Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 01/22/2025 Last Data Refresh: 01/21/2025 Report Generated from DOPPLER | |||||||||||
District | South | Type | Retail Station | ||||||||
County | Sarasota | Status | OPEN | ||||||||
ID | 8520885 | Latitude | 27° 11' 47.5331 | ||||||||
Name |
EXXON-OSPREY 10 N TAMIAMI TRL |
Longitude | 82° 29' 23.5629 | ||||||||
OSPREY, FL 34230 | LL Method | DPHO | |||||||||
Contact | STACY JALLO | LL Status | REVIEWED | ||||||||
Phone | (727) 366-1678 | Status Date | 07/29/2014 | ||||||||
Account Owner Information | |||||||||||
Name | OSPREY AMOCO INC 16055 SR 52, SU#201 LAND O LAKES, FL 34638 |
Effective Date | 08/09/2022 | ||||||||
Contact | STACY JALLO | ||||||||||
Phone | (727) 366-1678 | ||||||||||
JALLOOIL@GMAIL.COM | |||||||||||
Placard # / Date | 702358 - 10/18/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | OSPREY AMOCO INC 16055 SR 52, SU#201 LAND O LAKES, FL 34638 |
Effective Date | 08/09/2022 | ||||||||
Contact | STACY JALLO | ||||||||||
Phone | (727) 366-1678 | ||||||||||
JALLOOIL@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 3000 | Unleaded Gas (B) | 03/01/1971 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 3000 | Unleaded Gas (B) | 03/01/1971 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 3000 | Unleaded Gas (B) | 03/01/1971 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 3000 | Unleaded Gas (B) | 03/01/1971 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Unleaded Gas (B) | 03/01/1971 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 550 | Waste Oil (L) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 550 | Vehicular Diesel (D) | 07/01/1971 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Unleaded Gas (B) | 03/01/1998 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 12000 | Unleaded Gas (B) | 03/01/1998 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 01/20/2023 | 01/20/2024 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 01/20/2022 | 01/20/2023 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 10/28/2018 | 10/28/2019 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 10/28/2017 | 10/28/2018 | ACE | ||||||||
INSURANCE | 10/28/2015 | 10/28/2016 | ACE | ||||||||
INSURANCE | 10/28/2014 | 10/28/2015 | ACE | ||||||||
INSURANCE | 10/28/2013 | 10/28/2014 | ACE | ||||||||
INSURANCE | 10/28/2011 | 10/28/2012 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 10/28/2010 | 10/28/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 10/28/2008 | 10/28/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 03/16/2006 | 03/21/2006 | MINOR OUT-OF-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/03/2005 | 08/04/2005 | IN-COMPLIANCE | WALL | 0/0 | COMPLIANCE ASSURANCE | |||||
TCR | 05/25/2005 | 05/26/2005 | IN-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 03/08/2005 | 03/17/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 03/02/2004 | 03/11/2004 | IN-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 04/17/2003 | 04/29/2003 | IN-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 04/01/2002 | 04/02/2002 | IN-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 12/11/2001 | 12/17/2001 | IN-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 11/14/2001 | 11/16/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 10/23/2001 | 10/24/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 09/20/2001 | 09/24/2001 | MINOR OUT-OF-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 07/24/2001 | 07/27/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 04/17/2001 | 07/27/2001 | WALL | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/13/2001 | 04/16/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 05/25/2000 | 05/25/2000 | WALL | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 03/02/2000 | 03/15/2000 | WALL | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/02/2000 | 03/15/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 06/23/1999 | 07/01/1999 | IN-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 05/28/1999 | 06/01/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | WALL | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 11/12/2024 | Accepted | TYKOSKI_B_1 | Enforcement | |||||||
