![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Escambia | Status | OPEN | ||||||||
ID | 8520192 | Latitude | 30° 29' 15.0212 | ||||||||
Name |
CIRCLE K #4457 2825 LANGLEY AVE |
Longitude | 87° 11' 15.2036 | ||||||||
PENSACOLA, FL 32504 | LL Method | DPHO | |||||||||
Contact | HEATHER GILMORE / ONSITE MGR) | LL Status | REVIEWED | ||||||||
Phone | (850) 549-2879 | Status Date | 02/12/2015 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 25 W CEDAR ST STE M Pensacola, FL 32502 |
Effective Date | 01/13/2010 | ||||||||
Contact | IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON | ||||||||||
Phone | (850) 454-1070 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 697402 - 06/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CIRCLE K STORES INC 25 W CEDAR ST STE M Pensacola, FL 32502 |
Effective Date | 01/13/2010 | ||||||||
Contact | IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON | ||||||||||
Phone | (850) 454-1070 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 15000 | Unleaded Gas (B) | 05/01/2019 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Vehicular Diesel (D) | 05/01/2019 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 04/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 04/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 04/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
GUARANTEE | 04/30/2024 | 08/28/2025 | |||||||||
GUARANTEE | 04/24/2022 | 08/21/2023 | |||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/31/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2013 | 12/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2013 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/17/2009 | 12/01/2011 | CHUBB | ||||||||
INSURANCE | 12/17/2008 | 12/17/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 11/22/2005 | 11/22/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/02/2005 | 11/03/2005 | MINOR OUT-OF-COMPLIANCE | ARTHUR B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 01/24/2005 | 01/26/2005 | IN-COMPLIANCE | ARTHUR B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 11/02/2004 | 11/05/2004 | IN-COMPLIANCE | JOSEPH D. THAYER | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes REGULAR SUBMERSIBLE PUMP CONTAINMENT PASSED HYDROSTATIC TEST. ONLY CONTAINMENT TESTED. | |||||||||||
RRBD | 11/10/2003 | 11/17/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 10/01/2003 | 11/05/2003 | MINOR OUT-OF-COMPLIANCE | A. B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/20/2002 | 12/04/2002 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 11/28/2001 | 12/12/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/15/2001 | 12/12/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 04/25/2001 | 05/01/2001 | IN-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
TCR | 03/08/2001 | 03/20/2001 | MINOR OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 12/15/2000 | 01/02/2001 | MINOR OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/01/2000 | 02/09/2000 | STEVENSON_JS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/20/1999 | 12/22/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/19/1999 | 11/15/1999 | STEVENSON_JS | 0/0 | COMPLIANCE ASSURANCE | ||||||
UTCI | 12/07/1998 | 12/28/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 03/12/2025 | Satisfied | ELLIOTT_EV_1 | Component Installation | |||||||
Site Inspection | 03/07/2025 | Major Out of Compliance | ELLIOTT_EV_1 | 0/2 | Component Installation | ||||||
Document Management | 10/29/2024 | Satisfied | ELLIOTT_EV_1 | Incident | |||||||
Enforcement Referral | 10/28/2024 | Accepted | ELLIOTT_EV_1 | Enforcement | |||||||
Record Document | 10/23/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Letter | 10/21/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Record Document | 10/14/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Record Document | 09/20/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Letter | 08/02/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Site Inspection | 08/02/2024 | Major Out of Compliance | ELLIOTT_EV_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 08/01/2024 | Satisfied | ELLIOTT_EV_1 | Routine Compliance | |||||||
Meeting | 08/01/2024 | Satisfied | ELLIOTT_EV_1 | Routine Compliance | |||||||
Letter | 12/16/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 12/12/2022 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Record Document | 11/07/2022 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Record Document | 10/20/2022 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Letter | 10/03/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 10/03/2022 | Satisfied | ELLIOTT_EV_1 | Routine Compliance | |||||||
Site Inspection | 09/30/2022 | Major Out of Compliance | ELLIOTT_EV_1 | 2/0 | Routine Compliance | ||||||
Letter | 12/16/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 12/16/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 12/13/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Letter | 12/04/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 12/04/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 12/02/2019 | Minor Out of Compliance | BRAGG_SD_2 | 2/0 | Routine Compliance | ||||||
