Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 01/22/2025 Last Data Refresh: 01/21/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 8521372 | Latitude | 30° 18' 51.3409 | ||||||||
Name |
JACKSONVILLE 76 PETROLEUM LLC RAMONA 5971 RAMONA BLVD |
Longitude | 81° 45' 4.9454 | ||||||||
JACKSONVILLE, FL 32205-4755 | LL Method | DPHO | |||||||||
Contact | HANI BASKARON | LL Status | REVIEWED | ||||||||
Phone | (714) 794-7630 | Status Date | 11/18/2003 | ||||||||
Account Owner Information | |||||||||||
Name | JACKSONVILLE 76 PETROLEUM LLC 780 E RAMSEY ST BANNING, CA 92220 |
Effective Date | 12/15/2020 | ||||||||
Contact | HANI BASKARON | ||||||||||
Phone | (714) 794-7630 | ||||||||||
HSBPETRO@YAHOO.COM | |||||||||||
Placard # / Date | 694757 - 06/25/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | BLUE HILLS PRTNRS 101 MARKETSIDE AVE SUITE 404 PMB 234 PONTE VEDRA, FL 32081 |
Effective Date | 11/20/2023 | ||||||||
Contact | DARLEEN ROLLAR | ||||||||||
Phone | (206) 779-1109 | ||||||||||
DMROLLAR@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 12000 | Unleaded Gas (B) | 05/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 12000 | Vehicular Diesel (D) | 05/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 05/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 05/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 05/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Vehicular Diesel (D) | 05/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||||
INSURANCE | 11/13/2022 | 11/13/2023 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 11/13/2021 | 11/13/2022 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 11/13/2020 | 11/13/2021 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 08/29/2020 | 08/29/2021 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 08/17/2019 | 08/17/2020 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 08/17/2018 | 08/17/2019 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/18/2017 | 12/18/2018 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/18/2016 | 12/18/2017 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/12/2016 | 12/12/2017 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/23/2014 | 04/23/2016 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 04/23/2013 | 04/23/2014 | AMERICAN SAFETY | ||||||||
INSURANCE | 04/02/2012 | 04/02/2013 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2011 | 04/02/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2010 | 04/02/2011 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2009 | 04/02/2010 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 09/13/2005 | 09/14/2005 | IN-COMPLIANCE | HOLLOWAY | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 02/18/2005 | 02/23/2005 | IN-COMPLIANCE | HOLLOWAY | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 05/20/2004 | 05/21/2004 | IN-COMPLIANCE | HOLLOWAY_R | 0/4 | COMPLIANCE ASSURANCE | |||||
CNLI | 04/06/2004 | 04/06/2004 | BLACKMON | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes SURFA LETTER | |||||||||||
TDI | 04/05/2004 | 05/07/2004 | IN-COMPLIANCE | GRIFFIN_T | 0/0 | DISCHARGE PROJECT | |||||
DCCR | 04/05/2004 | 04/06/2004 | GRIFFIN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DCCR AS A RESULT OF FILE NOTE FROM NATASHA LAMPKIN TO ALLENE MCINTOSH | |||||||||||
DRFR | 02/18/2004 | 03/23/2004 | GRIFFIN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DRF FILED AS A RESULT OF PHASE II. DISCHARGE DATE DETERMINED TO BE 6/07/01 | |||||||||||
TDI | 02/18/2004 | 04/06/2004 | IN-COMPLIANCE | GRIFFIN | 0/0 | DISCHARGE PROJECT | |||||
Completion Notes TDI PAPERWORK ONLY | |||||||||||
TCI | 01/21/2003 | 01/23/2003 | IN-COMPLIANCE | GRIFFIN_T | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 01/15/2002 | 03/05/2002 | IN-COMPLIANCE | CARROLL_A | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 10/25/2001 | 10/31/2001 | MINOR OUT-OF-COMPLIANCE | CARROLL_A | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/13/2001 | 02/15/2001 | CARROLL_A | 0/4 | COMPLIANCE ASSURANCE | ||||||
RRBD | 02/12/2001 | 02/12/2001 | CUMMINGS_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 01/25/2001 | 01/29/2001 | CUMMINGS_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/24/2001 | 01/25/2001 | MINOR OUT-OF-COMPLIANCE | CARROLL_A | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO CP RECORDS | |||||||||||
CRDE | 02/24/2000 | 03/07/2000 | HOFFMAN_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
CRDE | 01/27/2000 | 01/31/2000 | HOFFMAN_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/07/2000 | 01/26/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | CARROLL_A | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO INSURANCE/SOIL TOUCHING STP PUMPS AND FLEX CONNECTORS=FAILURE TO UPGRADE/MISSING MONTHLY MAINTENANCE RECORDS | |||||||||||
NCLI | 01/07/2000 | 01/26/2000 | CARROLL_A | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes .400(3) .510(2)D .710(2) | |||||||||||
WLI | 12/10/1998 | 12/17/1998 | TORSANKO_G | 0/0 | COMPLIANCE ASSURANCE | ||||||
UTCI | 10/14/1998 | 10/28/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 11/28/2023 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 11/16/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Electronic Communication | 10/27/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Electronic Communication | 09/12/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Letter | 08/28/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Site Inspection | 08/28/2023 | Major Out of Compliance | CHRISTIAN_ED_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 07/21/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Electronic Communication | 07/21/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Enforcement Tracking | 02/10/2022 | Closed Without Enforcement | HARRIS_SB | Enforcement | |||||||
