1970 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
505 | 25000 | Aviation Gas (E) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
506 | 25000 | Aviation Gas (E) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
507 | 25000 | Aviation Gas (E) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
508 | 25000 | Aviation Gas (E) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
510 | 25000 | Vehicular Diesel (D) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
511 | 25000 | Leaded Gas (A) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
512 | 25000 | Leaded Gas (A) | 07/01/1950 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
513 | 25000 | Leaded Gas (A) | 07/01/1950 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
514 | 221000 | Aviation Gas (E) | 07/01/1955 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (E) Fiberglass |
(D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
515 | 25000 | Leaded Gas (A) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
516 | 25000 | Leaded Gas (A) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
517 | 25000 | Leaded Gas (A) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
518 | 25000 | Leaded Gas (A) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
519 | 25000 | Leaded Gas (A) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
520 | 25000 | Leaded Gas (A) | 07/01/1943 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
546-02 | 150 | Generator/Pump Diesel (H) | 01/01/1970 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
562-1 | 2000 | Vehicular Diesel (D) | 03/01/1994 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (J) Pressurized piping system (N) Approved synthetic material |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
562-2 | 2000 | Unleaded Gas (B) | 03/01/1994 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (J) Pressurized piping system (N) Approved synthetic material |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
565 | 10000 | Unleaded Gas (B) | 07/01/1972 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
566 | 10000 | Leaded Gas (A) | 07/01/1972 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (C) Groundwater Monitoring Plan (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
602501 | 2000 | Vehicular Diesel (D) | 07/01/1996 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(Y) Unknown | (F) Monitor dbl wall tank space (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6035 | 12000 | Aviation Gas (E) | 07/01/1944 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (K) AST containment |
(D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
603501 | 18077 | Aviation Gas (E) | 01/01/1970 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6036 | 20000 | Leaded Gas (A) | 07/01/1944 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (K) AST containment |
(D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
603601 | 15000 | Aviation Gas (E) | 01/01/1970 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
603701 | 15000 | Aviation Gas (E) | 01/01/1970 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6038 | 12000 | Leaded Gas (A) | 07/01/1948 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (K) AST containment |
(D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
603801 | 12000 | Aviation Gas (E) | 01/01/1970 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6039 | 12000 | Vehicular Diesel (D) | 07/01/1951 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (K) AST containment |
(D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
604001 | 7500 | Vehicular Diesel (D) | 01/01/1952 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6044-1 | 100000 | Aviation Gas (E) | 01/01/1979 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms (U) Field erected tank |
(B) Steel/galvanized metal (D) External protective coating (I) Suction piping system (L) Bulk product system |
(D) SPCC Plan (L) Automatic tank gauging - USTs (M) Manual tank gauging - USTs (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
604401 | 100000 | Aviation Gas (E) | 01/01/1979 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6045-1 | 420000 | Aviation Gas (E) | 01/01/1952 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
604501 | 420000 | Aviation Gas (E) | 01/01/1952 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6046-1 | 820000 | Aviation Gas (E) | 01/01/1952 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (E) Fiberglass (K) AST containment |
(D) External protective coating | (L) Automatic tank gauging - USTs (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
604601 | 820000 | Aviation Gas (E) | 01/01/1952 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6047-1 | 838000 | Aviation Gas (E) | 01/01/1952 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
604701 | 838000 | Aviation Gas (E) | 01/01/1952 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
605301 | 500 | Vehicular Diesel (D) | 01/01/1952 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
649-01 | 2000 | Vehicular Diesel (D) | 01/01/1959 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
649-02 | 2000 | Generator/Pump Diesel (H) | 05/01/1995 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner | (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
702201 | 600 | Generator/Pump Diesel (H) | 01/01/1980 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7032-U | 560 | Generator/Pump Diesel (H) | 01/01/1970 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
713-01 | 1000 | Fuel Oil - Onsite Heat (M) | 01/01/1970 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
748-01 | 2000 | Generator/Pump Diesel (H) | 01/01/1992 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
934-01 | 1000 | Waste Oil (L) | 01/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
934-02 | 1000 | Waste Oil (L) | 05/01/1995 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner | (F) Monitor dbl wall tank space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9447-1 | 4000 | Vehicular Diesel (D) | 01/01/1990 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(G) Pipe trench liner (I) Suction piping system |
(K) Monitor dbl wall pipe space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
