DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Southwest   Type    Retail Station
 
County Pinellas   Status    OPEN
 
ID 8520528   Latitude    27° 46' 52.6916
 
Name CIRCLE K #1677
2749 9TH AVE N
Longitude    82° 40' 15.9115
  SAINT PETERSBURG, FL 33713-6804 LL Method    DPHO
 
Contact ANDREW BURRESS   LL Status    REVIEWED
 
Phone (984) 389-1258   Status Date    09/09/2003
 
Account Owner Information
 
Name CIRCLE K STORES INC
1100 Situs Ct
Raleigh, NC 27606-5446
Effective Date    05/20/1994
 
Contact IRA LEWIS
 
Phone (423) 400-2480
 
Email ILEWIS@CIRCLEK.COM
  Placard # / Date    697637 - 06/28/2024
Property Owner Information
 
Name CIRCLE K STORES INC
1100 Situs Ct
Raleigh, NC 27606-5446
Effective Date    09/01/2021
 
Contact IRA LEWIS
 
Phone (423) 400-2480
 
Email ILEWIS@CIRCLEK.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
1 10058 Unleaded Gas (B) 05/01/1985 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(S) DEP approved containment
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
2 10058 Unleaded Gas (B) 05/01/1985 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(S) DEP approved containment
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
3 10058 Unleaded Gas (B) 05/01/1985 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(S) DEP approved containment
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
GUARANTEE   04/28/2024 08/26/2025
GUARANTEE   04/30/2023 08/28/2024
GUARANTEE   04/24/2022 08/21/2023
GUARANTEE   04/25/2021 08/27/2022
INSURANCE   12/01/2020 12/01/2021 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   12/01/2019 12/01/2020 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   12/01/2018 12/01/2019 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2017 12/01/2018 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2016 12/01/2017 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2015 12/01/2016 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2014 12/01/2015 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2013 12/01/2014 CHUBB
INSURANCE   12/01/2011 12/01/2013 CHUBB
INSURANCE   12/01/2011 12/01/2012 CHUBB
INSURANCE   12/17/2010 12/17/2011 CHUBB
INSURANCE   12/17/2009 12/17/2010 CHUBB
INSURANCE   12/17/2008 12/17/2009 AMERICAN INTERNATIONAL SPECIALTY LINES
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
FR 03/10/2006 03/10/2006 ROGGELIN 0/1 DISCHARGE PROJECT
 
 Completion Notes TXI/TIN OF 1/16/06 CORRECTED THIS ITEM
 
LTR 03/09/2006 03/10/2006 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
RRBD 02/09/2006 02/13/2006 FRAZIER 0/0 COMPLIANCE ASSURANCE
 
TXI 01/16/2006 03/10/2006 IN-COMPLIANCE ROGGELIN 0/1 COMPLIANCE ASSURANCE
 
 Completion Notes REMOVED REG #2 (MIDDLE TANK) SPILL CONTAINMENT UNIT
 
CWOE 01/16/2006 03/10/2006 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
TIN 01/16/2006 03/10/2006 IN-COMPLIANCE ROGGELIN 0/1 COMPLIANCE ASSURANCE
 
 Completion Notes INSTALLED ONE OPW 2100-IC SINGLE-WALL SPILL CONTAINMENT UNIT ON REG #2 TANK (MIDDLE TANK)
 
IRFR 01/05/2006 03/10/2006 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes WARPED SPILL CONTAINMENT UNIT
 
NCLI 11/17/2005 11/21/2005 FRAZIER 0/0 COMPLIANCE ASSURANCE
 
TCI 11/17/2005 11/21/2005 SIGNIFICANT OUT-OF-COMPLIANCE FRAZIER 0/3 COMPLIANCE ASSURANCE
 
SRRV 12/13/2004 12/17/2004 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes PINELLAS CLEANUP RCVD LCAR FROM ATC ASSOCIATES
 
