![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||
District | Southwest | Type | Retail Station | ||||
County | Hernando | Status | OPEN | ||||
ID | 8520217 | Latitude | 28° 32' 2.42 | ||||
Name |
CIRCLE K #7486 13077 CORTEZ BLVD |
Longitude | 82° 30' 41.0379 | ||||
SPRING HILL, FL 34613 | LL Method | DGPS | |||||
Contact | GRAHAM BIGGS | LL Status | REVIEWED | ||||
Phone | (919) 774-6700 | Status Date | 11/13/2003 | ||||
Account Owner Information | |||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 05/20/1994 | ||||
Contact | IRA LEWIS | ||||||
Phone | (423) 400-2480 | ||||||
ILEWIS@CIRCLEK.COM | |||||||
Placard # / Date | 697634 - 06/28/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 10000 | Unleaded Gas (B) | 07/01/1984 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 10000 | Unleaded Gas (B) | 07/01/1984 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
3 | 10000 | Unleaded Gas (B) | 07/01/1984 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
4 | 10000 | Unleaded Gas (B) | 07/01/1984 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
GUARANTEE | 04/24/2022 | 08/03/2023 | |||||
INSURANCE | 12/01/2021 | 12/01/2022 | NAVIGATORS SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2015 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/18/2010 | 12/17/2011 | CHUBB | ||||
INSURANCE | 12/18/2009 | 12/17/2010 | CHUBB | ||||
INSURANCE | 12/17/2007 | 12/17/2008 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
NCLI | 03/27/2006 | 03/27/2006 | HARMAN_GR | 0/0 | COMPLIANCE ASSURANCE | ||
TCI | 03/24/2006 | 03/27/2006 | MINOR OUT-OF-COMPLIANCE | HARMAN_GR | 0/4 | COMPLIANCE ASSURANCE | |
IRFR | 08/02/2005 | 08/03/2005 | MOLLI_SA | 0/0 | DISCHARGE PROJECT | ||
TCI | 06/01/2005 | 06/01/2005 | IN-COMPLIANCE | MOLLI_SA | 0/4 | COMPLIANCE ASSURANCE | |
IRFR | 02/25/2005 | 03/28/2005 | SUMNER_C | 0/0 | DISCHARGE PROJECT | ||
CWOE | 09/13/2004 | 09/13/2004 | MOLLI_SA | 0/4 | COMPLIANCE ASSURANCE | ||
RRBD | 09/13/2004 | 09/13/2004 | MOLLI_SA | 0/4 | COMPLIANCE ASSURANCE | ||
DRFR | 04/23/2004 | 09/13/2004 | MOLLI_SA | 0/0 | DISCHARGE PROJECT | ||
DCCR | 04/23/2004 | 09/13/2004 | MOLLI_SA | 0/0 | DISCHARGE PROJECT | ||
NCLI | 04/23/2004 | 04/26/2004 | SUMNER_C | 0/0 | COMPLIANCE ASSURANCE | ||
TCI | 04/20/2004 | 04/26/2004 | MINOR OUT-OF-COMPLIANCE | SUMNER_C | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes PIPING IS DW AMERON FIBERGLASS | |||||||
TCI | 05/27/2003 | 06/09/2003 | IN-COMPLIANCE | MONROE_P | 0/4 | COMPLIANCE ASSURANCE | |
TCI | 06/04/2002 | 06/18/2002 | IN-COMPLIANCE | MONROE_P | 0/4 | COMPLIANCE ASSURANCE | |
TCI | 06/13/2001 | 06/29/2001 | IN-COMPLIANCE | MONROE_P | 0/4 | COMPLIANCE ASSURANCE | |
TCI | 04/24/2000 | 05/08/2000 | IN-COMPLIANCE | MONROE_P | 0/4 | COMPLIANCE ASSURANCE | |
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Letter | 08/28/2024 | Satisfied | WIMBERLY_E | Enforcement | |||
Enforcement Referral | 02/14/2024 | Accepted | LEE_MC_1 | Enforcement | |||
Record Document | 11/13/2023 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Record Document | 11/13/2023 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Letter | 11/13/2023 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Electronic Communication | 10/31/2023 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Electronic Communication | 10/10/2023 | Satisfied | MULLIGAN_PC_1 | Incident | |||
Record Document | 10/09/2023 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Electronic Communication | 10/04/2023 | Satisfied | MULLIGAN_PC_1 | Incident | |||
