Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District South   Type    Retail Station
 
County Collier   Status    OPEN
 
ID 8518920   Latitude    26° 17' 41.9883
 
Name CIRCLE K #7356
13550 TAMIAMI TRL N
Longitude    81° 48' 5.2315
  NAPLES, FL 34110 LL Method    DPHO
 
Contact GRAHAM BIGGS   LL Status    REVIEWED
 
Phone (919) 774-6700   Status Date    04/22/2003
 
Account Owner Information
 
Name CIRCLE K STORES INC
1100 Situs Ct
Raleigh, NC 27606-5446
Effective Date    05/20/1994
 
Contact IRA LEWIS
 
Phone (423) 400-2480
 
Email ILEWIS@CIRCLEK.COM
  Placard # / Date    697609 - 06/28/2024
No Property Owner Information Found
 
 
Tank Tank Size Content Installed Placement Status
4 11527 Unleaded Gas (B) 02/01/1998 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
5 11527 Unleaded Gas (B) 02/01/1998 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
1 7928 Unleaded Gas (B) 08/01/1978 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(H) Mechanical line leak detector
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
2 7928 Unleaded Gas (B) 08/01/1978 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(H) Mechanical line leak detector
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
3 10152 Unleaded Gas (B) 04/01/1986 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(H) Mechanical line leak detector
(S) Statistical Inventory Reconcile
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   12/01/2020 12/01/2021 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   12/01/2019 12/01/2020 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   12/01/2018 12/01/2019 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2017 12/01/2018 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2016 12/01/2017 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2015 12/01/2016 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2014 12/01/2015 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2013 12/01/2014 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2011 12/01/2012 CHUBB
INSURANCE   12/18/2010 12/17/2011 CHUBB
INSURANCE   12/18/2009 12/17/2010 CHUBB
INSURANCE   12/17/2008 12/17/2009 AMERICAN INTERNATIONAL SPECIALTY LINES
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
RRBD 01/24/2006 01/27/2006 SNYDERBURN_P 0/0 DISCHARGE PROJECT
 
 Completion Notes THE ANNUALAR ALARM WAS TRIPPING. THE BRINE SOLUTION WAS ADJUSTED AND THE VEEDER ROOTE RESET BY JMP SOLUTIONS, WHICH CLOSES THE INF.
 
IRFR 01/03/2006 01/06/2006 SNYDERBURN_P 0/0 DISCHARGE PROJECT
 
 Completion Notes LOW LIQUID ANNULAR ALARM. PRESUMABLY HYDROSTATIC SENSOR WITH BRINE FILLED INTERSTICE. FACILITY HIRED CONTRACTOR TO INVESTIGATE.
 
RRBD 08/15/2005 08/18/2005 OWEN_JA 0/0 DISCHARGE PROJECT
 
 Completion Notes PASSED TIGHTNESS & VACUUM TEST JMP REMOVED H20 FROM INTERSTICE AND REPLACED CAPS. INF FROM 8/1/05
 
IRFR 08/01/2005 08/18/2005 OWEN_JA 0/0 DISCHARGE PROJECT
 
 Completion Notes L2 PREMIUM ANNULAR. INVESTIGATING CAUSE.
 
IRFR 08/01/2005 08/01/2005 SNYDERBURN_P 0/0 DISCHARGE PROJECT
 
 Completion Notes L2 ANNULAR SPACE ALARM (PREMIUM ANNULAR). TESTING SCHEDULED.
 
RRBD 07/06/2005 08/18/2005 OWEN_JA 0/0 DISCHARGE PROJECT
 
 Completion Notes REPAIRED OUTERWALL CAPS. PASSED TIGHTNESS TEST. TESTED BY VALLEY TANK TESTING FOR 6/27/05 INF.
 
RRBD 07/06/2005 08/18/2005 OWEN_JA 0/0 DISCHARGE PROJECT
 
 Completion Notes PASSED TIGHTNESS TEST. SUBMITTED BY VALLEY TANK TESTING FOR INF 5/20/05
 
IRFR 06/27/2005 08/18/2005 OWEN_JA 0/0 DISCHARGE PROJECT
 
 Completion Notes L2 PREMIUM ANNULAR ALARM. INVESTIGATING.
 
