Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | South | Type | Retail Station | ||||||||
County | Desoto | Status | OPEN | ||||||||
ID | 8520880 | Latitude | 27° 13' 29.4852 | ||||||||
Name |
2829 ARCADIA INC 2829 HWY 70 W |
Longitude | 81° 53' 17.9962 | ||||||||
ARCADIA, FL 34266 | LL Method | DPHO | |||||||||
Contact | AHMAD SHEHADEH | LL Status | REVIEWED | ||||||||
Phone | (954) 526-4622 | Status Date | 08/29/2003 | ||||||||
Account Owner Information | |||||||||||
Name | 2829 ARCADIA INC 5440 NW 33RD AVE STE 100 FORT LAUDERDALE, FL 33309 |
Effective Date | 01/01/2025 | ||||||||
Contact | AHMAD SHEHADEH | ||||||||||
Phone | (561) 288-1710 | ||||||||||
ANSAR@POWERPETROINC.COM | |||||||||||
Placard # / Date | 705299 - 03/05/2025 | ||||||||||
Property Owner Information | |||||||||||
Name | 2829 ARCADIA INC 5440 NW 33RD AVE STE 100 FORT LAUDERDALE, FL 33309 |
Effective Date | 01/01/2025 | ||||||||
Contact | AHMAD SHEHADEH | ||||||||||
Phone | (561) 288-1710 | ||||||||||
ANSAR@POWERPETROINC.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1A | 12000 | Unleaded Gas (B) | 11/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2A | 12000 | Unleaded Gas (B) | 11/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Leaded Gas (A) | 05/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 10000 | Unleaded Gas (B) | 03/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Leaded Gas (A) | 05/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2B | 8000 | Vehicular Diesel (D) | 11/01/2010 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 10000 | Unleaded Gas (B) | 03/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 05/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 10000 | Unleaded Gas (B) | 03/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Unleaded Gas (B) | 05/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4R1 | 10000 | Vehicular Diesel (D) | 03/01/1988 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4R2 | 10000 | Vehicular Diesel (D) | 01/01/2002 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/08/2023 | 05/08/2024 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 05/08/2018 | 05/08/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/08/2017 | 05/08/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/08/2016 | 05/08/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 05/08/2015 | 05/08/2016 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 05/08/2014 | 05/08/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/04/2013 | 06/04/2014 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 06/04/2012 | 06/04/2013 | AMERICAN SAFETY | ||||||||
INSURANCE | 05/01/1989 | 12/15/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 04/25/2006 | 05/02/2006 | MINOR OUT-OF-COMPLIANCE | DURRANCE_W | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 09/07/2004 | 11/03/2004 | IN-COMPLIANCE | HARRISON_BL | 4/0 | COMPLIANCE ASSURANCE | |||||
TCI | 05/03/2004 | 05/06/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | HARRISON_BL | 4/0 | COMPLIANCE ASSURANCE | |||||
TCR | 10/21/2002 | 11/06/2002 | IN-COMPLIANCE | KEENE_K | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/11/2002 | 09/19/2002 | COMPLIANCE ASSURANCE | ||||||||
TCI | 08/26/2002 | 09/03/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | KEENE_K | 0/4 | COMPLIANCE ASSURANCE | |||||
TXI | 02/15/2002 | 03/11/2002 | IN-COMPLIANCE | KEENE_K | 1/0 | COMPLIANCE ASSURANCE | |||||
TIN | 01/11/2002 | 02/06/2002 | IN-COMPLIANCE | KEENE_K | 0/1 | COMPLIANCE ASSURANCE | |||||
SV | 12/19/2001 | 03/26/2002 | HARRISON_BL | 4/0 | DISCHARGE PROJECT | ||||||
TCR | 09/17/2001 | 09/17/2001 | IN-COMPLIANCE | KEENE_K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 08/22/2001 | 08/24/2001 | MINOR OUT-OF-COMPLIANCE | KEENE_K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 10/09/2000 | 10/09/2000 | IN-COMPLIANCE | KEENE_K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 08/21/2000 | 08/21/2000 | MINOR OUT-OF-COMPLIANCE | KEENE_K | 0/4 | COMPLIANCE ASSURANCE | |||||
UTCI | 06/23/1998 | 11/09/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Completion Notes N | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 12/19/2024 | Accepted | PARKS_J_4 | Enforcement | |||||||
Site Inspection | 08/08/2023 | Major Out of Compliance | PARKS_J_4 | 0/2 | Routine Compliance | ||||||