Electronic Communication | 10/04/2023 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Letter | 08/24/2023 | Satisfied | LEE_MC_1 | Compliance Assistance | |||
Site Inspection | 08/24/2023 | Major Out of Compliance | LEE_MC_1 | 0/4 | Routine Compliance | ||
Record Document | 08/22/2022 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Letter | 08/22/2022 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Site Inspection | 05/26/2022 | Major Out of Compliance | MULLIGAN_PC_1 | 0/4 | Routine Compliance | ||
Letter | 05/26/2022 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Incident | 03/01/2021 | Has not led to Discharge | MULLIGAN_PC_1 | Incident | |||
Document Management | 10/19/2020 | Satisfied | MULLIGAN_PC_1 | Incident | |||
Incident | 04/13/2020 | Has not led to Discharge | MULLIGAN_PC_1 | Incident | |||
Document Management | 04/13/2020 | Satisfied | MULLIGAN_PC_1 | Incident | |||
Letter | 04/13/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Document Management | 04/13/2020 | Satisfied | MULLIGAN_PC_1 | Incident | |||
Record Document | 04/13/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Incident | 04/13/2020 | Has not led to Discharge | MULLIGAN_PC_1 | Incident | |||
Letter | 02/26/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Site Inspection | 02/26/2020 | Minor Out of Compliance | MULLIGAN_PC_1 | 0/4 | Routine Compliance | ||
Electronic Communication | 01/28/2020 | Satisfied | MULLIGAN_PC_1 | Routine Compliance | |||
Letter | 01/02/2019 | Satisfied | MULLIGAN_PC_1 | Closure | |||
Incident | 01/02/2019 | Has not led to Discharge | MULLIGAN_PC_1 | Incident | |||
Document Management | 01/02/2019 | Satisfied | MULLIGAN_PC_1 | Incident | |||
TCAR | 01/02/2019 | Satisfied | MULLIGAN_PC_1 | Closure | |||
Site Inspection | 06/27/2018 | In Compliance | MULLIGAN_PC_1 | 0/4 | Installation | ||
Letter | 06/27/2018 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Incident | 06/27/2018 | Has not led to Discharge | MULLIGAN_PC_1 | Incident | |||
Site Inspection | 06/27/2018 | In Compliance | MULLIGAN_PC_1 | 0/4 | Closure | ||
Site Inspection | 06/27/2018 | In Compliance | MULLIGAN_PC_1 | 0/4 | Compliance Assistance | ||
Electronic Communication | 06/18/2018 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Site Inspection | 04/24/2018 | Minor Out of Compliance | MULLIGAN_PC_1 | 0/4 | Routine Compliance | ||
Letter | 04/24/2018 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Site Inspection | 06/28/2016 | In Compliance | HECKMAN_DA_1 | 0/4 | Closure | ||
Site Inspection | 06/28/2016 | In Compliance | HECKMAN_DA_1 | 0/4 | Installation | ||
Issue Document | 06/28/2016 | Satisfied | HECKMAN_DA_1 | Closure | |||
Issue Document | 06/28/2016 | Satisfied | HECKMAN_DA_1 | Installation | |||
Record Document | 06/21/2016 | Satisfied | ANTON_TM_1 | Non-Compliance | |||
Record Document | 06/10/2016 | Satisfied | ANTON_TM_1 | Non-Compliance | |||
Document Management | 05/23/2016 | Complete | ANTON_TM_1 | Incident | |||
Site Inspection | 05/23/2016 | Minor Out of Compliance | ANTON_TM_1 | 0/4 | Routine Compliance | ||
Letter | 05/23/2016 | Satisfied | ANTON_TM_1 | Non-Compliance | |||
Incident | 05/23/2016 | Has not led to Discharge | ANTON_TM_1 | Incident | |||
Record Document | 08/06/2015 | Satisfied | ANTON_TM_1 | Non-Compliance | |||
Record Document | 04/07/2015 | Satisfied | ANTON_TM_1 | Routine Compliance | |||
Record Document | 04/07/2015 | Satisfied | ANTON_TM_1 | Routine Compliance | |||
Record Document | 04/07/2015 | Satisfied | ANTON_TM_1 | Routine Compliance | |||
Record Document | 04/07/2015 | Satisfied | ANTON_TM_1 | Routine Compliance | |||