IRFR 05/20/2005 06/06/2005 SNYDERBURN_P 0/0 DISCHARGE PROJECT
 
 Completion Notes REGULAR UNLEADED HIGH LIQUID ALARM. INVESTIGATING.
 
TCI 04/26/2005 04/29/2005 IN-COMPLIANCE KOLANDA 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes NO VIOLATIONS
 
DSNR 12/29/2004 12/31/2004 KOLANDA 0/2 DISCHARGE PROJECT
 
 Completion Notes ADJUSTED BRINE LEVEL
 
IRFR 11/30/2004 12/31/2004 KOLANDA 0/2 DISCHARGE PROJECT
 
 Completion Notes ANNULAR ALARM IN PREMIUM TANK
 
DSNR 10/28/2004 11/12/2004 KOLANDA 0/2 DISCHARGE PROJECT
 
 Completion Notes ADJUSTED BRINE LEVEL IN ANNULAR SPACE
 
IRFR 10/26/2004 11/12/2004 KOLANDA 0/2 DISCHARGE PROJECT
 
 Completion Notes RUL ANNULAR SENSOR IN ALARM
 
DSNR 08/11/2004 02/03/2005 KOLANDA 0/2 DISCHARGE PROJECT
 
 Completion Notes ADJUSTED BRINE LEVEL IN INTERSTITIAL SPACE
 
IRFR 06/28/2004 02/03/2005 KOLANDA 0/2 DISCHARGE PROJECT
 
 Completion Notes LIQUID LEVEL ALARM ON PREMIUM INTERSTITIAL SPACE
 
SRVC 05/12/2004 10/18/2004 SNYDERBURN_P 0/0 DISCHARGE PROJECT
 
 Completion Notes LETTER FROM CONOCO-PHILLIPS DETAILING BUYOUT OF CIRCLE K STORES AND RE-REPORTS OF DISCHARGES.
 
IRFR 05/11/2004 05/14/2004 KOLANDA 0/2 DISCHARGE PROJECT
 
 Completion Notes PHASE II AUDIT INDICATES CONTAMINATION
 
DRFR 05/11/2004 10/18/2004 SNYDERBURN_P 0/0 DISCHARGE PROJECT
 
 Completion Notes DRF RECEIVED, APPEARS TO BE RE-REPORT.
 
LTR 04/23/2004 04/26/2004 KOLANDA 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes COVER LETTER FOR TXI & TIN SPILL CONTAINMENT
 
CWOE 04/13/2004 04/16/2004 KOLANDA 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes CLOSED #144
 
TIN 04/13/2004 04/16/2004 IN-COMPLIANCE KOLANDA 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes INSTALLED POMECO SPILL CONTAINMENT EQ-224
 
TXI 04/13/2004 04/16/2004 IN-COMPLIANCE KOLANDA 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes CLOSED DAMAGED SPILL BUCKET
 
RRBD 03/24/2004 03/29/2004 KOLANDA 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes REC'D ANNUAL SENSOR TESTING...CLOSED #157
 
RRBD 03/08/2004 03/12/2004 KOLANDA 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes #157 REMAINS OPEN...NO INTERSTIAL SENSOR OPERABILITY RESULTS
 
NCLI 03/01/2004 03/02/2004 KOLANDA 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes #157 & #144
 
TCI 02/23/2004 02/27/2004 MINOR OUT-OF-COMPLIANCE KOLANDA 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: DW FIBERGLASS
 
DSNR 08/28/2003 11/03/2003 KOLANDA 0/2 DISCHARGE PROJECT
 
 Completion Notes RESET PROBE
 
IRFR 07/28/2003 07/29/2003 HOGAN_S 0/0 DISCHARGE PROJECT
 
 Completion Notes HIGH LIQUID ALARM
 
RRBD 03/06/2003 06/12/2003 HOGAN_S 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes SENSORS PASSED. VAPOR RECOVERY SUMP LID REPAIRED. DOUBLE WALLED PIPIING INTERSTICE WAS EXPOSED.
 