RRBD 10/01/2004 10/19/2004 BARNETT 0/0 COMPLIANCE ASSURANCE
 
NCLI 09/27/2004 09/29/2004 BARNETT 0/0 COMPLIANCE ASSURANCE
 
TCI 09/22/2004 09/29/2004 MINOR OUT-OF-COMPLIANCE BARNETT 0/3 COMPLIANCE ASSURANCE
 
RRBD 07/23/2004 12/17/2004 DISCHARGE PROJECT
 
DSUC 07/19/2004 07/19/2004 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes STATUS TO BE DETERMINED BY DEP TALLAHASSEE CLEANUP
 
RRBD 07/15/2004 07/19/2004 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes ANALYTICAL DATA RCVD
 
LTR 07/07/2004 07/11/2004 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes REQUESTED ANALYTICAL DATA FROM CONOCO PHILLIPS
 
DRFR 07/02/2004 07/11/2004 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes DISCOVERY DATE 04/14/04
 
LTR 07/01/2004 07/11/2004 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes REQUESTED ANALYTICAL DATA FROM CIRCLE K
 
RRBD 06/16/2004 07/11/2004 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes ATC ASSOCIATES REPORT - NEED ANALYTICAL DATA
 
RRBD 06/08/2004 06/09/2004 DISCHARGE PROJECT
 
NCLI 05/23/2004 05/23/2004 ROGGELIN 0/3 DISCHARGE PROJECT
 
 Completion Notes NO 3-YEAR TIGHTNESS TEST FOR SIR = SNC A
 
TDI 05/14/2004 05/23/2004 SIGNIFICANT OUT-OF-COMPLIANCE ROGGELIN 0/3 DISCHARGE PROJECT
 
LTR 04/06/2004 04/18/2004 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes CRITIQUE OF REPORT
 
RRBD 03/16/2004 04/18/2004 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes ATC ASSOC SPILL BUCKET CLOSURE REPORT
 
LTR 09/17/2003 09/28/2003 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAILED PHOTOS TO F. FRANCONI
 
NCLI 09/17/2003 09/28/2003 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
TCI 09/04/2003 09/28/2003 MINOR OUT-OF-COMPLIANCE ROGGELIN 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes LINE TEST & LLD TESTS 2/23/03; ALL 3 TANKS TIGHTNESS TESTED 2/7/01
 
LTR 02/26/2003 02/26/2003 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
TCI 02/25/2003 02/26/2003 IN-COMPLIANCE STRAUSS 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes DW AMERON FRP PIPE
 
LTR 12/03/2002 12/04/2002 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
LTR 11/12/2002 11/12/2002 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
TIN 10/31/2002 11/12/2002 IN-COMPLIANCE STRAUSS 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes DW AMERON FRP
 
NCLI 10/28/2002 10/29/2002 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
NCLI 10/16/2002 12/04/2002 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
LTR 08/01/2002 08/06/2002 HALSCOTT 0/0 DISCHARGE PROJECT
 
RRBD 03/04/2002 03/07/2002 COMPLIANCE ASSURANCE
 
NCLI 02/07/2002 02/25/2002 TAM 0/0 COMPLIANCE ASSURANCE
 
TCI 02/06/2002 02/24/2002 SIGNIFICANT OUT-OF-COMPLIANCE TAM 0/3 COMPLIANCE ASSURANCE
 
TCI 02/22/2001 03/07/2001 IN-COMPLIANCE STRAUSS 0/3 COMPLIANCE ASSURANCE
 
TCI 05/09/2000 05/22/2000 IN-COMPLIANCE CASTOR 0/3 COMPLIANCE ASSURANCE
 
TCI 06/10/1999 06/14/1999 IN-COMPLIANCE SOWERS 0/3 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Site Inspection 09/20/2024 Major Out of Compliance PUHR_NM_1 0/3 Routine Compliance
 
Letter 09/20/2024 Satisfied PUHR_NM_1 Compliance Assistance
 
Letter 08/28/2024 Satisfied WIMBERLY_E Enforcement
 
Enforcement Referral 10/18/2023 Accepted JUARISTIC_GK_1 Enforcement
 
Electronic Communication 10/18/2023 Satisfied JUARISTIC_GK_1 Compliance Assistance
 
Electronic Communication 10/05/2023 Satisfied JUARISTIC_GK_1 Compliance Assistance
 