944701 | 10000 | Unleaded Gas (B) | 01/01/1990 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(G) Pipe trench liner (I) Suction piping system |
(K) Monitor dbl wall pipe space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9448-1 | 4000 | Vehicular Diesel (D) | 01/01/1990 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(G) Pipe trench liner (I) Suction piping system |
(K) Monitor dbl wall pipe space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
944801 | 10000 | Vehicular Diesel (D) | 01/01/1990 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(G) Pipe trench liner (I) Suction piping system |
(K) Monitor dbl wall pipe space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
944901 | 4000 | Vehicular Diesel (D) | 01/01/1990 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(G) Pipe trench liner (I) Suction piping system |
(K) Monitor dbl wall pipe space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
944901 | 10000 | Vehicular Diesel (D) | 01/01/1990 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(G) Pipe trench liner (I) Suction piping system |
(K) Monitor dbl wall pipe space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
968-10 | 10000 | Unleaded Gas (B) | 01/01/1983 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (F) Double wall (I) Suction piping system |
(L) Automatic tank gauging - USTs (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
968-11 | 10000 | Unleaded Gas (B) | 01/01/1983 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (F) Double wall (I) Suction piping system |
(L) Automatic tank gauging - USTs (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
968-12 | 10000 | Unleaded Gas (B) | 01/01/1983 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(D) SPCC Plan (F) Monitor dbl wall tank space (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
968-13 | 570 | Waste Oil (L) | 01/01/1985 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (W) Built on supports |
(A) Abv, no soil contact | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
971013 | 1000 | Petroleum Additive (W) | 09/01/1997 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
971014 | 2000 | Petroleum Additive (W) | 09/01/1997 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9735-1 | 12200 | Vehicular Diesel (D) | 01/01/1970 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9735-2 | 2700 | Unleaded Gas (B) | 01/01/1980 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (D) External protective coating (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9735-3 | 4000 | Vehicular Diesel (D) | 07/01/1995 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket |
(A) Abv, no soil contact | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9735-4 | 2000 | Unleaded Gas (B) | 06/01/1997 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(D) External protective coating (I) Suction piping system |
(O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
973502 | 1500 | Unleaded Gas (B) | 01/01/1980 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (D) External protective coating (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9738-1 | 1500 | Vehicular Diesel (D) | 04/01/1994 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(M) Manual tank gauging - USTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9738-2 | 1000 | Unleaded Gas (B) | 04/01/1994 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(M) Manual tank gauging - USTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9738-3 | 800 | Waste Oil (L) | 06/01/1995 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve | (A) Abv, no soil contact | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9738-P | 800 | Waste Oil (L) | 06/01/1995 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(M) Manual tank gauging - USTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9738-P | 800 | Waste Oil (L) | 06/01/1995 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(M) Manual tank gauging - USTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
973801 | 1500 | Aviation Gas (E) | 04/01/1994 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (D) External protective coating (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
973802 | 1000 | Aviation Gas (E) | 04/01/1994 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (D) External protective coating (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9762-1 | 600 | Emerg Generator Diesel (G) | 01/01/1980 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (D) External protective coating (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
976201 | 600 | Emerg Generator Diesel (G) | 01/01/1980 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (W) Built on supports |
(A) Abv, no soil contact (D) External protective coating (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
980460 | 1000 | Petroleum Additive (W) | 03/01/1998 | ABOVEGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(6) External piping monitoring (D) SPCC Plan (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
980461 | 2000 | Petroleum Additive (W) | 03/01/1998 | ABOVEGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(6) External piping monitoring (D) SPCC Plan (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
995160 | 560 | Petroleum Additive (W) | 12/01/1999 | ABOVEGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating |
(6) External piping monitoring (D) SPCC Plan (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
995161 | 560 | Petroleum Additive (W) | 12/01/1999 | ABOVEGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating |
(6) External piping monitoring (D) SPCC Plan (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
995162 | 560 | Petroleum Additive (W) | 12/01/1999 | ABOVEGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating |
(6) External piping monitoring (D) SPCC Plan (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
F1 | 2000 | Aviation Gas (E) | 01/01/1988 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(M) Manual tank gauging - USTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
F2 | 10000 | Jet Fuel (F) | 01/01/1988 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(M) Manual tank gauging - USTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
100301 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
