Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District South   Type    Bulk Storage Facility
 
County Lee   Status    OPEN
 
ID 8519324   Latitude    26° 37' 19.9138
 
Name JACOBUS ENERGY - FT MYERS
2650 HANSON ST
Longitude    81° 51' 30.7298
  FORT MYERS, FL 33901-7410 LL Method    DPHO
 
Contact CHARLIE JACOBUS   LL Status    REVIEWED
 
Phone (414) 359-0554   Status Date    10/02/2003
 
Account Owner Information
 
Name JACOBUS ENERGY LLC
11414 W PARK PL, SU#300
MILWAUKEE, WI 53224-2532
Effective Date    03/12/2021
 
Contact MEG HAMELL / EUGENE T JACOBUS
 
Phone (414) 577-0227
 
Email MEGHAMELL@JACOBUSENERGY.COM
  Placard # / Date    691801 - 06/19/2024
Property Owner Information
 
Name JACOBUS ENERGY LLC
11414 W PARK PL, SU#300
MILWAUKEE, WI 53224-2532
Effective Date    03/12/2021
 
Contact MEG HAMELL / EUGENE T JACOBUS
 
Phone (414) 577-0227
 
Email MEGHAMELL@JACOBUSENERGY.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
10 12000 Vehicular Diesel (D) 06/01/2024 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
11 12000 Vehicular Diesel (D) 06/01/2024 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
12 27200 Ethanol E10 (8) 06/01/2024 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
13 27200 Vehicular Diesel (D) 06/01/2024 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
14 27200 Vehicular Diesel (D) 06/01/2024 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
15 27200 Vehicular Diesel (D) 06/01/2024 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
1 24000 Unleaded Gas (B) 12/01/1960 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(4) Visual inspect dispenser liners
(D) SPCC Plan
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
2 18000 Vehicular Diesel (D) 12/01/1960 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(4) Visual inspect dispenser liners
(D) SPCC Plan
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
3 18000 Vehicular Diesel (D) 12/01/1960 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(4) Visual inspect dispenser liners
(D) SPCC Plan
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
4 18000 Vehicular Diesel (D) 12/01/1960 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(4) Visual inspect dispenser liners
(D) SPCC Plan
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
5 16000 Vehicular Diesel (D) 04/01/1970 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(4) Visual inspect dispenser liners
(D) SPCC Plan
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
6 3000 Vehicular Diesel (D) 10/01/1975 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
7 3000 Vehicular Diesel (D) 10/01/1975 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
8 3000 Vehicular Diesel (D) 10/01/1975 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
9 3000 Vehicular Diesel (D) 10/01/1975 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   06/01/2023 06/01/2026 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   06/01/2020 06/01/2023 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   06/01/2017 06/01/2020 NAVIGATORS SPECIALTY INS CO
INSURANCE   06/01/2014 06/01/2017 NAVIGATORS SPECIALTY INS CO
INSURANCE   06/01/2014 06/01/2015 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   06/01/2013 06/01/2014 NAVIGATORS SPECIALTY INS CO
INSURANCE   06/01/2011 06/01/2012 INDIAN HARBOR
INSURANCE   06/01/2010 06/01/2011 INDIAN HARBOR
INSURANCE   06/01/2008 06/01/2011 INDIAN HARBOR
INSURANCE   12/06/1991 07/10/1996 FPLIPA
INSURANCE   10/06/1989 12/06/1994 FPLIPA
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
REX 09/30/2005 01/26/2006 JOHNSON_S 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes 30 EXTENSION TO RESEAL CONCRETE CONTAINMENT TIL 10/31/05
 
IRFR 07/27/2005 08/04/2005 S. JOHNSON 0/0 DISCHARGE PROJECT
 
 Completion Notes COMPANY EMPLOYEE FAILED TO INSTALL O-RING BETWEEN FILTER AND FILTER HOUSING CAUSING 20-30 GALLONS OF DIESEL TO LEAK OUT WHEN DISPENSER #7 WAS TURNED ON. FUEL SPILL WAS CONFINED TO PAVEMENT AND CLEANED UP BY COMPANY EMPLOYEE.
 
