DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northwest   Type    Retail Station
 
County Escambia   Status    OPEN
 
ID 8521140   Latitude    30° 27' 39.5616
 
Name CIRCLE K #4918
2350 W MICHIGAN AVE
Longitude    87° 16' 46.7451
  PENSACOLA, FL 32505 LL Method    DGPS
 
Contact HEATHER GILMORE   LL Status    REVIEWED
 
Phone (850) 549-2879   Status Date    10/10/2003
 
Account Owner Information
 
Name CIRCLE K STORES INC
25 W CEDAR ST STE M
Pensacola, FL 32502
Effective Date    01/13/2010
 
Contact IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON
 
Phone (850) 454-1070
 
Email ILEWIS@CIRCLEK.COM
  Placard # / Date    697405 - 06/28/2024
Property Owner Information
 
Name CIRCLE K STORES INC
25 W CEDAR ST STE M
Pensacola, FL 32502
Effective Date    01/13/2010
 
Contact IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON
 
Phone (850) 454-1070
 
Email ILEWIS@CIRCLEK.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
4 20000 Unleaded Gas (B) 11/01/2009 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
1 10000 Unleaded Gas (B) 01/01/1985 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
2 10000 Unleaded Gas (B) 01/01/1985 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
3 10000 Unleaded Gas (B) 01/01/1985 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(S) Statistical Inventory Reconcile
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
GUARANTEE   04/30/2023 08/28/2024
GUARANTEE   04/25/2021 08/27/2022
INSURANCE   12/01/2020 12/01/2021 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   12/01/2019 12/01/2020 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   12/01/2018 12/01/2019 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2017 12/01/2018 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2016 12/01/2017 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2013 12/01/2014 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2013 12/01/2016 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/17/2009 12/01/2011 CHUBB
INSURANCE   12/17/2008 12/17/2009 AMERICAN INTERNATIONAL SPECIALTY LINES
INSURANCE   12/17/2007 12/17/2008 AMERICAN INTERNATIONAL SPECIALTY LINES
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
RRBD 12/02/2005 12/02/2005 COMPLIANCE ASSURANCE
 
TCI 10/31/2005 11/01/2005 MINOR OUT-OF-COMPLIANCE ARTHUR B. TISSINGTON 0/3 COMPLIANCE ASSURANCE
 
TIN 07/19/2005 07/25/2005 IN-COMPLIANCE JOHN S. STEVENSON 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes INSTALLATION OF NEW PIPING.
 
TCI 01/18/2005 01/26/2005 IN-COMPLIANCE ARTHUR B. TISSINGTON 0/3 COMPLIANCE ASSURANCE
 
RRBD 01/10/2005 01/10/2005 COMPLIANCE ASSURANCE
 
TIN 10/29/2004 11/03/2004 IN-COMPLIANCE ARTHUR B. TISSINGTON 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes FACILITY SUB PUMP HOUSEING HYDROSTATICALLY TESTED, TEST HOLDING WATER AT TIME OF INSPECTION. ADAMS TANK & LIFT PCC050767
 
TIN 04/28/2004 05/04/2004 MINOR OUT-OF-COMPLIANCE ARTHUR B. TISSINGTON 0/3 COMPLIANCE ASSURANCE
 
TCR 12/05/2003 12/11/2003 IN-COMPLIANCE ARTHUR B. TISSINGTON 0/3 COMPLIANCE ASSURANCE
 
TCI 10/02/2003 10/07/2003 MINOR OUT-OF-COMPLIANCE ARTHUR B. TISSINGTON 0/3 COMPLIANCE ASSURANCE
 
TCR 02/03/2003 02/25/2003 IN-COMPLIANCE JOHN S. STEVENSON 0/3 COMPLIANCE ASSURANCE
 
TCI 11/20/2002 11/26/2002 SIGNIFICANT OUT-OF-COMPLIANCE JOHN S. STEVNESON 0/3 COMPLIANCE ASSURANCE
 
RRBD 02/15/2002 02/18/2002 COMPLIANCE ASSURANCE
 
TCI 11/15/2001 12/12/2001 MINOR OUT-OF-COMPLIANCE STEVENSON_JS 0/3 COMPLIANCE ASSURANCE
 
TCR 02/27/2001 03/13/2001 IN-COMPLIANCE STEVENSON_JS 0/3 COMPLIANCE ASSURANCE
 
TCI 12/13/2000 12/28/2000 MINOR OUT-OF-COMPLIANCE STEVENSON_JS 0/3 COMPLIANCE ASSURANCE
 
RRBD 02/01/2000 02/09/2000 STEVENOSN-JS 0/0 COMPLIANCE ASSURANCE
 
TCI 12/21/1999 12/22/1999 MINOR OUT-OF-COMPLIANCE STEVENSON_JS 0/3 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Enforcement Referral 05/14/2024 Accepted ELLIOTT_EV_1 Enforcement
 
