Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Levy | Status | OPEN | ||||||||
ID | 8520386 | Latitude | 29° 28' 19.9215 | ||||||||
Name |
JIFFY FOOD STORE #2948 607 S MAIN ST |
Longitude | 82° 51' 29.1041 | ||||||||
CHIEFLAND, FL 32626 | LL Method | DPHO | |||||||||
Contact | WHITNEY S SMITH | LL Status | REVIEWED | ||||||||
Phone | (352) 493-4292 | Status Date | 09/11/2014 | ||||||||
Account Owner Information | |||||||||||
Name | HUDSON FOOD STORES INC PO BOX 2298 Chiefland, FL 32644 |
Effective Date | 07/14/1999 | ||||||||
Contact | WHITNEY S SMITH | DENNIS BRADLEY (352-210-1978) | ||||||||||
Phone | (352) 493-4292 | ||||||||||
TPARKER@SVIC.NET | |||||||||||
Placard # / Date | 685846 - 06/10/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | HUDSON FOOD STORES INC PO BOX 2298 Chiefland, FL 32644 |
Effective Date | 07/14/1999 | ||||||||
Contact | WHITNEY S SMITH | DENNIS BRADLEY (352-210-1978) | ||||||||||
Phone | (352) 493-4292 | ||||||||||
TPARKER@SVIC.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 10000 | Vehicular Diesel (D) | 06/01/1987 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 10000 | Unleaded Gas (B) | 06/01/1987 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4R1 | 10000 | Unleaded Gas (B) | 06/01/1982 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5R1 | 22000 | Vehicular Diesel (D) | 06/01/1982 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6R1 | 4000 | Kerosene (K) | 07/01/1994 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7R1 | 4000 | Unleaded Gas (B) | 07/01/1994 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 10000 | Unleaded Gas (B) | 06/01/1987 | ABOVEGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 2200 | New/Lube Oil (O) | 07/01/1982 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (D) External protective coating | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 1000 | New/Lube Oil (O) | 01/01/1998 | ABOVEGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact | (Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 5000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 5000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 5000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 5000 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 5000 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 5000 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 09/25/2021 | 09/25/2022 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2018 | 09/25/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2016 | 09/25/2018 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2015 | 09/25/2016 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2014 | 09/25/2015 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2012 | 09/25/2014 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2010 | 09/25/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/25/2010 | 09/25/2011 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2009 | 09/25/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 09/03/1996 | 01/01/1999 | FPLIPA | ||||||||
INSURANCE | 08/31/1989 | 09/10/1996 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 08/29/2005 | 08/22/2005 | DEFALCO_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D INFO RETANK,PIPING AND CONTAINMENT COATING. ALL OK. WORK WAS COMPLETED BY 6/25/05 AFTER COUNTY T C I 04/21/05. | |||||||||||
CALL | 08/25/2005 | 09/02/2005 | DEFALCO_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D CALL FROM SONEY SMITH RE LETTER LTR OF 08/2205. HE WILL PROVIDE INFO AS REQUESTED. | |||||||||||
TCI | 04/21/2005 | 04/25/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | |||||
TCI | 06/15/2004 | 06/15/2004 | IN-COMPLIANCE | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | |||||
TCI | 06/12/2003 | 06/19/2003 | IN-COMPLIANCE | SHEFFIELD_C | 0/8 | COMPLIANCE ASSURANCE | |||||
Completion Notes SINGLE-WALLED METAL TANKS INSIDE CONCRETE CONTAINMENT. UNDERGROUND PIPING IS D/W GREEN ENVIRON FLEX . | |||||||||||
TCR | 04/26/2002 | 04/26/2002 | IN-COMPLIANCE | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PAINTING OF TANKS COMPLETED | |||||||||||
TCI | 01/24/2002 | 02/05/2002 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | |||||
TIN | 11/01/2001 | 12/07/2001 | IN-COMPLIANCE | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes REPAIR TO PIPING THAT WAS NICKED WHEN AUGERING FOR A MONITOR WELL | |||||||||||
TCR | 06/12/2001 | 06/15/2001 | IN-COMPLIANCE | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | |||||
TCR | 06/12/2001 | 06/13/2001 | IN-COMPLIANCE | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | |||||
TCI | 04/18/2001 | 05/11/2001 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | |||||
PDNE | 06/09/1999 | 06/09/1999 | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 06/08/1999 | 06/09/1999 | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/28/1999 | 06/09/1999 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | |||||
TIN | 03/31/1999 | 04/23/1999 | IN-COMPLIANCE | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | |||||
TXI | 03/09/1999 | 04/23/1999 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 8/0 | COMPLIANCE ASSURANCE | |||||
ATII | 06/04/1998 | 07/13/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 01/16/2025 | Satisfied | JACKSON_SM | Enforcement | |||||||