Letter | 08/20/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 08/20/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 08/19/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Letter | 08/15/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 08/15/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 08/14/2019 | Minor Out of Compliance | BRAGG_SD_2 | 0/3 | Installation | ||||||
TCAR | 07/15/2019 | Satisfied | PAYNE_CL_1 | Closure | |||||||
Issue Document | 07/08/2019 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 07/08/2019 | Satisfied | WILSON_ML_1 | Closure | |||||||
Document Management | 07/05/2019 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 06/27/2019 | Satisfied | WILSON_ML_1 | Closure | |||||||
Issue Document | 06/27/2019 | Satisfied | WILSON_ML_1 | Closure | |||||||
Document Management | 06/26/2019 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 05/14/2019 | Satisfied | WILSON_ML_1 | Closure | |||||||
Issue Document | 05/14/2019 | Satisfied | WILSON_ML_1 | Closure | |||||||
Site Inspection | 05/13/2019 | In Compliance | BRAGG_SD_2 | 0/3 | Closure | ||||||
Issue Document | 08/28/2017 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Site Inspection | 08/23/2017 | In Compliance | BRAGG_SD_2 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 08/16/2017 | Satisfied | BRAGG_SD_2 | Routine Compliance | |||||||
Site Inspection | 12/21/2015 | In Compliance | PAYNE_CL_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/10/2015 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Site Inspection | 02/24/2014 | In Compliance | PAYNE_CL_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/20/2014 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Record Document | 10/31/2011 | Satisfied | PORTER_AJ_1 | Non-Compliance | |||||||
Letter | 09/14/2011 | Satisfied | CLEMONS_AM_1 | Non-Compliance | |||||||
Site Inspection | 09/12/2011 | Minor Out of Compliance | PORTER_AJ_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/12/2011 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Meeting | 07/11/2011 | Satisfied | GILLMAN_M | Non-Compliance | |||||||
Document Management | 07/01/2011 | Complete | PORTER_AJ_1 | Incident | |||||||
Document Management | 07/01/2011 | Complete | PORTER_AJ_1 | Incident | |||||||
Letter | 12/13/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Incident | 12/01/2010 | Has not led to Discharge | PORTER_AJ_1 | Incident | |||||||
Phone Conversation | 12/01/2010 | Satisfied | PORTER_AJ_1 | Non-Compliance | |||||||
Site Inspection | 11/29/2010 | Minor Out of Compliance | PORTER_AJ_1 | 0/3 | Non-Compliance | ||||||
Record Document | 11/29/2010 | Satisfied | PORTER_AJ_1 | Non-Compliance | |||||||
Letter | 10/18/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/22/2010 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Site Inspection | 09/22/2010 | Minor Out of Compliance | PORTER_AJ_1 | 0/3 | Routine Compliance | ||||||
Incident | 08/11/2010 | Has not led to Discharge | PORTER_AJ_1 | Incident | |||||||
Incident | 08/11/2010 | Has not led to Discharge | PORTER_AJ_1 | Incident | |||||||
Document Management | 08/11/2010 | Complete | PORTER_AJ_1 | Incident | |||||||
Record Document | 07/07/2010 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Incident | 03/25/2010 | Has not led to Discharge | PORTER_AJ_1 | Incident | |||||||
Document Management | 03/25/2010 | Complete | PORTER_AJ_1 | Incident | |||||||
Phone Conversation | 12/14/2009 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Letter | 09/22/2009 | Satisfied | PORTER_AJ_1 | Non-Compliance | |||||||
Site Inspection | 09/15/2009 | Major Out of Compliance | PORTER_AJ_1 | 0/3 | Routine Compliance | ||||||
Record Document | 05/22/2009 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
Letter | 05/15/2009 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 05/11/2009 | Minor Out of Compliance | STEVENSON_JS | 0/3 | Routine Compliance | ||||||
Record Document | 11/14/2008 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Record Document | 10/07/2008 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
TCAR | 03/25/2008 | Satisfied | THAYER_JD_1 | Closure | |||||||
Letter | 03/25/2008 | Satisfied | THAYER_JD_1 | Closure | |||||||
Site Inspection | 02/18/2008 | In Compliance | STEVENSON_JS | 0/3 | Installation | ||||||
Site Inspection | 02/18/2008 | In Compliance | STEVENSON_JS | 0/3 | Routine Compliance | ||||||
Letter | 03/26/2007 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 03/07/2007 | Minor Out of Compliance | STEVENSON_JS | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | THAYER_JD_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/14/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Have a certified contractor repair or replace the Premium Spill Containment. Contact the inspector prior to work beginning for necessary paperwork. Email: Emily.Elliott@FLHealth.gov | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
09/07/1993 | COMPLETED | 60 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
03/21/1988 | COMPLETED | 60 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||