Electronic Communication 04/05/2024 Satisfied ELLIOTT_EV_1 Compliance Assistance
 
Letter 02/20/2024 Satisfied ELLIOTT_EV_1 Compliance Assistance
 
Site Inspection 02/20/2024 Minor Out of Compliance ELLIOTT_EV_1 0/1 Routine Compliance
 
Electronic Communication 02/14/2024 Satisfied ELLIOTT_EV_1 Routine Compliance
 
Letter 04/21/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 04/21/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Record Document 04/12/2022 Satisfied GARTIN_D Routine Compliance
 
Record Document 03/09/2022 Satisfied GARTIN_D Compliance Assistance
 
Record Document 02/04/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Letter 02/03/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 02/03/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 02/02/2022 Major Out of Compliance GARTIN_D 0/1 Routine Compliance
 
TCAR 03/19/2021 Satisfied PAYNE_CL_1 Component Closure
 
Document Management 03/18/2021 Satisfied WILSON_ML_1 Component Closure
 
Document Management 03/18/2021 Satisfied WILSON_ML_1 Component Closure
 
Letter 03/18/2021 Satisfied WILSON_ML_1 Component Closure
 
Issue Document 03/18/2021 Satisfied WILSON_ML_1 Component Closure
 
Issue Document 02/10/2021 Satisfied WILSON_ML_1 Component Closure
 
Letter 02/10/2021 Satisfied WILSON_ML_1 Component Closure
 
Document Management 02/10/2021 Satisfied WILSON_ML_1 Component Closure
 
Record Document 02/08/2021 Satisfied BAVUSO_CX_1 Compliance Assistance
 
Site Inspection 01/20/2021 In Compliance BAVUSO_CX_1 0/1 Component Installation
 
Letter 01/13/2021 Satisfied WILSON_ML_1 Component Installation
 
Issue Document 01/13/2021 Satisfied WILSON_ML_1 Component Installation
 
Electronic Communication 12/11/2019 Satisfied BRAGG_SD_2 Compliance Assistance
 
Letter 12/10/2019 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 12/10/2019 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 12/09/2019 Minor Out of Compliance BRAGG_SD_2 0/1 Routine Compliance
 
Issue Document 08/17/2017 Satisfied WILSON_ML_1 Compliance Assistance
 
Electronic Communication 08/16/2017 Satisfied BRAGG_SD_2 Routine Compliance
 
Site Inspection 08/16/2017 In Compliance BRAGG_SD_2 0/1 Routine Compliance
 
Site Inspection 03/22/2016 In Compliance PAYNE_CL_1 0/1 Non-Compliance
 
Letter 12/17/2015 Satisfied WILSON_ML_1 Non-Compliance
 
Site Inspection 12/17/2015 Minor Out of Compliance PAYNE_CL_1 0/1 Routine Compliance
 
Emergency Preparedness Information 12/09/2015 Satisfied PAYNE_CL_1 Routine Compliance
 
Site Inspection 02/26/2014 In Compliance PAYNE_CL_1 0/1 Routine Compliance
 
Emergency Preparedness Information 02/20/2014 Satisfied PAYNE_CL_1 Routine Compliance
 
Site Inspection 09/20/2011 In Compliance TISSINGTON_AB_1 0/1 Routine Compliance
 
Emergency Preparedness Information 09/20/2011 Satisfied TISSINGTON_AB_1 Routine Compliance
 
Site Inspection 09/23/2010 In Compliance PORTER_AJ_1 0/1 Routine Compliance
 
Emergency Preparedness Information 09/23/2010 Satisfied PORTER_AJ_1 Routine Compliance
 
Site Inspection 01/12/2010 In Compliance PORTER_AJ_1 0/1 Routine Compliance
 
Letter 12/23/2009 Satisfied PIERCE_LL_1 Closure
 
Site Inspection 12/14/2009 In Compliance PORTER_AJ_1 0/3 Installation
 
Site Inspection 10/13/2009 In Compliance PORTER_AJ_1 0/3 Closure
 
Letter 11/04/2008 Satisfied STEVENSON_JS Non-Compliance
 
Emergency Preparedness Information 10/30/2008 Satisfied STEVENSON_JS Routine Compliance
 
Site Inspection 10/30/2008 Minor Out of Compliance STEVENSON_JS 0/3 Routine Compliance
 
Record Document 10/13/2008 Satisfied STEVENSON_JS Non-Compliance
 
Letter 02/20/2008 Satisfied STEVENSON_JS Non-Compliance
 
Site Inspection 02/18/2008 Minor Out of Compliance STEVENSON_JS 0/3 Routine Compliance
 
Site Inspection 06/22/2007 In Compliance STEVENSON_JS 0/3 Non-Compliance
 
Letter 06/22/2007 Satisfied STEVENSON_JS Non-Compliance
 
Site Inspection 03/28/2007 Major Out of Compliance STEVENSON_JS 0/3 Routine Compliance
 
Emergency Preparedness Information 02/07/2007 Satisfied TISSINGTON_AB_1 Routine Compliance
 
Emergency Preparedness Information 09/21/2006 Satisfied HALE_JS_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
No Open Violations Found
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
12/28/1988   COMPLETED