![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Pasco | Status | OPEN | ||||||||
ID | 8521243 | Latitude | 28° 11' 15.554 | ||||||||
Name |
BP BONITA #317 1937 US HWY 19 |
Longitude | 82° 44' 26.6104 | ||||||||
HOLIDAY, FL 34691-5540 | LL Method | DPHO | |||||||||
Contact | BILL MICKLE | LL Status | REVIEWED | ||||||||
Phone | (727) 392-0078 | Status Date | 08/25/2003 | ||||||||
Account Owner Information | |||||||||||
Name | MICKLE WILLIAM JR 11406 47TH AVE N SAINT PETERSBURG, FL 33708-2704 |
Effective Date | 01/07/2022 | ||||||||
Contact | BILL MICKLE | ||||||||||
Phone | (727) 392-0078 | ||||||||||
BILLMICKLEJR@GMAIL.COM | |||||||||||
Placard # / Date | 671225 - 10/20/2023 | ||||||||||
Property Owner Information | |||||||||||
Name | MICKLE WILLIAM JR 11406 47TH AVE N SAINT PETERSBURG, FL 33708-2704 |
Effective Date | 01/07/2022 | ||||||||
Contact | BILL MICKLE | ||||||||||
Phone | (727) 392-0078 | ||||||||||
BILLMICKLEJR@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 01/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 01/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 01/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Unleaded Gas (B) | 01/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 20000 | Unleaded Gas (B) | 03/01/2010 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
NONE | |||||||||||
INSURANCE | 03/17/2019 | 03/17/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 03/17/2018 | 03/17/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 03/17/2017 | 03/17/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 03/17/2016 | 03/17/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 03/17/2015 | 03/17/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 03/17/2013 | 03/17/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 03/17/2013 | 03/17/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 03/17/2011 | 03/17/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 03/17/2010 | 03/17/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 03/17/2009 | 03/17/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/31/2008 | 12/31/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 02/16/2006 | 02/16/2006 | IN-COMPLIANCE | CONDOLEON, G J | 0/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 12/27/2005 | 12/28/2005 | CONDOLEON, G J | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/20/2005 | 12/28/2005 | MINOR OUT-OF-COMPLIANCE | CONDOLEON, G J | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 08/09/2004 | 08/27/2004 | MINOR OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 09/03/2003 | 09/26/2003 | MINOR OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 12/16/2002 | 12/19/2002 | IN-COMPLIANCE | HANSEN, DAVID | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 10/17/2002 | 10/23/2002 | MINOR OUT-OF-COMPLIANCE | HANSEN, DAVID | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 02/06/2002 | 02/13/2002 | IN-COMPLIANCE | HANSEN, DAVID | 0/4 | COMPLIANCE ASSURANCE | |||||
NCLI | 12/20/2001 | 12/26/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 12/20/2001 | 12/26/2001 | MINOR OUT-OF-COMPLIANCE | HANSEN, DAVID | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 02/13/2001 | 02/13/2001 | IN-COMPLIANCE | HARRIS | 0/4 | COMPLIANCE ASSURANCE | |||||
NCLI | 01/18/2001 | 01/18/2001 | HARRIS | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCR | 01/12/2001 | 01/18/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | HARRIS | 0/4 | COMPLIANCE ASSURANCE | |||||
NCLI | 10/18/2000 | 10/18/2000 | HARRIS | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/13/2000 | 10/18/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | HARRIS | 0/4 | COMPLIANCE ASSURANCE | |||||
NCLI | 09/08/1999 | 09/08/1999 | PETERSON | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/02/1999 | 09/08/1999 | MINOR OUT-OF-COMPLIANCE | PETERSON | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 02/15/1999 | 03/12/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | PETERSON_JE | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Tracking | 03/19/2025 | Closed Without Enforcement | PEDIGO_L | Enforcement | |||||||
Enforcement Referral | 03/19/2025 | Accepted | TUCKER_SX_1 | Enforcement | |||||||
Site Inspection | 03/13/2024 | Major Out of Compliance | JUARISTIC_GK_1 | 0/1 | Routine Compliance | ||||||
Letter | 03/13/2024 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 07/14/2023 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Letter | 08/31/2022 | Satisfied | PEDIGO_L | Enforcement | |||||||
Enforcement Referral | 08/09/2022 | Accepted | JUARISTIC_GK_1 | Enforcement | |||||||