CWOE 03/06/2003 06/12/2003 HOGAN_S 0/0 COMPLIANCE ASSURANCE
 
NCLI 02/11/2003 02/26/2003 HOGAN_S 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes NCLI FOR TCI DATED 2/10/03
 
TCI 02/10/2003 02/12/2003 MINOR OUT-OF-COMPLIANCE HOGAN_S 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes OPERABILITY TEST DUE ON TANK INTERSTICE SENSORS. PUL PIPING INTERSTICE NEEDS TO BE UNSEALED. RUL VAPOR RECOVERY SUMP LID IS DAMAGED.
 
DSNR 10/25/2002 10/28/2002 HOGAN_S 0/0 DISCHARGE PROJECT
 
 Completion Notes INF DATED 9/13/02 RESOLVED.
 
IRFR 09/13/2002 09/16/2002 HOGAN_S 0/0 DISCHARGE PROJECT
 
 Completion Notes UNLEADED ANNULAR ALARM
 
DSNR 07/01/2002 07/02/2002 HOGAN_S 0/0 DISCHARGE PROJECT
 
 Completion Notes INF DATED 6/19/02 INVESTIGATED AND ALARM RESOLVED.
 
IRFR 06/19/2002 06/19/2002 HOGAN_S 0/0 DISCHARGE PROJECT
 
 Completion Notes UNLEADED ANNULAR HIGH LEVEL ALARM
 
DSNR 05/15/2002 05/20/2002 HOGAN_S 0/0 DISCHARGE PROJECT
 
 Completion Notes ANNULAR ALARM REPAIRED. NO DISCHARGE.
 
IRFR 04/26/2002 04/30/2002 HOGAN_S 0/0 DISCHARGE PROJECT
 
 Completion Notes UNLEADED ANNULAR ALARM. SERVICE TO INVESTIGATE.
 
LTR 03/28/2002 04/01/2002 HOGAN_S 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes LTR FOR TCI DATED 3/25/02
 
TCI 03/25/2002 03/26/2002 IN-COMPLIANCE HOGAN_S 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes IN COMPLIANCE
 
DSNR 09/17/2001 09/26/2001 HOGAN_S 0/0 DISCHARGE PROJECT
 
 Completion Notes WORK ORDER LOG HISTORY FROM TOSCO STATES ALARM WAS INVESTIGATED AND RESOLVED.
 
IRFR 08/02/2001 08/03/2001 HOGAN_S 0/0 DISCHARGE PROJECT
 
 Completion Notes UNL ANNULAR ALARM
 
LTR 05/07/2001 05/08/2001 HOGAN_S 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes COVER LETTER
 
TCI 05/03/2001 05/04/2001 IN-COMPLIANCE HOGAN_S 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes IN COMPLIANCE
 
TCR 01/21/2000 01/24/2000 IN-COMPLIANCE SILLERY_W 0/2 COMPLIANCE ASSURANCE
 
TCI 10/20/1999 10/29/1999 SIGNIFICANT OUT-OF-COMPLIANCE SILLERY_W 0/2 COMPLIANCE ASSURANCE
 
UTCI 11/20/1998 11/25/1998 MINOR OUT-OF-COMPLIANCE COMPLIANCE ASSURANCE
 
 Completion Notes ROUTINE INSPECTION
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Enforcement Referral 02/29/2024 Accepted STANDIFORD_JA Enforcement
 
Electronic Communication 12/04/2023 Satisfied STANDIFORD_JA Compliance Assistance
 
Letter 08/04/2023 Satisfied STANDIFORD_JA Compliance Assistance
 
Site Inspection 08/01/2023 Major Out of Compliance STANDIFORD_JA 0/2 Routine Compliance
 
Electronic Communication 04/20/2022 Satisfied HERNANDEZ_N_5 Incident
 
Incident 04/20/2022 Has not led to Discharge HERNANDEZ_N_5 Incident
 
Letter 04/20/2022 Satisfied HERNANDEZ_N_5 Closure
 
TCAR 04/20/2022 Satisfied HERNANDEZ_N_5 Closure
 
Document Management 03/25/2022 Satisfied HERNANDEZ_N_5 Incident
 
Electronic Communication 03/25/2022 Satisfied HERNANDEZ_N_5 Incident
 
Letter 10/14/2021 Satisfied HERNANDEZ_N_5 Compliance Assistance
 
Electronic Communication 10/11/2021 Satisfied HERNANDEZ_N_5 Compliance Assistance
 