101501 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
101601 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
102701 | 1500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
103101 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
111401 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
111501 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1120-3 | 1000 | Generator/Pump Diesel (H) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner | (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
112601 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
112901 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12501 | 1200 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
127901 | 888 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1280-1 | 2000 | Emerg Generator Diesel (G) | ABOVEGROUND | Deleted - Data Error (D) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (O) Tight fill |
(A) Abv, no soil contact | (O) Vapor monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
128701 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
129-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
130701 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
131-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
131-02 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
131101 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
140401 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
140604 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
140801 | 1500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
142001 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
142401 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
143401 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
143801 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
144101 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
144201 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
144501 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
144901 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
145301 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
145501 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
145701 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
146301 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1465-1 | 12000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
147001 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
147601 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
153-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
153201 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
158-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
158-02 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
158201 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
160 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
160201 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
161001 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
161301 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
161401 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
162001 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
172301 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
182-01 | 1000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
203-01 | 3000 | Jet Fuel (F) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
205-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
205-02 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
209-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
214-02 | 1000 | Vehicular Diesel (D) | ABOVEGROUND | Deleted - Data Error (D) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner | (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
219-02 | 1000 | Emerg Generator Diesel (G) | ABOVEGROUND | Deleted - Data Error (D) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner | (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
227-01 | 5000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
227101 | 7500 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
235-02 | 500 | Generator/Pump Diesel (H) | ABOVEGROUND | Deleted - Data Error (D) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner | (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
239-01 | 5000 | Jet Fuel (F) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
239-02 | 2500 | Waste Oil (L) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
239-05 | 5000 | Jet Fuel (F) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
240-01 | 5000 | Jet Fuel (F) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
240-02 | 2000 | Waste Oil (L) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
242-01 | 888 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
242-02 | 888 | Jet Fuel (F) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
250-01 | 888 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
256-0T | 888 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
258-01 | 888 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
260-01 | 500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
263-01 | 1000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
263-02 | 2000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
263-03 | 1000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
263-04 | 8000 | Jet Fuel (F) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
264-01 | 1000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
264-02 | 1000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
266-01 | 500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
280-01 | 888 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
280-02 | 3000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
320-02 | 550 | Jet Fuel (F) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
325-2 | 1000 | Jet Fuel (F) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
42-02 | 250 | Generator/Pump Diesel (H) | ABOVEGROUND | Deleted - Data Error (D) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner | (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
421-01 | 1000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
43 | 600 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(Y) Polyethylene | (D) External protective coating | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
