![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Escambia | Status | OPEN | ||||||||
ID | 8521140 | Latitude | 30° 27' 39.5616 | ||||||||
Name |
CIRCLE K #4918 2350 W MICHIGAN AVE |
Longitude | 87° 16' 46.7451 | ||||||||
PENSACOLA, FL 32505 | LL Method | DGPS | |||||||||
Contact | HEATHER GILMORE | LL Status | REVIEWED | ||||||||
Phone | (850) 549-2879 | Status Date | 10/10/2003 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 25 W CEDAR ST STE M Pensacola, FL 32502 |
Effective Date | 01/13/2010 | ||||||||
Contact | IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON | ||||||||||
Phone | (850) 454-1070 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 697405 - 06/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CIRCLE K STORES INC 25 W CEDAR ST STE M Pensacola, FL 32502 |
Effective Date | 01/13/2010 | ||||||||
Contact | IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON | ||||||||||
Phone | (850) 454-1070 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 20000 | Unleaded Gas (B) | 11/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 01/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 01/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 01/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
GUARANTEE | 04/30/2023 | 08/28/2024 | |||||||||
GUARANTEE | 04/25/2021 | 08/27/2022 | |||||||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2013 | 12/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2013 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/17/2009 | 12/01/2011 | CHUBB | ||||||||
INSURANCE | 12/17/2008 | 12/17/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
INSURANCE | 12/17/2007 | 12/17/2008 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 12/02/2005 | 12/02/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 10/31/2005 | 11/01/2005 | MINOR OUT-OF-COMPLIANCE | ARTHUR B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 07/19/2005 | 07/25/2005 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLATION OF NEW PIPING. | |||||||||||
TCI | 01/18/2005 | 01/26/2005 | IN-COMPLIANCE | ARTHUR B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/10/2005 | 01/10/2005 | COMPLIANCE ASSURANCE | ||||||||
TIN | 10/29/2004 | 11/03/2004 | IN-COMPLIANCE | ARTHUR B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY SUB PUMP HOUSEING HYDROSTATICALLY TESTED, TEST HOLDING WATER AT TIME OF INSPECTION. ADAMS TANK & LIFT PCC050767 | |||||||||||
TIN | 04/28/2004 | 05/04/2004 | MINOR OUT-OF-COMPLIANCE | ARTHUR B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 12/05/2003 | 12/11/2003 | IN-COMPLIANCE | ARTHUR B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/02/2003 | 10/07/2003 | MINOR OUT-OF-COMPLIANCE | ARTHUR B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 02/03/2003 | 02/25/2003 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/20/2002 | 11/26/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | JOHN S. STEVNESON | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/15/2002 | 02/18/2002 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/15/2001 | 12/12/2001 | MINOR OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 02/27/2001 | 03/13/2001 | IN-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 12/13/2000 | 12/28/2000 | MINOR OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/01/2000 | 02/09/2000 | STEVENOSN-JS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/21/1999 | 12/22/1999 | MINOR OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 05/14/2024 | Accepted | ELLIOTT_EV_1 | Enforcement | |||||||
Electronic Communication | 04/05/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Letter | 02/20/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Site Inspection | 02/20/2024 | Minor Out of Compliance | ELLIOTT_EV_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 02/14/2024 | Satisfied | ELLIOTT_EV_1 | Routine Compliance | |||||||
Letter | 04/21/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 04/21/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 04/12/2022 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Record Document | 03/09/2022 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Record Document | 02/04/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 02/03/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 02/03/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 02/02/2022 | Major Out of Compliance | GARTIN_D | 0/1 | Routine Compliance | ||||||
TCAR | 03/19/2021 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Document Management | 03/18/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 03/18/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 03/18/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Issue Document | 03/18/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Issue Document | 02/10/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 02/10/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 02/10/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Record Document | 02/08/2021 | Satisfied | BAVUSO_CX_1 | Compliance Assistance | |||||||
Site Inspection | 01/20/2021 | In Compliance | BAVUSO_CX_1 | 0/1 | Component Installation | ||||||
Letter | 01/13/2021 | Satisfied | WILSON_ML_1 | Component Installation | |||||||
Issue Document | 01/13/2021 | Satisfied | WILSON_ML_1 | Component Installation | |||||||
Electronic Communication | 12/11/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Letter | 12/10/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 12/10/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 12/09/2019 | Minor Out of Compliance | BRAGG_SD_2 | 0/1 | Routine Compliance | ||||||
Issue Document | 08/17/2017 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 08/16/2017 | Satisfied | BRAGG_SD_2 | Routine Compliance | |||||||
Site Inspection | 08/16/2017 | In Compliance | BRAGG_SD_2 | 0/1 | Routine Compliance | ||||||
Site Inspection | 03/22/2016 | In Compliance | PAYNE_CL_1 | 0/1 | Non-Compliance | ||||||
Letter | 12/17/2015 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 12/17/2015 | Minor Out of Compliance | PAYNE_CL_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/09/2015 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Site Inspection | 02/26/2014 | In Compliance | PAYNE_CL_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/20/2014 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Site Inspection | 09/20/2011 | In Compliance | TISSINGTON_AB_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/20/2011 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 09/23/2010 | In Compliance | PORTER_AJ_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/23/2010 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Site Inspection | 01/12/2010 | In Compliance | PORTER_AJ_1 | 0/1 | Routine Compliance | ||||||
Letter | 12/23/2009 | Satisfied | PIERCE_LL_1 | Closure | |||||||
Site Inspection | 12/14/2009 | In Compliance | PORTER_AJ_1 | 0/3 | Installation | ||||||
Site Inspection | 10/13/2009 | In Compliance | PORTER_AJ_1 | 0/3 | Closure | ||||||
Letter | 11/04/2008 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Emergency Preparedness Information | 10/30/2008 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
Site Inspection | 10/30/2008 | Minor Out of Compliance | STEVENSON_JS | 0/3 | Routine Compliance | ||||||
Record Document | 10/13/2008 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Letter | 02/20/2008 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 02/18/2008 | Minor Out of Compliance | STEVENSON_JS | 0/3 | Routine Compliance | ||||||
Site Inspection | 06/22/2007 | In Compliance | STEVENSON_JS | 0/3 | Non-Compliance | ||||||
Letter | 06/22/2007 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 03/28/2007 | Major Out of Compliance | STEVENSON_JS | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | HALE_JS_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/28/1988 | COMPLETED | ||||||||||