![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8521205 | Latitude | 30° 10' 27.9499 | ||||||||
Name |
RITZ FOOD STORE #21- FORMER 2708 E 15TH ST |
Longitude | 85° 37' 29.2498 | ||||||||
PANAMA CITY, FL 32405-6354 | LL Method | DPHO | |||||||||
Contact | JOHN STARLING | LL Status | REVIEWED | ||||||||
Phone | (850) 832-0345 | Status Date | 10/30/2018 | ||||||||
Account Owner Information | |||||||||||
Name | STARLING OIL CO PO BOX 231 PANAMA CITY, FL 32402-231 |
Effective Date | 05/11/2022 | ||||||||
Contact | JOHN STARLING SR | ||||||||||
Phone | (850) 832-0345 | ||||||||||
JOHN@FWS.FISH | |||||||||||
Placard # / Date | 672067 - 01/31/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | STARLING OIL CO PO BOX 231 PANAMA CITY, FL 32402-231 |
Effective Date | 08/17/2007 | ||||||||
Contact | JOHN STARLING SR | ||||||||||
Phone | (850) 832-0345 | ||||||||||
JOHN@FWS.FISH | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Vehicular Diesel (D) | 09/01/1985 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (D) External protective coating (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Unleaded Gas (B) | 09/01/1985 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (D) External protective coating (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 8000 | Unleaded Gas (B) | 09/01/1985 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (D) External protective coating (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Ethanol E10 (8) | 08/01/2007 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 15000 | Ethanol E10 (8) | 08/01/2007 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 3000 | Unknown/Not Reported (Y) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 3000 | Unknown/Not Reported (Y) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 01/01/2020 | 01/01/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/01/2019 | 01/01/2020 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/01/2016 | 01/01/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/01/2013 | 01/01/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/01/2011 | 01/01/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/01/2010 | 01/01/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/01/2009 | 01/01/2010 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 11/08/2005 | 11/16/2005 | IN-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/08/2004 | 11/09/2004 | IN-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS | |||||||||||
RRBD | 07/22/2004 | 07/22/2004 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 07/07/2004 | 07/12/2004 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS | |||||||||||
TXI | 05/24/2004 | 06/01/2004 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS, CLOSURE OF TWO DISPENSERS | |||||||||||
RRBD | 12/22/2003 | 05/14/2004 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INF FOR CRACKED SPILL BUCKETS ANSWERED BY RRBD (LCSR) PER GUIDANCE CURRENT IN 12/03. | |||||||||||
TCR | 12/22/2003 | 12/30/2003 | IN-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS | |||||||||||
IRFR | 12/16/2003 | 12/16/2003 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INF FOR CRACKED SPILL BUCKETS. | |||||||||||
IRFR | 12/11/2003 | 12/12/2003 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INF FOR FAILED ATG TANK LEAK TEST. | |||||||||||
DSNR | 12/11/2003 | 12/12/2003 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DSNR--CONTRACTOR CHECKED/FIXED ATG; PASSING SUBSEQUENT ATG LEAK TESTS. | |||||||||||
TCI | 11/26/2003 | 12/01/2003 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS | |||||||||||
TCI | 11/25/2002 | 11/27/2002 | IN-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/05/2001 | 12/07/2001 | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/27/2001 | 11/28/2001 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/29/2000 | 12/01/2000 | IN-COMPLIANCE | BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/30/1999 | 12/01/1999 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 04/11/2025 | Satisfied | MERRITT_S | Enforcement | |||||||
Electronic Communication | 03/26/2025 | Satisfied | MERRITT_S | Enforcement | |||||||
Electronic Communication | 10/25/2024 | Satisfied | PROFFITT_B | Routine Compliance | |||||||
Letter | 05/06/2024 | Satisfied | BONDS_M | Enforcement | |||||||
Letter | 04/22/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Enforcement Referral | 04/22/2024 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Site Inspection | 04/05/2024 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 04/04/2024 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Phone Conversation | 06/26/2023 | Satisfied | MATHERLY_H | Enforcement | |||||||
Electronic Communication | 06/22/2023 | Satisfied | MATHERLY_H | Enforcement | |||||||
Phone Conversation | 05/18/2023 | Satisfied | MATHERLY_H | Enforcement | |||||||
Letter | 07/18/2022 | Satisfied | MATHERLY_H | Enforcement | |||||||
Enforcement Referral | 07/13/2022 | Accepted | WILSON_ML_1 | Enforcement | |||||||
Issue Document | 03/31/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 03/31/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 03/25/2022 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 03/25/2022 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Enforcement Tracking | 11/17/2020 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Electronic Communication | 03/02/2020 | Satisfied | THROCKMORTON_JN | Enforcement | |||||||
Enforcement Referral | 09/16/2019 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Phone Conversation | 08/08/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 08/06/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 08/06/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 05/15/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 05/15/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 05/14/2019 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 05/14/2019 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 10/25/2018 | In Compliance | WILSON_ML_1 | 0/2 | Complaint | ||||||
Site Inspection | 06/07/2016 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Record Document | 12/07/2015 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Electronic Communication | 12/13/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 10/18/2013 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 10/17/2013 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/17/2013 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 09/22/2011 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/20/2011 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 09/17/2010 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/31/2009 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 08/31/2009 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 07/28/2008 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/24/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 05/19/2008 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/17/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 11/08/2007 | In Compliance | BRAZILE_DO_1 | 0/2 | Installation | ||||||
Site Inspection | 10/02/2007 | In Compliance | BRAZILE_DO_1 | 0/5 | Closure | ||||||
Record Document | 06/27/2007 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 01/25/2007 | Major Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Letter | 01/25/2007 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/26/2006 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
04/04/2024 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Per the Facility Owner, they are unable to get insurance for the out of service tanks. The UST System is now required to be properly closed. Contact the inspector a minimum of 30 days prior to closure of the UST System. Closure Sampling may be required for the tank, spill buckets, STP sumps, underground piping and dispenser sumps. Email: Muhammad.Khan@FLHealth.gov | |||||||
03/31/2022 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Obtain Financial Responsibility and submit the current FDEP Financial Mechanism Forms for the 2 underground storage tanks that are currently registered as out-of-service. If Financial Responsibility cannot be obtained, the underground storage tank systems will be required to be closed pursuant to subsection 62-761.800(2)(a)3 A storage tank system where financial responsibility is not maintained and demonstrated, pursuant to Rule 62-761.420, F.A.C., within 90 days of termination of the financial mechanism. Please note the closure must meet the full requirements listed in Rule 62-761.800. Submit either the current FDEP Financial Mechanism Forms or the appropriate notification and paperwork to properly close the tank. Email: Muhammad.Khan@FLHealth.gov | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
10/22/1998 | ACTIVE | 30 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
06/22/1994 | INACTIVE | 30 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | CLAWSON_RL_1 | |||||||