Record Document | 04/07/2015 | Satisfied | ANTON_TM_1 | Routine Compliance | |||
Record Document | 07/23/2014 | Satisfied | HECKMAN_DA_1 | Non-Compliance | |||
Letter | 06/11/2014 | Satisfied | HECKMAN_DA_1 | Non-Compliance | |||
Site Inspection | 06/11/2014 | Major Out of Compliance | HECKMAN_DA_1 | 0/4 | Routine Compliance | ||
Document Management | 10/25/2013 | Complete | COLSON_NJ_1 | Incident | |||
Document Management | 10/25/2013 | Complete | COLSON_NJ_1 | Incident | |||
Incident | 10/25/2013 | Has not led to Discharge | COLSON_NJ_1 | Incident | |||
Record Document | 09/06/2011 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||
Site Inspection | 08/19/2011 | Minor Out of Compliance | COLSON_NJ_1 | 0/4 | Routine Compliance | ||
Letter | 08/19/2011 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||
Record Document | 07/13/2011 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||
Site Inspection | 09/15/2010 | In Compliance | JUARISTIC_GK_1 | 0/4 | Routine Compliance | ||
Record Document | 04/23/2010 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||
Emergency Preparedness Information | 03/26/2010 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||
Site Inspection | 03/25/2010 | Major Out of Compliance | JUARISTIC_GK_1 | 0/4 | Routine Compliance | ||
Letter | 03/25/2010 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||
Record Document | 06/25/2009 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||
Record Document | 06/04/2009 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||
Site Inspection | 09/03/2008 | In Compliance | COLSON_NJ_1 | 0/4 | Non-Compliance | ||
Site Inspection | 07/02/2008 | Minor Out of Compliance | COLSON_NJ_1 | 0/4 | Routine Compliance | ||
Emergency Preparedness Information | 07/02/2008 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||
Letter | 07/02/2008 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||
Site Inspection | 12/21/2007 | In Compliance | BAUER_DR_1 | 0/1 | Non-Compliance | ||
Letter | 08/21/2007 | Satisfied | HARMAN_GR | Non-Compliance | |||
TCAR | 07/30/2007 | Satisfied | OSTENSEN_SA_1 | Closure | |||
Letter | 07/19/2007 | NCL Re-Issued | HARMAN_GR | Non-Compliance | |||
Letter | 06/07/2007 | Satisfied | HARMAN_GR | Non-Compliance | |||
Site Inspection | 06/07/2007 | Major Out of Compliance | HARMAN_GR | 0/4 | Non-Compliance | ||
Site Inspection | 06/06/2007 | In Compliance | HARMAN_GR | 0/4 | Installation | ||
Site Inspection | 06/06/2007 | Major Out of Compliance | HARMAN_GR | 0/4 | Routine Compliance | ||
Site Inspection | 05/14/2007 | In Compliance | HARMAN_GR | 0/4 | Routine Compliance | ||
Emergency Preparedness Information | 02/08/2007 | Satisfied | HARMAN_GR | Routine Compliance | |||
Emergency Preparedness Information | 10/24/2006 | Satisfied | OSTENSEN_SA_1 | Routine Compliance | |||
TCAR | 07/12/2006 | Satisfied | OSTENSEN_SA_1 | Closure | |||
Site Inspection | 07/07/2006 | In Compliance | HARMAN_GR | 0/4 | Non-Compliance | ||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
11/13/2023 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | Begin incident investigation into how product was entering the sump. Depending on the source of the leak further testing may be required. If sump failed an integrity test due to a penetration issue soil sampling will likely be required. Submit any investigation, repair, or testing documentation to Citrus County Environmental Health. | |||
Discharge Information | |||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||
04/23/2004 | COMPLETED | 29 | |||||
12/19/1990 | COMPLETED | 30 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||