DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northeast   Type    Local Government
 
County Duval   Status    OPEN
 
ID 8521404   Latitude    30° 19' 56.4132
 
Name JACKSONVILLE TRANSPORTATION AUTH
100 N MYRTLE AVE
Longitude    81° 40' 45.2172
  JACKSONVILLE, FL 32204-1310 LL Method    DPHO
 
Contact VAN DIKE WALKER   LL Status    REVIEWED
 
Phone (904) 633-8518   Status Date    07/28/2009
 
Account Owner Information
 
Name JACKSONVILLE TRANSPORTATION AUTH
100 N MYRTLE AVE
JACKSONVILLE, FL 32203-455
Effective Date    11/27/1985
 
Contact GARY AYER
 
Phone (904) 463-1746
 
Email GAYER@JTAFLA.COM
  Placard # / Date    701438 - 09/18/2024
Property Owner Information
 
Name JACKSONVILLE TRANSPORTATION AUTH
100 N MYRTLE AVE
JACKSONVILLE, FL 32203-455
Effective Date    05/09/2001
 
Contact GARY AYER
 
Phone (904) 463-1746
 
Email GAYER@JTAFLA.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
13 650 Emerg Generator Diesel (G) 05/01/2000 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(I) Suction piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
14 50000 Vehicular Diesel (D) 02/01/2005 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(J) Monitor piping/liner space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
15 50000 Vehicular Diesel (D) 02/01/2005 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(J) Monitor piping/liner space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
16 50000 Vehicular Diesel (D) 02/01/2005 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(J) Monitor piping/liner space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
17 50000 Vehicular Diesel (D) 02/01/2005 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(J) Monitor piping/liner space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
18 50000 Vehicular Diesel (D) 02/01/2005 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(J) Monitor piping/liner space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
19 50000 Vehicular Diesel (D) 02/01/2005 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(J) Monitor piping/liner space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
20R 20000 Unleaded Gas (B) 04/28/2015 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(G) Sacrificial anode CP
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(F) Double wall
(I) Suction piping system
(K) Dispenser liners
(L) Bulk product system
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(D) SPCC Plan
(E) Monitor UST/liner space
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
(T) Annual tightness test/Inventory
 
 
Tank Tank Size Content Installed Placement Status
22 1000 New/Lube Oil (O) 09/01/2013 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(I) Suction piping system
(D) SPCC Plan
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
10 2000 Misc Petrol-Based Product (X) 07/01/1979 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(E) Fiberglass  
 
 
Tank Tank Size Content Installed Placement Status
11 2000 Misc Petrol-Based Product (X) 07/01/1979 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(E) Fiberglass  
 
 
Tank Tank Size Content Installed Placement Status
11R 2000 Waste Oil (L) 01/01/2001 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(F) Monitor dbl wall tank space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
12 2000 Other Non Regulated (Z) 07/01/1979 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(C) Steel
(E) Fiberglass
  (A) Abv, no soil contact
(D) External protective coating
(8) Manually sampled wells
(I) Not required
 
 
Tank Tank Size Content Installed Placement Status
2 10000 New/Lube Oil (O) 09/01/1980 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
  (D) External protective coating (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
20 10000 Unleaded Gas (B) 02/01/2005 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(J) Monitor piping/liner space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
21 550 Petroleum Additive (W) 07/01/1997 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
 
 
 
Tank Tank Size Content Installed Placement Status
3 6000 Vehicular Diesel (D) 09/01/1980 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
(P) Level gauges/alarms
  (C) Fiberglass
(F) Double wall
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
4 6000 Unleaded Gas (B) 09/01/1980 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
(P) Level gauges/alarms
  (C) Fiberglass
(F) Double wall
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
5 10000 New/Lube Oil (O) 07/01/1979 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
  (F) Double wall
(Z) DEP approved piping
(8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
6 2000 Misc Petrol-Based Product (X) 07/01/1979 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(E) Fiberglass   (D) External protective coating (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
7 2000 Waste Oil (L) 07/01/1979 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(E) Fiberglass  
 