Letter 02/23/2023 Satisfied COLSON_NJ_1 Compliance Assistance
 
Electronic Communication 02/09/2023 Satisfied COLSON_NJ_1 Routine Compliance
 
Site Inspection 02/06/2023 Major Out of Compliance COLSON_NJ_1 0/3 Routine Compliance
 
Electronic Communication 09/09/2020 Satisfied COLSON_NJ_1 Compliance Assistance
 
Letter 09/09/2020 Satisfied COLSON_NJ_1 Compliance Assistance
 
Letter 08/12/2020 Satisfied COLSON_NJ_1 Compliance Assistance
 
Site Inspection 08/12/2020 Minor Out of Compliance COLSON_NJ_1 0/3 Routine Compliance
 
Electronic Communication 07/09/2020 Satisfied COLSON_NJ_1 Routine Compliance
 
Letter 05/25/2018 Satisfied COLSON_NJ_1 Compliance Assistance
 
Record Document 05/25/2018 Satisfied COLSON_NJ_1 Compliance Assistance
 
Site Inspection 02/16/2018 Minor Out of Compliance COLSON_NJ_1 0/3 Routine Compliance
 
Letter 02/16/2018 Satisfied COLSON_NJ_1 Compliance Assistance
 
Electronic Communication 02/05/2018 Satisfied COLSON_NJ_1 Routine Compliance
 
Document Management 01/05/2016 Complete COLSON_NJ_1 Incident
 
Incident 01/05/2016 Has not led to Discharge COLSON_NJ_1 Incident
 
Letter 10/16/2015 Satisfied COLSON_NJ_1 Non-Compliance
 
Site Inspection 10/16/2015 Minor Out of Compliance COLSON_NJ_1 0/3 Routine Compliance
 
Electronic Communication 09/25/2015 Satisfied COLSON_NJ_1 Routine Compliance
 
Issue Document 05/19/2014 Satisfied STRAUSS_RH_1 Installation
 
Site Inspection 05/19/2014 In Compliance STRAUSS_RH_1 0/3 Installation
 
Issue Document 05/15/2014 Satisfied STRAUSS_RH_1 Closure
 
Site Inspection 05/15/2014 In Compliance STRAUSS_RH_1 0/3 Closure
 
Site Inspection 09/24/2013 In Compliance STRAUSS_RH_1 0/3 Non-Compliance
 
Letter 09/11/2013 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 09/11/2013 Minor Out of Compliance STRAUSS_RH_1 0/3 Routine Compliance
 
Site Inspection 01/12/2012 In Compliance STRAUSS_RH_1 0/3 Routine Compliance
 
Incident 01/12/2012 Has not led to Discharge STRAUSS_RH_1 Incident
 
Incident 06/16/2011 Has not led to Discharge STRAUSS_RH_1 Incident
 
Discharge Reporting 04/05/2011 Satisfied STRAUSS_RH_1 Discharge
 
Incident 01/31/2011 Has not led to Discharge STRAUSS_RH_1 Incident
 
Incident 01/31/2011 Has not led to Discharge STRAUSS_RH_1 Incident
 
Site Inspection 01/21/2011 In Compliance STRAUSS_RH_1 0/3 Non-Compliance
 
Site Inspection 01/06/2011 Minor Out of Compliance STRAUSS_RH_1 0/3 Routine Compliance
 
Letter 01/06/2011 Satisfied STRAUSS_RH_1 Non-Compliance
 
Incident 10/22/2010 Has not led to Discharge LONGEN_JL_1 Incident
 
Site Inspection 06/21/2010 In Compliance STRAUSS_RH_1 0/1 Non-Compliance
 
Record Document 06/21/2010 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 05/24/2010 Minor Out of Compliance STRAUSS_RH_1 0/3 Non-Compliance
 
Letter 05/24/2010 Satisfied STRAUSS_RH_1 Non-Compliance
 
Letter 03/24/2010 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 03/24/2010 Minor Out of Compliance STRAUSS_RH_1 0/3 Non-Compliance
 