Letter | 08/08/2023 | Satisfied | PARKS_J_4 | Compliance Assistance | |||||||
Phone Conversation | 08/08/2023 | Satisfied | PARKS_J_4 | Routine Compliance | |||||||
Letter | 08/08/2023 | Satisfied | PARKS_J_4 | Compliance Assistance | |||||||
Electronic Communication | 08/02/2023 | Satisfied | PARKS_J_4 | Routine Compliance | |||||||
Phone Conversation | 05/17/2022 | Satisfied | PARKS_J_4 | Routine Compliance | |||||||
Letter | 05/17/2022 | Satisfied | PARKS_J_4 | Non-Compliance | |||||||
Site Inspection | 05/17/2022 | Major Out of Compliance | PARKS_J_4 | 0/2 | Routine Compliance | ||||||
Site Inspection | 01/31/2019 | In Compliance | SAUTTER_MA_2 | 0/2 | Routine Compliance | ||||||
Letter | 01/31/2019 | Satisfied | SAUTTER_MA_2 | Routine Compliance | |||||||
Enforcement Tracking | 07/28/2017 | Closed With Enforcement | PEDIGO_L | Enforcement | |||||||
TCAR | 07/21/2017 | Satisfied | PEDIGO_L | Closure | |||||||
Site Inspection | 01/31/2017 | In Compliance | ZIMMERMAN_CA_1 | 0/2 | Routine Compliance | ||||||
Record Document | 05/21/2015 | Satisfied | ZIMMERMAN_CA_1 | Non-Compliance | |||||||
Letter | 02/12/2015 | Satisfied | ZIMMERMAN_CA_1 | Non-Compliance | |||||||
Site Inspection | 02/12/2015 | Minor Out of Compliance | ZIMMERMAN_CA_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 02/27/2014 | In Compliance | ZIMMERMAN_CA_1 | 0/2 | Non-Compliance | ||||||
Site Inspection | 11/27/2013 | Major Out of Compliance | ZIMMERMAN_CA_1 | 0/2 | Routine Compliance | ||||||
Letter | 11/27/2013 | Satisfied | ZIMMERMAN_CA_1 | Non-Compliance | |||||||
Record Document | 10/25/2012 | Satisfied | PEDIGO_L | Enforcement | |||||||
Record Document | 10/25/2012 | Satisfied | PEDIGO_L | Enforcement | |||||||
Letter | 10/25/2012 | Satisfied | PEDIGO_L | Non-Compliance | |||||||
Site Inspection | 10/24/2012 | Major Out of Compliance | PEDIGO_L | 0/2 | Enforcement | ||||||
Phone Conversation | 07/20/2012 | Satisfied | PEDIGO_L | Enforcement | |||||||
Letter | 06/22/2012 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 06/19/2012 | Major Out of Compliance | DURRANCE_WK_1 | 0/2 | Routine Compliance | ||||||
Letter | 06/15/2011 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 01/07/2011 | In Compliance | DURRANCE_WK_1 | 0/4 | Installation | ||||||
Site Inspection | 01/07/2011 | In Compliance | DURRANCE_WK_1 | 0/4 | Closure | ||||||
Site Inspection | 10/29/2010 | Major Out of Compliance | DURRANCE_WK_1 | 0/4 | Routine Compliance | ||||||
Letter | 06/01/2010 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 05/19/2010 | Major Out of Compliance | DURRANCE_WK_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 01/22/2009 | Major Out of Compliance | DURRANCE_WK_1 | 0/4 | Routine Compliance | ||||||
Letter | 01/22/2009 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Letter | 05/14/2008 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 05/14/2008 | Major Out of Compliance | DURRANCE_WK_1 | 0/4 | Routine Compliance | ||||||
Enforcement Referral | 08/31/2007 | Accepted | PEDIGO_L | Enforcement | |||||||
Site Inspection | 06/21/2007 | Major Out of Compliance | MARSH_L | 0/4 | QA/QC | ||||||
Letter | 06/21/2007 | Satisfied | MARSH_L | Non-Compliance | |||||||
Enforcement Referral Activity - OLD | 06/12/2007 | Terminated | CULBRETH_L | Enforcement | |||||||
Emergency Preparedness Information | 05/22/2007 | Satisfied | DURRANCE_WK_1 | Routine Compliance | |||||||
Letter | 04/30/2007 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 04/30/2007 | Major Out of Compliance | DURRANCE_WK_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | DURRANCE_WK_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/28/2006 | Satisfied | DURRANCE_WK_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/17/2022 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Submit the Certificate of Financial Responsibility for review. | |||||||
05/17/2022 | 6057 | SNC-B | 4.7 Release detection not installed, operated, and maintained per manufacturer's instructions and standards. | The sensor in the STP sump is not installed in the lowest part of the sump. Install the sensor according to manufacturers specifications. | |||||||
05/17/2022 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove the PCW and water from all spill buckets and sumps. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
03/04/1988 | COMPLETED | 46 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||