43-02 | 1000 | Generator/Pump Diesel (H) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
432-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
450-01 | 888 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
453-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
456-01 | 9600 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
456-02 | 4800 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
456-03 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
457201 | 500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
470-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
471-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
472-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
501-01 | 888 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
501-02 | 12000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
501201 | 1065 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
501202 | 1065 | New/Lube Oil (O) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
502-01 | 12000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
503-01 | 12000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
504-01 | 12000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
504-02 | 600 | Vehicular Diesel (D) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner | (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5040 | 1000 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
505-01 | 25000 | Aviation Gas (E) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
506-01 | 25000 | Aviation Gas (E) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
507-01 | 25000 | Aviation Gas (E) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
508-01 | 25000 | Aviation Gas (E) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
510-01 | 25000 | Aviation Gas (E) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
511-01 | 25000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
512-01 | 25000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
513-01 | 25000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
515-01 | 25000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
516-01 | 25000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
517-01 | 25000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
518-01 | 25000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
519-01 | 25000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
520-01 | 25000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
523-01 | 888 | Other Non Regulated (Z) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
524-01 | 5000 | Other Non Regulated (Z) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
524-01 | 2000 | Other Non Regulated (Z) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
530-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
531-01 | 100 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
535-01 | 500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
538-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
540-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
540-02 | 3000 | Aviation Gas (E) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
540-02 | 888 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
540-03 | 888 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
546-01 | 2500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
548-01 | 250 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
550-01 | 12000 | Waste Oil (L) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
550-02 | 12000 | Waste Oil (L) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
550-03 | 12000 | Waste Oil (L) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
550-04 | 12000 | Waste Oil (L) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
559-01 | 500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
564101 | 10000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
565-01 | 10000 | Vehicular Diesel (D) | UNDERGROUND | Closed In Place (A) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
566-01 | 10000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
634-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
650-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
653-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
653-02 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
700201 | 1000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
702601 | 500 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
702801 | 1000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
703-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7032-2 | 250 | Generator/Pump Diesel (H) | ABOVEGROUND | Deleted - Data Error (D) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (O) Tight fill |
(Y) Unknown | (F) Monitor dbl wall tank space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
703201 | 560 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
703301 | 700 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
710-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
713-02 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
713-03 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
713-04 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
722-01 | 55 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
727-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
745-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
747-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
748-02 | 250 | Generator/Pump Diesel (H) | ABOVEGROUND | Deleted - Data Error (D) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket |
(A) Abv, no soil contact (D) External protective coating |
(F) Monitor dbl wall tank space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
751-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
753-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
757-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
757-02 | 5000 | Jet Fuel (F) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
761-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
801-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
804-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
804-02 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
808-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
812-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