Enforcement Referral | 09/24/2024 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 12/18/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 05/27/2022 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Electronic Communication | 05/27/2022 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Site Inspection | 05/27/2022 | Major Out of Compliance | KEIM_MJ_1 | 8/0 | Routine Compliance | ||||||
Site Inspection | 02/27/2019 | Major Out of Compliance | KEIM_MJ_1 | 8/0 | Routine Compliance | ||||||
Electronic Communication | 02/27/2019 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Letter | 02/27/2019 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Electronic Communication | 02/27/2019 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Electronic Communication | 12/29/2017 | Satisfied | KEIM_MJ_1 | Complaint | |||||||
Site Inspection | 12/29/2017 | In Compliance | KEIM_MJ_1 | 8/0 | Complaint | ||||||
Issue Document | 12/29/2017 | Satisfied | KEIM_MJ_1 | Complaint | |||||||
Issue Document | 09/28/2017 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Record Document | 09/28/2017 | Satisfied | KEIM_MJ_1 | Complaint | |||||||
Electronic Communication | 09/28/2017 | Satisfied | KEIM_MJ_1 | Complaint | |||||||
Meeting | 09/28/2017 | Satisfied | KEIM_MJ_1 | Complaint | |||||||
Site Inspection | 09/28/2017 | Major Out of Compliance | KEIM_MJ_1 | 8/0 | Complaint | ||||||
Letter | 09/28/2017 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Electronic Communication | 03/31/2017 | Satisfied | DEFALCO_L | Enforcement | |||||||
Enforcement Tracking | 03/22/2016 | Closed Without Enforcement | DEFALCO_L | Enforcement | |||||||
Issue Document | 02/09/2016 | Satisfied | ALLISON_N_1 | Non-Compliance | |||||||
Enforcement Referral | 01/29/2016 | Accepted | DEFALCO_L | Enforcement | |||||||
Electronic Communication | 01/29/2016 | Satisfied | DEFALCO_L | Enforcement | |||||||
Electronic Communication | 01/29/2016 | Satisfied | DEFALCO_L | Enforcement | |||||||
Letter | 01/20/2016 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Site Inspection | 08/02/2015 | Minor Out of Compliance | SHULAW_BJ_1 | 8/0 | Routine Compliance | ||||||
Letter | 08/02/2015 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Issue Document | 10/25/2013 | Satisfied | PEREA_AO_1 | Routine Compliance | |||||||
Site Inspection | 10/24/2013 | In Compliance | KASSEES_RP_1 | 8/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/23/2013 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Enforcement Tracking | 08/24/2011 | Closed Without Enforcement | DEFALCO_L | Enforcement | |||||||
Emergency Preparedness Information | 08/20/2011 | Satisfied | SHULAW_BJ_1 | Routine Compliance | |||||||
Site Inspection | 08/20/2011 | In Compliance | SHULAW_BJ_1 | 8/0 | Routine Compliance | ||||||
Enforcement Referral | 07/12/2011 | Accepted | DEFALCO_L | Enforcement | |||||||
Site Inspection | 07/11/2011 | Minor Out of Compliance | SHULAW_BJ_1 | 8/0 | Non-Compliance | ||||||
Letter | 07/11/2011 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Letter | 04/11/2011 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Site Inspection | 04/11/2011 | Minor Out of Compliance | SHULAW_BJ_1 | 8/0 | Non-Compliance | ||||||
Site Inspection | 11/27/2010 | Minor Out of Compliance | SHULAW_BJ_1 | 8/0 | Routine Compliance | ||||||
Letter | 11/27/2010 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Site Inspection | 04/29/2010 | In Compliance | GAIDOS_DB_1 | 8/0 | Non-Compliance | ||||||
Letter | 03/10/2010 | Satisfied | GAIDOS_DB_1 | Non-Compliance | |||||||
Site Inspection | 03/10/2010 | Minor Out of Compliance | GAIDOS_DB_1 | 8/0 | Non-Compliance | ||||||
Site Inspection | 10/08/2009 | Minor Out of Compliance | GAIDOS_DB_1 | 9/0 | Routine Compliance | ||||||
Letter | 10/08/2009 | Satisfied | GAIDOS_DB_1 | Non-Compliance | |||||||
Site Inspection | 02/14/2008 | In Compliance | KASSEES_RP_1 | 6/0 | Non-Compliance | ||||||
Site Inspection | 09/25/2007 | Minor Out of Compliance | KASSEES_RP_1 | 8/0 | Routine Compliance | ||||||
Letter | 09/25/2007 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 08/30/2007 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/27/2022 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have the testing completed and forward the results to the inspector to address this violation. | |||||||
05/27/2022 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Have the testing completed and forward the results to the inspector to address this violation. | |||||||
02/27/2019 | 5022 | Minor | 3.3 Concrete secondary containment does not meet construction requirements for shop fabricated tank systems. | Evident cracks were observed in the piping transition section of the concrete containment. Complete repairs, and forward documentation to the inspector to address this violation. | |||||||
02/27/2019 | 5057 | SNC-B | 3.5 Pressurized small diameter piping not installed with line leak detectors and meeting requirements. | Install line leak detectors and forward documentation to the inspector to address this violation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/02/1992 | COMPLETED | 60 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||