Site Inspection | 07/09/2024 | Major Out of Compliance | TYKOSKI_B_1 | 0/2 | Component Closure | ||||||
Site Inspection | 06/24/2024 | Major Out of Compliance | TYKOSKI_B_1 | 0/2 | Compliance Assistance | ||||||
Site Inspection | 06/12/2024 | Major Out of Compliance | TYKOSKI_B_1 | 0/2 | Component Installation | ||||||
Site Inspection | 05/30/2024 | Major Out of Compliance | TYKOSKI_B_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 05/17/2024 | Satisfied | TYKOSKI_B_1 | Routine Compliance | |||||||
Phone Conversation | 05/13/2024 | Satisfied | TYKOSKI_B_1 | Routine Compliance | |||||||
Phone Conversation | 07/18/2022 | Satisfied | CERQUERA_L | Enforcement | |||||||
Phone Conversation | 07/18/2022 | Satisfied | CERQUERA_L | Enforcement | |||||||
Letter | 07/18/2022 | Satisfied | CERQUERA_L | Enforcement | |||||||
Enforcement Referral | 03/18/2022 | Accepted | MURPHY_MA_1 | Enforcement | |||||||
Electronic Communication | 01/28/2022 | Satisfied | MURPHY_MA_1 | Routine Compliance | |||||||
Electronic Communication | 01/28/2022 | Satisfied | MURPHY_MA_1 | Routine Compliance | |||||||
Record Document | 01/28/2022 | Satisfied | MURPHY_MA_1 | Routine Compliance | |||||||
Site Inspection | 01/28/2022 | Major Out of Compliance | MURPHY_MA_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 01/28/2022 | Satisfied | MURPHY_MA_1 | Routine Compliance | |||||||
Electronic Communication | 01/28/2022 | Satisfied | MURPHY_MA_1 | Routine Compliance | |||||||
Electronic Communication | 01/28/2022 | Satisfied | MURPHY_MA_1 | Routine Compliance | |||||||
Letter | 12/18/2019 | Satisfied | NEUHAUS_AE_1 | Routine Compliance | |||||||
Site Inspection | 10/22/2019 | In Compliance | NEUHAUS_AE_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 10/17/2019 | Satisfied | NEUHAUS_AE_1 | Routine Compliance | |||||||
Electronic Communication | 10/17/2019 | Satisfied | NEUHAUS_AE_1 | Routine Compliance | |||||||
Letter | 04/13/2018 | Satisfied | MURPHY_MA_1 | Routine Compliance | |||||||
Site Inspection | 01/31/2018 | In Compliance | MURPHY_MA_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 01/29/2018 | Satisfied | MURPHY_MA_1 | Routine Compliance | |||||||
Site Inspection | 04/11/2016 | In Compliance | RAMSEY_TH_2 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 04/11/2016 | Satisfied | RAMSEY_TH_2 | Routine Compliance | |||||||
Electronic Communication | 04/11/2016 | Satisfied | RAMSEY_TH_2 | Routine Compliance | |||||||
Site Inspection | 07/23/2014 | In Compliance | WALL_KD_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/22/2014 | Satisfied | WALL_KD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/08/2012 | Satisfied | WALL_KD_1 | Routine Compliance | |||||||
Site Inspection | 10/08/2012 | In Compliance | WALL_KD_1 | 0/2 | Routine Compliance | ||||||
Record Document | 12/22/2011 | Satisfied | WALL_KD_1 | Non-Compliance | |||||||
Letter | 12/22/2011 | Satisfied | WALL_KD_1 | Non-Compliance | |||||||
Record Document | 12/21/2011 | Satisfied | WALL_KD_1 | Non-Compliance | |||||||
Electronic Communication | 12/21/2011 | Satisfied | WALL_KD_1 | Non-Compliance | |||||||
Site Inspection | 12/20/2011 | Major Out of Compliance | WALL_KD_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 08/25/2011 | Satisfied | WALL_KD_1 | Enforcement | |||||||
Issue Document | 08/25/2011 | Satisfied | WALL_KD_1 | Enforcement | |||||||
Record Document | 08/25/2011 | Satisfied | WALL_KD_1 | Enforcement | |||||||
Record Document | 08/25/2011 | Satisfied | WALL_KD_1 | Enforcement | |||||||
Document Management | 08/25/2011 | Complete | WALL_KD_1 | Enforcement | |||||||