816-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
820-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
842-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
844-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
854-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
902-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
911-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
914-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
916-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
930-01 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
930-02 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
931001 | 1000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
968-01 | 10000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
968-02 | 10000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
968-03 | 10000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
968-04 | 3000 | Waste Oil (L) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
970601 | 1000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | |||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 07/19/2018 | 07/19/2040 | |||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 11/24/2008 | 11/24/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 11/15/2005 | 12/30/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 10/28/2005 | 10/31/2005 | MINOR OUT-OF-COMPLIANCE | BRAZILE | 11/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/12/2005 | 07/18/2005 | IN-COMPLIANCE | BRAZILE | 11/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes POST HURRICANE DENNIS INSPECTION, NO DAMAGE AT THE TIME OF THE INSPECTION | |||||||||||
CRDE | 11/16/2004 | 11/22/2004 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CONTINUING VIOLATION #169 / 2131 BERM ISSUES | |||||||||||
TCI | 11/16/2004 | 11/22/2004 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 11/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: ABOVEGROUND: IRON; UNDERGROUND: CATHODICALLY PROTECTED IRON & GREEN ENVIRON DW | |||||||||||
TCI | 09/27/2004 | 09/28/2004 | IN-COMPLIANCE | PINKOVSKY | 11/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes POST HURRICANE IVAN INSPECTION | |||||||||||
CRDE | 07/21/2004 | 07/22/2004 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes #169 NO BERM COATING FOR FILL STAND, NOTE: SEPERATE CONCRETE BERMS ARE BEING BUILT FOR THREE 560 GALLON ASTS AND TWO OTHER TANKS WILL BE REPLACED IN NEAR FUTURE. | |||||||||||
TCR | 07/21/2004 | 07/22/2004 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 11/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: DW ENVIRON & STEEL | |||||||||||
CRDE | 02/25/2004 | 03/01/2004 | PINKOVSKY | 11/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes VIOLATION #169 CONTINUING FROM 02/06/2001 INSTALLATION INSPECTION, LOW PRIORITY, TO BE FIXXED WITHIN 3 MONTHS | |||||||||||
TCI | 02/25/2004 | 03/01/2004 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 11/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: ABOVEGROUND: IRON; UNDERGROUND: CATHODICALLY PROTECTED IRON & GREEN ENVIRON DW | |||||||||||
RRBD | 10/02/2003 | 10/06/2003 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/26/2003 | 03/03/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | PINKOVSKY | 11/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes CRDE #169, FILL STAND AREA NEEDS REPAIR T MEET SECONDARY CONTAINMENT REQUIREMENTS, CONTINUING VIOLATION FROM 02/08/01 INSTALLATION INSPECTION | |||||||||||
CRDE | 02/26/2003 | 03/03/2003 | PINKOVSKY | 11/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CRDE #169, FILL STAND AREA DOES NOT MEET REQUIREMENTS FOR SECONDARY CONTAINMENT CONTINUING FROM 02/08/01 | |||||||||||
RRBD | 04/08/2002 | 04/09/2002 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/21/2002 | 02/26/2002 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 11/0 | COMPLIANCE ASSURANCE | |||||
TXI | 02/08/2002 | 02/12/2002 | IN-COMPLIANCE | PINKOVSKY | 1/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLOSURE OF OLD PIPING | |||||||||||
TXI | 11/13/2001 | 11/19/2001 | IN-COMPLIANCE | PINKOVSKY | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLOSURE TANK 411 01 IN PLACE | |||||||||||
RRBD | 05/03/2001 | 05/07/2001 | PINKOVSKY | 1/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/21/2001 | 02/26/2001 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 11/1 | COMPLIANCE ASSURANCE | |||||
TIN | 02/08/2001 | 02/09/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | PINKOVSKY | 11/1 | COMPLIANCE ASSURANCE | |||||
TXI | 12/18/2000 | 12/19/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | PINKOVSKY | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPELINE LEFT AT POL AREA B | |||||||||||
TIN | 03/08/2000 | 03/09/2000 | IN-COMPLIANCE | PINKOVSKY | 3/0 | COMPLIANCE ASSURANCE | |||||
TXI | 03/07/2000 | 03/09/2000 | IN-COMPLIANCE | PINKOVSKY | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 02/15/2000 | 02/29/2000 | IN-COMPLIANCE | PINKOVSKY | 11/1 | COMPLIANCE ASSURANCE | |||||
TIN | 02/03/2000 | 02/14/2000 | IN-COMPLIANCE | PINKOVSKY | 3/0 | COMPLIANCE ASSURANCE | |||||
TIN | 05/03/1999 | 05/06/1999 | IN-COMPLIANCE | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | |||||
LTR | 04/12/1999 | 04/12/1999 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 04/08/1999 | 04/12/1999 | IN-COMPLIANCE | PINKOVSKY | 48/6 | COMPLIANCE ASSURANCE | |||||
TIN | 03/02/1999 | 03/12/1999 | IN-COMPLIANCE | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 02/26/1999 | 03/16/1999 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/16/1999 | 03/16/1999 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 3/46 | COMPLIANCE ASSURANCE | |||||
TXI | 02/04/1999 | 03/17/1999 | IN-COMPLIANCE | PINKOVSKY | 48/3 | COMPLIANCE ASSURANCE | |||||
TIN | 02/03/1999 | 03/17/1999 | IN-COMPLIANCE | PINKOVSKY | 48/3 | COMPLIANCE ASSURANCE | |||||
TIN | 02/02/1999 | 03/17/1999 | IN-COMPLIANCE | PINKOVSKY | 48/3 | COMPLIANCE ASSURANCE | |||||
TXI | 02/02/1999 | 03/17/1999 | IN-COMPLIANCE | PINKOVSKY | 48/3 | COMPLIANCE ASSURANCE | |||||