Electronic Communication 09/13/2021 Satisfied HERNANDEZ_N_5 Compliance Assistance
 
Electronic Communication 08/04/2021 Satisfied HERNANDEZ_N_5 Routine Compliance
 
Letter 08/04/2021 Satisfied HERNANDEZ_N_5 Compliance Assistance
 
Site Inspection 08/04/2021 Minor Out of Compliance HERNANDEZ_N_5 0/2 Routine Compliance
 
Letter 01/10/2020 Satisfied BATES_TD_1 Compliance Assistance
 
Letter 12/19/2019 Satisfied BATES_TD_1 Compliance Assistance
 
Site Inspection 12/19/2019 Minor Out of Compliance BATES_TD_1 0/2 Routine Compliance
 
Incident 02/15/2019 Has not led to Discharge SNYDERBURN_PJ_2 Incident
 
Document Management 02/15/2019 Satisfied SNYDERBURN_PJ_2 Incident
 
Record Document 10/27/2017 Satisfied STANDIFORD_JA_2 Routine Compliance
 
Issue Document 10/27/2017 Satisfied STANDIFORD_JA_2 Routine Compliance
 
Letter 08/30/2017 Satisfied STANDIFORD_JA_2 Compliance Assistance
 
Site Inspection 08/29/2017 Minor Out of Compliance STANDIFORD_JA_2 0/2 Routine Compliance
 
Letter 12/30/2015 Satisfied STANDIFORD_JA_2 Non-Compliance
 
Site Inspection 11/25/2015 Minor Out of Compliance STANDIFORD_JA_2 0/2 Routine Compliance
 
Record Document 11/06/2015 Satisfied STANDIFORD_JA_2 Non-Compliance
 
Site Inspection 08/31/2015 Minor Out of Compliance STANDIFORD_JA_2 0/2 Non-Compliance
 
Letter 06/25/2015 Satisfied SNYDERBURN_PJ_2 Non-Compliance
 
Site Inspection 06/23/2015 Minor Out of Compliance STANDIFORD_J_1 0/2 Non-Compliance
 
Site Inspection 02/10/2014 Minor Out of Compliance SPARKS_JD_1 0/2 Routine Compliance
 
Letter 02/10/2014 Satisfied SPARKS_JD_1 Non-Compliance
 
Emergency Preparedness Information 08/06/2013 Satisfied SPARKS_JD_1 Routine Compliance
 
Incident 11/01/2012 Has not led to Discharge SNYDERBURN_PJ_2 Incident
 
Site Inspection 11/01/2012 In Compliance SNYDERBURN_PJ_2 0/1 Discharge
 
Site Inspection 11/01/2012 In Compliance SNYDERBURN_PJ_2 0/1 Installation
 
Site Inspection 11/01/2012 In Compliance SNYDERBURN_PJ_2 0/1 Closure
 
Discharge Reporting 11/01/2012 Satisfied SNYDERBURN_PJ_2 Discharge
 
Emergency Preparedness Information 08/25/2012 Satisfied SPARKS_JD_1 Routine Compliance
 
Site Inspection 06/25/2012 Minor Out of Compliance SNYDERBURN_PJ_2 0/2 Routine Compliance
 
Letter 06/25/2012 Satisfied SNYDERBURN_PJ_2 Non-Compliance
 
Record Document 05/13/2011 Satisfied SNYDERBURN_PJ_2 Non-Compliance
 
Record Document 04/25/2011 Satisfied SNYDERBURN_PJ_2 Non-Compliance
 
Emergency Preparedness Information 04/25/2011 Satisfied SNYDERBURN_PJ_2 Routine Compliance
 
Site Inspection 04/25/2011 Major Out of Compliance SNYDERBURN_PJ_2 0/2 Routine Compliance
 