SV 07/26/2005 07/29/2005 S. JOHNSON/J. SAIYA 0/0 DISCHARGE PROJECT
 
 Completion Notes APPROX. 20-30 GALLONS OF DIESEL WAS RELEASE ONTO PAVEMENT AT QUICKWAY FUEL DUE TO O-RING ON FILTER AT DISPENSER #7 M NOT BEING INSTALLED. ON-SITE CREWS SECURED SPILL AND CLEANED UP. DISCHARGE OCCURED APPROXIAMATELY 40YARDS FROM THE ROAD. CURB AROUND
 
NCLI 04/29/2005 04/29/2005 S. JOHNSON 5/0 COMPLIANCE ASSURANCE
 
TCI 04/28/2005 04/29/2005 MINOR OUT-OF-COMPLIANCE S. JOHNSON 5/0 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING - ABOVEGROUND STEEL/UNDERGROUND SW FIBERGLASS RDRL - MONTHLY VISUALS #2120: REMOVE WATER, ETC FROM LINERS #2131: SECONDARY CONTAINMENT NEEDS COATING
 
CWOE 07/15/2004 07/16/2004 DEMACK,P 0/0 COMPLIANCE ASSURANCE
 
TCR 07/15/2004 07/16/2004 IN-COMPLIANCE DEMACK,P 5/0 COMPLIANCE ASSURANCE
 
 Completion Notes VIOLATIONS RESOLVED. FACILITY NEEDS TO MAINTAIN CRACKS/HAIR LINE CRACKING WITHIN THE CONTAINMENT AREA AS NEEDED.
 
NCLI 05/04/2004 05/04/2004 DEMACK,P 0/0 COMPLIANCE ASSURANCE
 
TCI 04/21/2004 04/27/2004 SIGNIFICANT OUT-OF-COMPLIANCE DEMACK,P 5/0 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING RDRL=MONTHLY VISUAL INSPECTIONS
 
TCR 09/23/2003 09/25/2003 IN-COMPLIANCE DEMACK_P 5/0 COMPLIANCE ASSURANCE
 
TCR 09/12/2003 09/17/2003 MINOR OUT-OF-COMPLIANCE P. DEMACK 5/0 COMPLIANCE ASSURANCE
 
 Completion Notes FAILURE TO RESOLVE VIOLATION 155. VIOLATION 169 AND 86 HAVE BEEN RESOLVED. NEW VIOLATION ADDED #127
 
TCI 05/08/2003 05/29/2003 SIGNIFICANT OUT-OF-COMPLIANCE S. JOHNSON/P. DEMACK 5/0 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING-STEEL/GALVANIZED RDRL-MONTHLY VISUALS OF TANKS DISPENSER LINERS AND UNDERGROUND DW PIPING
 
TCI 05/21/2002 06/14/2002 IN-COMPLIANCE DEMACK,P 5/0 COMPLIANCE ASSURANCE
 
TIN 02/15/2002 06/14/2002 IN-COMPLIANCE JOHNSON/DEMACK 5/0 COMPLIANCE ASSURANCE
 
 Completion Notes FACILITY INSTALLED DW UNDERGROUND PIPING AND NEW DISPENSERS.
 
TCI 06/19/2001 06/21/2001 SIGNIFICANT OUT-OF-COMPLIANCE JOHNSON 5/0 COMPLIANCE ASSURANCE
 
TIN 10/25/2000 10/27/2000 IN-COMPLIANCE HOENE 5/0 COMPLIANCE ASSURANCE
 
 Completion Notes SERVICE STATION REPAIR INSTALLED 5 DISPENSER LINERS.
 
TCI 06/28/2000 07/10/2000 IN-COMPLIANCE JOHNSON 5/0 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 05/07/2025 Satisfied KLEINMANN_K_1 Discharge
 
Electronic Communication 05/06/2025 Satisfied KLEINMANN_K_1 Discharge
 
Electronic Communication 03/13/2025 Satisfied KLEINMANN_K_1 Component Closure
 
Electronic Communication 03/07/2025 Satisfied KLEINMANN_K_1 Component Closure
 
Electronic Communication 03/07/2025 Satisfied KLEINMANN_K_1 Component Closure
 
Enforcement Referral 11/12/2024 Accepted KLEINMANN_K_1 Enforcement
 
Letter 06/12/2024 Satisfied KLEINMANN_K_1 Compliance Assistance
 
Site Inspection 06/12/2024 Major Out of Compliance KLEINMANN_K_1 5/0 Component Closure
 