ATCR | 06/29/1998 | 06/30/1998 | SIGNIFICANT OUT-OF-COMPLIANCE | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 03/24/2025 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 01/14/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 01/14/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Record Document | 01/14/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 10/30/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Site Inspection | 10/29/2024 | Major Out of Compliance | GARTIN_D | 11/0 | Routine Compliance | ||||||
Letter | 02/26/2021 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Issue Document | 02/26/2021 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Site Inspection | 02/24/2021 | In Compliance | PANGAHAS_RL_1 | 11/0 | Routine Compliance | ||||||
Electronic Communication | 02/24/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 09/20/2018 | In Compliance | MERRITT_S | 11/0 | Compliance Assistance | ||||||
Issue Document | 09/20/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 09/20/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 07/30/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 07/30/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 07/27/2018 | Minor Out of Compliance | PANGAHAS_RL_1 | 11/0 | Routine Compliance | ||||||
Phone Conversation | 07/27/2018 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Enforcement Tracking | 12/06/2016 | Closed With Enforcement | GILLMAN_M | Enforcement | |||||||
Site Inspection | 12/02/2016 | In Compliance | BRAZILE_DO_1 | 11/0 | Installation | ||||||
Site Inspection | 12/02/2016 | In Compliance | BRAZILE_DO_1 | 11/0 | Closure | ||||||
Site Inspection | 11/21/2016 | In Compliance | BRAZILE_DO_1 | 11/0 | Routine Compliance | ||||||
Letter | 11/26/2014 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 11/17/2014 | Major Out of Compliance | BRAZILE_DO_1 | 11/0 | Routine Compliance | ||||||
Letter | 09/19/2012 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 09/17/2012 | Major Out of Compliance | BRAZILE_DO_1 | 11/0 | Routine Compliance | ||||||
Letter | 04/09/2012 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 04/04/2012 | Major Out of Compliance | BRAZILE_DO_1 | 2/0 | Installation | ||||||
Letter | 03/16/2012 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 03/09/2012 | Major Out of Compliance | BRAZILE_DO_1 | 11/0 | Routine Compliance | ||||||
Document Management | 08/10/2011 | Complete | GILLMAN_M | Enforcement | |||||||
Letter | 04/18/2011 | Satisfied | RHOADS_KM_1 | Non-Compliance | |||||||
Site Inspection | 04/14/2011 | Minor Out of Compliance | BRAZILE_DO_1 | 11/0 | Routine Compliance | ||||||
Letter | 03/02/2011 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 02/25/2011 | Minor Out of Compliance | BRAZILE_DO_1 | 3/0 | Installation | ||||||
Letter | 02/10/2011 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 02/09/2011 | Minor Out of Compliance | BRAZILE_DO_1 | 3/0 | Closure | ||||||
Enforcement Referral | 06/07/2010 | Accepted | GILLMAN_M | Enforcement | |||||||
Letter | 02/15/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 02/12/2010 | Minor Out of Compliance | BRAZILE_DO_1 | 11/0 | Routine Compliance | ||||||
Letter | 04/22/2009 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Site Inspection | 04/21/2009 | Minor Out of Compliance | BRAZILE_DO_1 | 1/0 | Non-Compliance | ||||||
Letter | 12/18/2008 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Site Inspection | 11/25/2008 | Minor Out of Compliance | BRAZILE_DO_1 | 11/0 | Routine Compliance | ||||||
Record Document | 10/20/2008 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Letter | 01/03/2008 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Site Inspection | 12/24/2007 | Minor Out of Compliance | BRAZILE_DO_1 | 11/0 | Routine Compliance | ||||||
Letter | 06/02/2007 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Site Inspection | 05/29/2007 | Minor Out of Compliance | BRAZILE_DO_1 | 11/0 | Non-Compliance | ||||||
Letter | 11/07/2006 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Site Inspection | 11/07/2006 | Minor Out of Compliance | BRAZILE_DO_1 | 11/0 | Routine Compliance | ||||||
Site Inspection | 06/26/2006 | Minor Out of Compliance | BRAZILE_DO_1 | 11/0 | Non-Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/29/2024 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | The annual operability testing will need to be conducted by a certified contractor for the line leak detector. Submit associated testing for the line leak detector testing to Daniel.Gartin@flhealth.gov. | |||||||
10/29/2024 | 7089 | Minor | 1.11 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have a certified contractor conduct and submit associated integrity testing for the dispenser associated with tank ID 415 to Daniel.Gartin@flhealth.gov. | |||||||
10/29/2024 | 7075 | SNC-B | 3.1 Not repaired component or piping which has not caused a discharge or release. | The damaged boots must be replaced by a certified PSSC License contractor. When the boots are scheduled to be replaced, a work notification form must be submitted to Daniel.Gartin@flhealth.gov. Associated environmental sampling must be conducted to show no discharge has occurred and will be required to be submitted to FDOH as well. | |||||||
10/29/2024 | 7085 | Minor | 3.11 Cathodic protection not inspected, tested and evaluated within six months of installation or repair, and at least yearly. Factory installed cathodic protection not tested, inspected or evaluated every 3 years. | Have a certified Corrosion Professional conduct or direct the associated testing of the impressed cathodic protection testing. Submit associated cathodic protection testing to Daniel.Gartin@flhealth.gov. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
09/12/1997 | INACTIVE | TAYLOR_BS | |||||||||
02/20/1997 | INACTIVE | 10 | TAYLOR_BS | ||||||||
10/31/1996 | INACTIVE | 10 | TAYLOR_BS | ||||||||
09/27/1996 | INACTIVE | 9 | TAYLOR_BS | ||||||||
09/04/1996 | INACTIVE | TAYLOR_BS | |||||||||
05/22/1995 | INACTIVE | TAYLOR_BS | |||||||||
05/19/1995 | INACTIVE | 10 | TAYLOR_BS | ||||||||
05/27/1993 | INACTIVE | 10 | TAYLOR_BS | ||||||||
05/21/1993 | INACTIVE | 10 | TAYLOR_BS | ||||||||
04/23/1993 | INACTIVE | 9 | TAYLOR_BS | ||||||||
10/05/1992 | INACTIVE | 10 | TAYLOR_BS | ||||||||
02/06/1992 | INACTIVE | 10 | TAYLOR_BS | ||||||||
12/04/1991 | INACTIVE | 10 | TAYLOR_BS | ||||||||
11/14/1991 | INACTIVE | 9 | TAYLOR_BS | ||||||||
11/12/1991 | INACTIVE | 9 | TAYLOR_BS | ||||||||