 
Tank Tank Size Content Installed Placement Status
8 500000 Vehicular Diesel (D) 07/01/1979 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(C) Fiberglass
(D) External protective coating
(F) Double wall
(I) Suction piping system
(K) Dispenser liners
(L) Bulk product system
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
9 12000 Gasohol (C) 04/01/1986 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(E) Fiberglass   (D) External protective coating (8) Manually sampled wells
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY  
INSURANCE   04/06/2024 04/06/2025 COMMERCE AND INDUSTRY INSURANCE COMPANY
INSURANCE   04/06/2020 04/06/2021 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   04/06/2019 04/06/2020 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   04/06/2018 04/06/2019 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   04/06/2017 04/06/2018 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   04/06/2016 04/06/2017 ADMIRAL INSURANCE COMPANY
INSURANCE   04/06/2015 04/06/2016 ADMIRAL INSURANCE COMPANY
INSURANCE   04/06/2013 04/06/2014 ADMIRAL INSURANCE COMPANY
INSURANCE   04/06/2011 04/06/2012 ENDURANCE AMERICAN SPECIALTY INS CO
INSURANCE   04/06/2009 04/06/2010 ENDURANCE AMERICAN SPECIALTY INS CO
INSURANCE   04/06/2009 04/06/2010 ENDURANCE AMERICAN SPECIALTY INS CO
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
LTR 02/28/2006 03/02/2006 ALLEN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING SUMP CLOSURE INSPECTION.
 
TXI 02/17/2006 02/21/2006 IN-COMPLIANCE CARROLL 8/2 COMPLIANCE ASSURANCE
 
 Completion Notes CLOSED ONE PIPING SUMP.
 
RRBD 10/25/2005 10/10/2005 COMPLIANCE ASSURANCE
 
REX 10/10/2005 09/16/2005 LUBINSKI 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes AEROSTAR SAKED FOR MORE TIME TO INSTALL RD FOR UST-12. GRANTED.
 
TEQA 08/04/2005 08/23/2005 SIGNIFICANT OUT-OF-COMPLIANCE LUBINSKI_D 8/2 COMPLIANCE ASSURANCE
 
 Completion Notes ENFORCEMENT QA INSPECTION CONDUCTED AFTER REFERRAL.
 
LTR 07/29/2005 08/08/2005 GRIFFIN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes RESPONSE TO NCLI_CORRECTIVE ACTIONS TO BE TAKEN
 
CALL 07/26/2005 07/26/2005 GRIFFIN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes CALL TO PAUL AT AEROSTAR. TCAR WILL BE SENT THIS WEEK.
 
CRDE 07/06/2005 07/07/2005 GRIFFIN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes REFERRED FOR VIOL SNCB 1066 & 1067; MNC 1115; SNCA 1075
 
NCLI 07/05/2005 07/02/2005 SPELLS 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes NCL SNCA LETTER FOR VIOL 1075, 1066, 1067, 1115.
 
TCI 06/24/2005 06/28/2005 SIGNIFICANT OUT-OF-COMPLIANCE CARROLL 8/2 COMPLIANCE ASSURANCE
 
IKPC 05/31/2005 01/20/2005 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes SEP COMPLETED. CASE CLOSED.
 
TIN 05/26/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes SYSTEM OPERATIONAL
 
TIV 05/12/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes PAINTING CORROSION PROTECTION ON STEEL PIPING, VALVES, AND FILLING COMPLETE
 
TCI 05/06/2005 05/24/2005 IN-COMPLIANCE CARROLL 7/2 COMPLIANCE ASSURANCE
 
TIV 04/27/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes SAME
 
LTR 04/26/2005 04/27/2005 ALLEN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes TANKS & PIPING REMOVAL.
 
TIV 04/07/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes SAME
 
TXI 04/01/2005 04/25/2005 IN-COMPLIANCE CARROLL_A 1/3 COMPLIANCE ASSURANCE
 
 Completion Notes REMOVED (TANK #8) 500K AST BULK DIESEL, CLOSED IN PLACE TANKS #1,3,4 (FILLED WITH FOAM). THE UNDERGROUND DIESEL AND GASOLINE PIPING WAS CLOSED IN PLACE. LIMITED CLOSURE ASSESSMENT REQUIRED. VIOLATIONS #80/2064 AND 165/2127 HAVE BEEN CORRECTED
 
TIV 03/21/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes SAME
 
TIV 03/10/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes PAVING AND ELECTRICAL
 
TIV 02/25/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes SAME- TANKNOLOGY TESTED ONE DIESEL LINE
 
TIV 02/15/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes BACKFILLING IN TRENCHES- ELECTRICAL WORKING
 
TIV 02/12/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes REMOVING CONCRETE- AIR TEST ON LINES PRIMARY 50 PSI, 5 PSI SECONDARY
 
TIV 02/10/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes DIESEL DISPENSER LINER AND ELECTRICAL BEING INSTALLED
 
CALL 02/07/2005 02/07/2005 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes DISCUSSED STATUS OF SEP WITH FACILITY'S CONSULTANT. SEP SHOULD BE COMPLETED AHEAD OF SCHEDULED COMPLETION DATE OF 2/28/05.
 