Electronic Communication 02/15/2023 Satisfied PARKS_J_4 Routine Compliance
 
Letter 02/15/2023 Satisfied PARKS_J_4 Routine Compliance
 
Site Inspection 02/15/2023 In Compliance PARKS_J_4 5/0 Routine Compliance
 
Site Inspection 02/28/2020 In Compliance KLEINMANN_K_1 5/0 Routine Compliance
 
Electronic Communication 02/28/2020 Satisfied KLEINMANN_K_1 Routine Compliance
 
Site Inspection 11/29/2017 In Compliance ZIMMERMAN_CA_1 5/0 Routine Compliance
 
Site Inspection 11/14/2014 In Compliance JOHNSON_SG_1 5/0 Routine Compliance
 
Site Inspection 05/29/2014 Minor Out of Compliance JOHNSON_SG_1 5/0 Routine Compliance
 
Letter 05/29/2014 Satisfied JOHNSON_SG_1 Non-Compliance
 
Site Inspection 05/16/2012 In Compliance JOHNSON_SG_1 5/0 Routine Compliance
 
Site Inspection 05/09/2011 In Compliance ZIMMERMAN_CA_1 5/0 Routine Compliance
 
Letter 06/30/2010 Satisfied ZIMMERMAN_CA_1 Non-Compliance
 
Site Inspection 06/30/2010 Major Out of Compliance ZIMMERMAN_CA_1 5/0 Routine Compliance
 
Site Inspection 04/27/2009 In Compliance ZIMMERMAN_CA_1 5/0 Routine Compliance
 
Site Inspection 08/28/2008 In Compliance ZIMMERMAN_CA_1 5/0 Non-Compliance
 
Letter 05/13/2008 Satisfied JOHNSON_SG_1 Non-Compliance
 
Site Inspection 05/06/2008 Major Out of Compliance JOHNSON_SG_1 5/0 Routine Compliance
 
Site Inspection 06/20/2007 In Compliance ZIMMERMAN_CA_1 5/0 Routine Compliance
 
Letter 06/11/2007 Satisfied JOHNSON_SG_1 Non-Compliance
 
Emergency Preparedness Information 02/13/2007 Satisfied JOHNSON_SG_1 Routine Compliance
 
Site Inspection 10/09/2006 In Compliance JOHNSON_SG_1 5/0 Non-Compliance
 
Site Inspection 04/27/2006 Major Out of Compliance JOHNSON_SG_1 5/0 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
06/12/2024 7102 SNC-B 3.13 Storage tank system closure requirements not met. Submit closure documents including Certified Contractor information, tank disposal documentation, tank testing, and soil testing results within 5 days.
 
06/12/2024 7116 Minor 3.9 Incident notification not submitted within 72-hours. Notification of incidents. Within 72 hours, or close of the county’s next business day, the county shall be notified in writing or electronic format of any release into a secondary containment system of a mineral acid in excess of 110 gallons, or the reportable quantity in effect on July 1, 1991, under the Comprehensive Environmental Response Compensation and Liability Act of 1980, whichever is greater.
 
06/12/2024 7014 SNC-B 3.5 Removal of regulated substance from a release not initiated within three days and completed within 30 days of discovery. The removal of any release of regulated substances into secondary containment shall be initiated within three days of discovery, and completed within 30 days of discovery.
 
06/12/2024 7105 Minor 1.14 Closure Report not submitted. Closure report and sampling results need to be submitted within 5 days.
 
06/12/2024 7002 Minor 1.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. Registration needs to updated within 10 days.
 
08/16/2023 7016 SNC-B 3.6 Discharge not reported with 24-hours, or by next business day. Upon discovery of a discharge, the owner or operator shall report the discharge to the county on a DRF within 24 hours or before the close of the county’s next business day. If, however, this discovery is thought to be a previously reported discharge, the owner or operator will have 30 days to investigate and submit supporting documentation or a DRF.
 
01/10/2023 7005 Minor 1.5 Notification of installation, closure, or change in service status not received in required timeframes. A Closure Integrity Evaluation Report Form for ASTs 62-762.901(7), (Closure Integrity Report), effective date, October 2019, hereby adopted and incorporated by reference, as prepared in accordance with paragraph 62-762.801(3)(a) or 62-762.802(4)(a), F.A.C., must be provided to the county with the notification of closure. Notification shall be received by the county in writing or electronic format between 30 and 45 days before the initiation of the work related to the change in service status or closure unless the county agrees to a shorter time period
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
01/10/2023   INACTIVE
 
03/20/1992   INACTIVE 26 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE
 
02/03/1992   INACTIVE 26 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE FRIX_PG_1
 
08/13/1990   ACTIVE 26 FRIX_PG_1
 
03/14/1990   INACTIVE 26 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE
 
06/04/1986   INACTIVE 26 EARLY DETECTION INCENTIVE-ELIGIBLE