Enforcement Tracking | 08/25/2011 | Closed With Enforcement | WALL_KD_1 | Enforcement | |||||||
Letter | 08/25/2011 | Satisfied | WALL_KD_1 | Enforcement | |||||||
Site Inspection | 02/15/2011 | In Compliance | WALL_KD_1 | 0/2 | Routine Compliance | ||||||
Record Document | 07/10/2009 | Satisfied | WALL_KD_1 | Routine Compliance | |||||||
Site Inspection | 06/05/2009 | Minor Out of Compliance | WALL_KD_1 | 0/2 | Non-Compliance | ||||||
Meeting | 03/10/2009 | Satisfied | WALL_KD_1 | Enforcement | |||||||
Letter | 02/26/2009 | Satisfied | WALL_KD_1 | Non-Compliance | |||||||
Site Inspection | 02/10/2009 | Major Out of Compliance | WALL_KD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 06/04/2008 | Major Out of Compliance | WALL_KD_1 | 0/2 | Non-Compliance | ||||||
Issue Document | 04/07/2008 | Satisfied | WALL_KD_1 | Enforcement | |||||||
Enforcement Referral | 03/25/2008 | Accepted | WALL_KD_1 | Enforcement | |||||||
Site Inspection | 03/25/2008 | Major Out of Compliance | WALL_KD_1 | 0/2 | Non-Compliance | ||||||
Letter | 12/21/2007 | Satisfied | WALL_KD_1 | Non-Compliance | |||||||
Site Inspection | 12/21/2007 | Major Out of Compliance | WALL_KD_1 | 0/2 | Routine Compliance | ||||||
Letter | 11/30/2007 | Satisfied | WALL_KD_1 | Non-Compliance | |||||||
Site Inspection | 02/06/2007 | In Compliance | WALL_KD_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | WALL_KD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/20/2006 | Satisfied | ANDERS_DT_1 | Routine Compliance | |||||||
Record Document | 09/15/2006 | Satisfied | WALL_KD_1 | Routine Compliance | |||||||
Record Document | 07/12/2006 | Satisfied | WALL_KD_1 | Routine Compliance | |||||||
Record Document | 07/11/2006 | Satisfied | WALL_KD_1 | Non-Compliance | |||||||
Record Document | 07/11/2006 | Satisfied | WALL_KD_1 | Non-Compliance | |||||||
Site Inspection | 07/03/2006 | In Compliance | ANDERS_DT_1 | 0/2 | Non-Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
06/05/2024 | 6080 | SNC-B | 4.11 Storage tank system closure requirements not met that did not result in a discharge. | Certified Contractors Form and Testing Records received. Submit Closure Integrity Report Form to petroleumstorage@scgov.net. | |||||||
06/05/2024 | 6084 | SNC-B | 4.15 Closure assessment not performed or properly completed. | Submit completed Closure Integrity Evaluation Report Form to petroleumstorage@scgov.net. | |||||||
06/05/2024 | 6082 | Minor | 4.13 Closure Integrity Report and Evaluation not completed and submitted in a timely fashion. | Submit completed Closure Integrity Evaluation Report Form to petroleumstorage@scgov.net. However, if a Closure Integrity Evaluation was not completed prior to closure and the owner or operator who did not or elected not to conduct a Closure Integrity Evaluation, in accordance with paragraph 62-761.800(3)(a), F.A.C., before the storage tank system or system component has been removed or closed in-place, regardless of the date of installation of the storage tank system or system component, shall conduct an investigation at the time of closure in accordance with Instructions for Conducting Sampling During Underground Storage Tank Closure, July 2019 Edition. Submit Soil Sampling Report and Closure Report to petroleumstorage@scgov.net. | |||||||
06/03/2024 | 6004 | Minor | 2.3 For Installation or Closure, Certified Contractors Form not submitted. | Submit completed Underground Storage System Installation and Removal Form for Certified Contractors to petroleumstorage@scgov.net. | |||||||
06/03/2024 | 6008 | Minor | 2.7 For installation, closure, or change in service status, notification not received in a timely manner. | Submit completed Integrity Testing Records, Closure Report, and Underground Storage System Installation and Removal Form for Certified Contractors to petroleumstorage@scgov.net. If required also submit Soil Sampling Report, Incident Notification Form, and Discharge Notification Form. | |||||||