TIV 01/31/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING FROM 500K AST HAS BEEN CONNECTED TO THE 3 DSL LINES. TO BE REMOVED LATER
 
TIV 01/27/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes SAME
 
TIV 01/24/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes INSTALLED DISPENSER LINERS TO GASOLINE AND DIESEL.
 
TIV 01/21/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes SAME
 
TIV 01/20/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes CONTRACTOR WANTED TO RUN A TEMPORARY SINGLE WALL PIPE TO DIESEL DISPENSER FOR SUPERBOWL. SUPERVISOR WAS MADE AWARE
 
TIV 01/19/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes DIESEL DISPENSER LINER BEING INSTALLED AND PEA GRAVEL IN PIPING TRENCH. PAVED WHERE BUSES NEEDED TO CROSS
 
TIV 01/14/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes PEA GRAVEL INSTALLED UNDER PIPING 4" DEEP
 
TIV 01/11/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes REMOVED MOST OF THE ROCK FROM UNDER PIPING
 
TIV 01/10/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes INSTALLED PIPING, BACKFILLED WITH UNAPPROVED MATERIAL. AIR AND HYDRO TEST GOOD
 
TIV 01/07/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes CUTTING CONCRETE TO INSTALL NEW DOUBLE WALLED AMERON FIBERGLASS PIPING
 
TII 01/05/2005 06/02/2005 IN-COMPLIANCE CARROLL_A 7/0 COMPLIANCE ASSURANCE
 
 Completion Notes INSTALLED 6 50K GAL HORIZONTAL DOUBLE WALLED TANKS AND 1 10K GAL DOUBLE WALLED TANK. TANK SET INSIDE CONTAINMENT
 
LTR 07/26/2004 07/26/2004 TORSANKO_G 0/0 DISCHARGE PROJECT
 
 Completion Notes REC'D FROM STATE 7-26-04
 
TCI 06/16/2004 06/17/2004 SIGNIFICANT OUT-OF-COMPLIANCE YATES_R 2/4 COMPLIANCE ASSURANCE
 
 Completion Notes 80 & 165 VIOLATIONS ARE STILL OPEN.
 
TCR 06/16/2004 06/17/2004 IN-COMPLIANCE YATES_R 2/4 COMPLIANCE ASSURANCE
 
 Completion Notes 3,17,70,86,87,108,142,144,149,155,157 VIOLATIONS CLOSED.
 
LTR 06/15/2004 06/16/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes COPY OF EXECUTED CO SENT TO FACILITY WITH DEADLINES
 
COE 06/14/2004 06/16/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes LONG CONSENT ORDER EXECUTED WITH COMPLIANCE PLAN FOR SEP
 
IRFR 06/11/2004 07/26/2004 TORSANKO_G 0/0 DISCHARGE PROJECT
 
 Completion Notes TRANSFER OPERATIONAL SPILL - REC'D INF FROM STATE 7-26-04
 
RRBD 06/04/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL RESPONSE FROM DAWN BLACKLEDGE CONFIRMING ACCURACY OF CONSENT ORDER DETAILS
 
LTR 05/28/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO VAN DYKE WALKER, JTA, WITH CONSENT ORDER ATTACHED, REGARDING TIME CONSTRAINTS FOR EXECUTION PRIOR TO JUNE EPB MEETING
 
LTR 05/11/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO DAWN BLACKLEDGE ACKNOWLEDGING RECEIPT OF OUTSTANDING QUALITY MEMO AND THAT REVIEW WAS UNDERWAY
 
RRBD 05/11/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL FROM DAWN BLACKLEDGE WITH SIX FACTORS MEMO FOR OUTSTANDING QUALITY ATTACHED.
 
CALL 04/29/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes SPOKE WITH VAN DYKE WALKER, JTA, RE: STATUS OF TANKS, SEP AND BOARD PROCESS.
 
LTR 04/28/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO DAWN BLACKLEDGE ADVISING OF PRESENTATION OF DRAFT CONSENT ORDER TO EPB ON 04/26/04, AND PLACEMENT OF CO ON EPB MEETING FOR 05/10/04, AND NEED FOR TIMEFRAMES TO FILL IN CO.
 
LTR 04/26/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO DAWN BLACKLEDGE WITH DRAFT LONG CONSENT ORDER ATTACHED, AND ADVISING OF NEED FOR OUTSTANDING QUALITY MEMO FROM FACILITY
 
RRBD 04/22/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL RESPONSE FROM DAWN BLACKLEDGE ADVISING SHE IS BACK FROM HER TRIP
 
LTR 04/21/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO DAWN BLACKLEDGE ADVISING OF SCHEDULE
 
RRBD 04/21/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL FROM DAWN BLACKLEDGE ADVISING OF SCHEDULE AND WHY MISSED CALLING
 
RRBD 04/20/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL RESPONSE FROM DAWN BLACKLEDGE, ADVISING OF FINALIZING SEP PROPOSAL, AND THAT WILL CALL
 
LTR 04/20/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO DAWN BLACKLEDGE RE: SCHEDULE TO DISCUSS SEP PROPOSAL
 
LTR 04/14/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO DAWN BLACKLEDGE ADVISING OF SCHEDULE AND CELL NUMBER IN CALIFORNIA, AND FAX NUMBER IN CALIFORNIA FOR SEP PROPOSAL.
 