Letter 04/25/2011 Satisfied SNYDERBURN_PJ_2 Non-Compliance
 
Incident 11/29/2010 Has not led to Discharge SNYDERBURN_PJ_2 Incident
 
Document Management 11/29/2010 Complete SNYDERBURN_PJ_2 Incident
 
Document Management 11/10/2010 Complete SNYDERBURN_PJ_2 Incident
 
Document Management 10/29/2010 Complete SNYDERBURN_PJ_2 Incident
 
Incident 10/29/2010 Has not led to Discharge SNYDERBURN_PJ_2 Incident
 
Document Management 10/25/2010 Complete SNYDERBURN_PJ_2 Incident
 
Document Management 09/14/2010 Complete NOVAK_KM_1 Incident
 
Document Management 09/13/2010 Complete SNYDERBURN_PJ_2 Incident
 
Incident 09/13/2010 Has not led to Discharge NOVAK_KM_1 Incident
 
Record Document 05/12/2010 Satisfied NOVAK_KM_1 Non-Compliance
 
Record Document 04/09/2010 Satisfied NOVAK_KM_1 Non-Compliance
 
Emergency Preparedness Information 04/02/2010 Satisfied NOVAK_KM_1 Routine Compliance
 
Site Inspection 04/02/2010 Major Out of Compliance NOVAK_KM_1 0/2 Routine Compliance
 
Letter 04/02/2010 Satisfied NOVAK_KM_1 Non-Compliance
 
Record Document 04/24/2009 Satisfied NOVAK_KM_1 Non-Compliance
 
Site Inspection 04/01/2009 Minor Out of Compliance NOVAK_KM_1 0/2 Routine Compliance
 
Emergency Preparedness Information 04/01/2009 Satisfied NOVAK_KM_1 Routine Compliance
 
Letter 04/01/2009 Satisfied NOVAK_KM_1 Non-Compliance
 
Record Document 07/21/2008 Satisfied SNYDERBURN_PJ_2 Non-Compliance
 
Letter 05/19/2008 Satisfied POTTS_CR Non-Compliance
 
Site Inspection 05/19/2008 Minor Out of Compliance POTTS_CR 0/2 Routine Compliance
 
Emergency Preparedness Information 04/04/2008 Satisfied POTTS_CR Routine Compliance
 
Complaint 12/10/2007 Satisfied SNYDERBURN_PJ_2 Complaint
 
Record Document 06/21/2007 Satisfied POTTS_CR Non-Compliance
 
Letter 06/14/2007 Satisfied POTTS_CR Non-Compliance
 
Site Inspection 05/30/2007 Minor Out of Compliance POTTS_CR 0/2 Routine Compliance
 
Emergency Preparedness Information 02/12/2007 Satisfied SNYDERBURN_PJ_2 Routine Compliance
 
Emergency Preparedness Information 09/29/2006 Satisfied SNYDERBURN_PJ_2 Routine Compliance
 
Record Document 08/07/2006 Satisfied SNYDERBURN_PJ_2 Discharge
 
Record Document 07/17/2006 Satisfied OWEN_JA Non-Compliance
 
Record Document 07/17/2006 Satisfied OWEN_JA Discharge
 
Record Document 07/17/2006 Satisfied OWEN_JA Discharge
 
Site Inspection 04/04/2006 Minor Out of Compliance OWEN_JA 0/2 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
08/01/2023 6030 SNC-B 4.2 Any component(s) of storage tank system not installed according to reference standards. Within 90 days of the inspection date provide photos documenting the shear valve anchor bolts have been tightened via email to the inspector. It is recommended that 7-G Environmental Compliance staff be provided socket/wrench sets to ensure these components are inspected monthly and secured tightly at all times.
 
08/01/2023 7075 SNC-B 3.1 Not repaired component or piping which has not caused a discharge or release. Within 90 days of the inspection date, please have the STP's and associated metal components sanded/painted. Please also provide photos via email to the inspector documenting the corrosion has been corrected within the same timeframe.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
01/18/1993   INACTIVE 10 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE PARRINO_AG_1
 
11/22/1988   INACTIVE 10 EARLY DETECTION INCENTIVE-ELIGIBLE PARRINO_AG_1