05/31/2024 | 6008 | Minor | 2.7 For installation, closure, or change in service status, notification not received in a timely manner. | Submit completed Closure Report and Underground Storage System Installation and Removal Form for Certified Contractors to petroleumstorage@scgov.net. | |||||||
05/31/2024 | 6066 | Minor | 4.4 Not repaired per applicable standards. | To restore the structural integrity of the storage tank system and in a manner that will prevent releases or discharges from structural failure or corrosion perform a detailed evaluation of the STPs and associated piping to determine the extent of corrosion on the Regular and Premium STPs and associated piping and repair as necessary. Email photo of repaired STPs and components to petroleumstorage@scgov.net. | |||||||
05/28/2024 | 6001 | Minor | 2.1 No reasonable access provided. | Contact petroleumstorage@scgov.net to schedule follow up inspection. Ensure authorized facility representative will be available to unlock and open any covers. | |||||||
05/21/2024 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Email Certification of Financial Responsibility- Form 62-761.900(3) Part P along with one of the following financial instruments: Form 62-761.900(3) Part A through Form 62-761.900(3) Part H, and the insurance policy and all amendments to petroleumstorage@scgov.net. FDEP Storage Tank Financial Responsibility Introduction/links can be found at: https://floridadep.gov/waste/permitting-compliance-assistance/content/storage-tank-financial-responsibility. Financial Responsibility Forms can be found at: https://floridadep.gov/waste/permitting-compliance-assistance/content/storage-tank-financial-assurance-forms-mechanisms. | |||||||
01/28/2022 | 6008 | Minor | 2.7 For installation, closure, or change in service status, notification not received in a timely manner. | Corrective action to be determined by FDEP. | |||||||
01/26/2022 | 6043 | Minor | 4.13 Fillbox covers not marked according to requirements. | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6077 | Minor | 4.8 Out of service storage tank systems not tested annually for operability or interstice and liquid level not monitored annually. | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6078 | SNC-B | 4.9 Storage tanks systems with secondary containment designated out of service greater than 10 years. | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6006 | Minor | 2.5 Placard not displayed (or available upon request). | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6007 | SNC-A | 2.6 Owner, operator, or supplier deposited motor fuel into storage tank without current valid registration placard. | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6067 | Minor | 4.5 Integrity test not completed before being placed into operation or service. | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6051 | SNC-B | 4.5 Overfill prevention not provided or properly functioning. | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6055 | SNC-A | 4.6 Cannot detect a release from any portion of the system. (Including Emergency power generator storage tank systems installed prior to rule do not meet release detection requirements by October 13, 2018.) | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6024 | Minor | 2.2 Integrity test not performed on storage tank, integral piping, single-walled spill containment system, double-walled spill containment system, or doubled-walled sump prior to placing into service. | Corrective action to be determined by FDEP. | |||||||
01/25/2022 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Corrective action to be determined by FDEP. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
11/13/1992 | COMPLETED | 41 | PETROLEUM CLEANUP PARTICIPATION PROGRAM-PARTIAL | ||||||||
12/14/1988 | COMPLETED | 46 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||