Letter | 02/10/2022 | Satisfied | HARRIS_SB | Enforcement | |||||||
Incident | 01/05/2022 | Has not led to Discharge | VALENZUELA_S_1 | Incident | |||||||
Incident | 01/05/2022 | Has not led to Discharge | VALENZUELA_S_1 | Incident | |||||||
Letter | 11/30/2021 | Satisfied | VALENZUELA_S_1 | Compliance Assistance | |||||||
Site Inspection | 11/30/2021 | Major Out of Compliance | VALENZUELA_S_1 | 0/2 | Compliance Assistance | ||||||
Document Management | 11/29/2021 | Satisfied | VALENZUELA_S_1 | Incident | |||||||
Document Management | 11/29/2021 | Satisfied | VALENZUELA_S_1 | Incident | |||||||
Enforcement Referral | 11/22/2021 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 11/09/2021 | Satisfied | VALENZUELA_S_1 | Compliance Assistance | |||||||
Electronic Communication | 11/05/2021 | Satisfied | VALENZUELA_S_1 | Compliance Assistance | |||||||
Electronic Communication | 09/20/2021 | Satisfied | VALENZUELA_S_1 | Compliance Assistance | |||||||
Letter | 08/26/2021 | Satisfied | VALENZUELA_S_1 | Compliance Assistance | |||||||
Site Inspection | 08/26/2021 | Minor Out of Compliance | VALENZUELA_S_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 08/17/2021 | Satisfied | VALENZUELA_S_1 | Routine Compliance | |||||||
Letter | 08/20/2019 | Satisfied | MONDO_PW_1 | Routine Compliance | |||||||
Site Inspection | 08/20/2019 | In Compliance | MONDO_PW_1 | 0/2 | Routine Compliance | ||||||
Letter | 02/06/2019 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Site Inspection | 02/06/2019 | Minor Out of Compliance | GREGORY_HM_1 | 0/2 | Compliance Assistance | ||||||
Enforcement Tracking | 11/06/2017 | Closed Without Enforcement | OBRIEN_S | Enforcement | |||||||
Letter | 11/06/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Electronic Communication | 10/09/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Enforcement Referral | 09/26/2017 | Accepted | RICHARDS_JE_1 | Enforcement | |||||||
Electronic Communication | 09/21/2017 | Satisfied | DOHANEY_T | Compliance Assistance | |||||||
Electronic Communication | 09/14/2017 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Electronic Communication | 09/14/2017 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Letter | 06/23/2017 | Satisfied | RICHARDS_JE_1 | Compliance Assistance | |||||||
Electronic Communication | 03/20/2017 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Letter | 03/16/2017 | Satisfied | GREGORY_HM_1 | Non-Compliance | |||||||
Site Inspection | 03/15/2017 | Minor Out of Compliance | GREGORY_HM_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 03/14/2017 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Site Inspection | 07/22/2015 | In Compliance | HILL_KL_1 | 0/2 | Non-Compliance | ||||||
Electronic Communication | 07/22/2015 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Electronic Communication | 06/29/2015 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Letter | 05/07/2015 | Satisfied | MAYOR_AK_1 | Non-Compliance | |||||||
Electronic Communication | 05/05/2015 | Satisfied | MAYOR_AK_1 | Routine Compliance | |||||||
Site Inspection | 05/05/2015 | Minor Out of Compliance | MAYOR_AK_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 09/06/2013 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Electronic Communication | 09/05/2013 | Satisfied | WILLIAMS_AK_1 | Non-Compliance | |||||||
Letter | 09/04/2013 | Satisfied | WILLIAMS_AK_1 | Non-Compliance | |||||||
Site Inspection | 09/03/2013 | Minor Out of Compliance | WILLIAMS_AK_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/29/2013 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Site Inspection | 10/25/2011 | In Compliance | CAIN_M_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 08/27/2010 | In Compliance | BORISADE_KA_1 | 0/2 | Routine Compliance | ||||||
Record Document | 10/12/2009 | Satisfied | PARISH_KM_1 | Non-Compliance | |||||||
Record Document | 10/02/2009 | Satisfied | GRIFFIN_TW_1 | Non-Compliance | |||||||
Letter | 09/15/2009 | Satisfied | PARISH_KM_1 | Non-Compliance | |||||||
Site Inspection | 08/20/2009 | In Compliance | PARISH_KM_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 06/15/2009 | In Compliance | LUNN_RJ_1 | 0/2 | Installation | ||||||
Letter | 06/08/2009 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
TCAR | 06/08/2009 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
Site Inspection | 03/31/2009 | In Compliance | LUNN_RJ_1 | 0/4 | Closure | ||||||
Site Inspection | 08/05/2008 | In Compliance | WILLIAMS_AK_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/13/2008 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Site Inspection | 09/20/2007 | In Compliance | PARISH_KM_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/11/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Site Inspection | 12/14/2006 | In Compliance | HOLLOWAY_RW_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/23/2006 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
08/28/2023 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Facility must provide current testing for all overfill protection devices. | |||||||
08/23/2023 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | Submit 2022-2023 Part C/D Financial Responsibility Documentation. Submit 2021, 2022, and 2023 Part P Financial Responsibility Documentation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/07/2001 | COMPLETED | 56 | |||||||||
05/08/1987 | COMPLETED | 56 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||