Record Document 03/12/2010 Satisfied STRAUSS_RH_1 Routine Compliance
 
Letter 03/04/2010 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 03/04/2010 Major Out of Compliance STRAUSS_RH_1 0/3 Routine Compliance
 
Record Document 07/20/2009 Satisfied LONGEN_JL_1 Non-Compliance
 
Record Document 04/27/2009 Satisfied BARNETT_JX Non-Compliance
 
Site Inspection 04/23/2009 Minor Out of Compliance BARNETT_JX 0/3 Routine Compliance
 
Letter 04/23/2009 Satisfied BARNETT_JX Non-Compliance
 
Emergency Preparedness Information 04/23/2009 Satisfied BARNETT_JX Routine Compliance
 
TCAR 04/03/2009 Satisfied STRAUSS_RH_1 Closure
 
Site Inspection 07/31/2008 In Compliance LONGEN_JL_1 0/3 Installation
 
Site Inspection 07/30/2008 In Compliance LONGEN_JL_1 0/3 Closure
 
Site Inspection 06/13/2008 Major Out of Compliance LONGEN_JL_1 0/3 Routine Compliance
 
Emergency Preparedness Information 06/13/2008 Satisfied LONGEN_JL_1 Routine Compliance
 
Letter 06/13/2008 Satisfied LONGEN_JL_1 Non-Compliance
 
Record Document 03/06/2008 Satisfied ROGGELIN_EM_1 Routine Compliance
 
Record Document 01/31/2008 Satisfied SOWERS_JA_1 Non-Compliance
 
Site Inspection 02/21/2007 Minor Out of Compliance ROGGELIN_EM_1 0/3 Routine Compliance
 
Emergency Preparedness Information 02/09/2007 Satisfied LONGEN_JL_1 Routine Compliance
 
Letter 01/05/2007 Satisfied SOWERS_JA_1 Non-Compliance
 
Site Inspection 01/04/2007 Minor Out of Compliance SOWERS_JA_1 0/3 Routine Compliance
 
TCAR 12/07/2006 Satisfied STRAUSS_RH_1 Closure
 
Emergency Preparedness Information 09/22/2006 Satisfied LONGEN_JL_1 Routine Compliance
 
TCAR 08/03/2006 Satisfied SOWERS_JA_1 Closure
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
09/20/2024 6073 Minor 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. *Remove accumulated liquids from the spill buckets and provide documentation to this office for review. Include documentation that the Eastern RUL spill bucket interstice was check for liquid. *Remove accumulated liquids in STP/manifold sumps and provide documentation. *Remove accumulated liquids in Dispensers 1-2 & 3-4 and provide documentation.
 
09/20/2024 6066 Minor 4.4 Not repaired per applicable standards. *Treat corrosion on East RUL sump piping. Provide documentation to this office for review.
 
02/06/2023 6073 Minor 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. Remove & properly dispose of the accumulated liquid in the Premium STP sump. Submit a pumpout receipt and/or photo to this office once corrected.
 
02/06/2023 6072 Minor 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. Be sure to have the required integrity testing performed within 36 months of the last test date. Submit current integrity test results for the (3) piping sumps to this office for review.
 
02/06/2023 6001 Minor 2.1 No reasonable access provided. Obtain access to the eastern RUL spill bucket interstice. Notify this office once the spill bucket interstice is again accessible for proper observation.
 
02/06/2023 6072 Minor 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. Be sure to have the required integrity testing performed within 36 months of the last test date. Submit current integrity test results for the (2) dispenser liners to this office for review.
 
02/06/2023 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Remove any accumulated liquids present in the spill bucket Secondary. Vacuum test the Premium bucket per manufacturer specifications. Submit the integrity test results to this office for review.
 
02/06/2023 6072 Minor 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. Be sure to perform the required testing per the equipment approval schedule. Submit current test results for the Parabeam-lined tank interstices.
 
02/06/2023 6073 Minor 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. Remove & properly dispose of the accumulated liquids in the primary spill buckets. Submit a pumpout receipt and/or photos to this office once completed.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
11/08/2006   COMPLETED
 
04/20/2004   INACTIVE 10
 
04/02/1987   ACTIVE 10 EARLY DETECTION INCENTIVE-ELIGIBLE