Electronic Communication | 07/19/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 06/08/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 06/08/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 05/26/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Site Inspection | 05/16/2022 | Major Out of Compliance | JUARISTIC_GK_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 05/09/2022 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Electronic Communication | 10/11/2021 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Record Document | 09/25/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 09/25/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 09/18/2019 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Site Inspection | 09/18/2019 | Major Out of Compliance | JUARISTIC_GK_1 | 0/1 | Routine Compliance | ||||||
Letter | 09/18/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 07/09/2019 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Site Inspection | 03/27/2017 | In Compliance | JUARISTIC_GK_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 03/27/2017 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Electronic Communication | 03/13/2017 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Record Document | 06/09/2015 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 06/09/2015 | In Compliance | STRAUSS_RH_1 | 0/1 | Non-Compliance | ||||||
Electronic Communication | 06/09/2015 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 05/28/2015 | Major Out of Compliance | STRAUSS_RH_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 05/28/2015 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 05/28/2015 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 08/30/2013 | In Compliance | SOWERS_JA_1 | 0/1 | Non-Compliance | ||||||
Electronic Communication | 08/30/2013 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Record Document | 08/20/2013 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Record Document | 08/20/2013 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Electronic Communication | 08/20/2013 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Site Inspection | 08/08/2013 | Minor Out of Compliance | SOWERS_JA_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/08/2013 | Satisfied | SOWERS_JA_1 | Routine Compliance | |||||||
Letter | 08/08/2013 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Document Management | 10/28/2011 | Complete | PEDIGO_L | Discharge | |||||||
Discharge Reporting | 10/28/2011 | Satisfied | PEDIGO_L | Discharge | |||||||
Site Inspection | 08/17/2011 | In Compliance | CONDOLEON_GJ_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/17/2011 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Site Inspection | 09/23/2010 | In Compliance | CONDOLEON_GJ_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/23/2010 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
TCAR | 05/07/2010 | Satisfied | CONDOLEON_GJ_1 | Closure | |||||||
Letter | 05/07/2010 | Satisfied | CONDOLEON_GJ_1 | Closure | |||||||
Record Document | 03/25/2010 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Letter | 03/22/2010 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 03/22/2010 | Major Out of Compliance | CONDOLEON_GJ_1 | 0/1 | Installation | ||||||
Letter | 03/03/2010 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 03/03/2010 | Major Out of Compliance | CONDOLEON_GJ_1 | 0/4 | Closure | ||||||
Site Inspection | 03/02/2010 | Major Out of Compliance | CONDOLEON_GJ_1 | 0/4 | Closure | ||||||
Phone Conversation | 02/12/2010 | Satisfied | CONDOLEON_GJ_1 | Closure | |||||||
Meeting | 12/09/2009 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Site Inspection | 10/23/2009 | In Compliance | CONDOLEON_GJ_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/22/2009 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Site Inspection | 11/25/2008 | In Compliance | CONDOLEON_GJ_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 11/25/2008 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Record Document | 07/16/2008 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Letter | 11/24/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 11/24/2007 | Minor Out of Compliance | CONDOLEON_GJ_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 11/19/2007 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Letter | 11/21/2006 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 10/25/2006 | Minor Out of Compliance | CONDOLEON_GJ_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/20/2006 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/13/2024 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Submit documentation showing that the tank interstice has been visually inspected at least once every 12 months since the tank has been out-of-service. Was due by 6/8/2023. | |||||||
05/16/2022 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Permanently close FDEP Tank ID 5. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
02/26/2010 | COMPLETED | ||||||||||
11/30/1988 | COMPLETED | 85 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||