RRBD 04/14/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL RESPONSE FROM DAWN BLACKLEDGE RE: SCHEDULE AND WILL GET IN TOUCH WHEN DANA BROWN RETURNS FROM TRIP.
 
LTR 04/14/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO DAWN BLACKLEDGE AGREEING TO DISCUSS WHEN BACK FROM TRIP.
 
RRBD 04/13/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL RESPONSE FROM DAWN BLACKLEDGE ADVISING OF NEED FOR MEETING.
 
LTR 04/13/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO DAWN BLACKLEDGE ADVISING OF SCHEDULE.
 
LTR 04/09/2004 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO DAWN BLACKLEDGE ADVISING OF SCHEDULE AND WHETHER JTA WANTS MAY OR JUNE APPROVAL FOR SEP.
 
LTR 04/07/2004 06/15/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO DAWN BLACKLEDGE RE: REQUIREMENTS FOR "OUTSTANDING QUALITY" FOR SEP PROPOSAL
 
RRBD 04/07/2004 06/15/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes RESPONSE TO EMAIL FROM DAWN BLACKLEDGE, RE: DRAFT FOR SEP OF OUTSTANDING QUALITY.
 
RRBD 01/28/2004 01/28/2004 SIGNIFICANT OUT-OF-COMPLIANCE LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
IKPP 01/15/2004 06/15/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes SEP PROPOSAL RECEIVED.
 
RRBD 11/25/2003 06/15/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes DAWN BLACKLEDGE WITH QUESTION ABOUT FORM OF SEP PROPOSAL.
 
RRBD 10/03/2003 06/15/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes RESPONSE TO EMAIL FROM DAWN BLACKLEDGE, AEROSTAR, RE: SEP PROPOSAL.
 
LTR 10/03/2003 06/15/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes EMAIL TO AEROSTAR REGARDING SEP REQUIREMENTS.
 
MEET 07/24/2003 06/15/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes SETTLEMENT MEETING HELD WITH LOEFFLER, GRIFFIN, CARMEN HUNTER OF JTA, TOM JURY OF JTA, AND DAWN BLACKLEDGE OF AEROSTAR. DISCUSSED VIOLATIONS AND CORRECTIVE ACTIONS, PENALTIES, AND SEP PROPOSAL.
 
CALL 06/19/2003 06/15/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes LEFT MESSAGE ALSO ON 06/18/03, RESCHEDULED SETTLEMENT MEETING
 
CALL 06/17/2003 06/15/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes LEFT MESSAGE TO RESCHEDULE SETTLEMENT MEETING
 
CALL 06/16/2003 06/15/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes SCHEDULED SETTLEMENT MEETING
 
RRBD 06/04/2003 06/15/2004 LOEFFLER_K 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes RECEIVED RESPONSE TO CITATION FROM CONSULTANT AEROSTAR.
 
CALL 05/27/2003 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes CALL WITH CARMEN HUNTER AND TOM JURY, RE: CLOSING USTS.
 
TCI 05/15/2003 06/17/2004 SIGNIFICANT OUT-OF-COMPLIANCE MACK_W 2/4 COMPLIANCE ASSURANCE
 
RRBD 05/07/2003 05/07/2003 GRIFFIN_T 0/0 DISCHARGE PROJECT
 
 Completion Notes PRODUCT FROM A PREVIOUSLY DOCUMENTED RELEASE ENTERS THE TOP OF THE SUMP DURING RAIN EVENTS. EXPLAINATION FROM ENVIRONMENTAL CONSULTANTS
 
IRFR 04/25/2003 05/07/2003 GRIFFIN_T 0/0 DISCHARGE PROJECT
 
 Completion Notes SUMPS 1,3 &4 WATER W/SHEEN
 
CALL 03/18/2003 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes SPOKE WITH MATT, WILL DROP RECORDKEEPING
 
CALL 03/17/2003 06/15/2004 BROWN_DL 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes LEFT MESSAGE FOR MIKE BLAYLOCK, JTA
 
TCR 09/20/2002 09/20/2002 IN-COMPLIANCE CARROLL_A 2/4 COMPLIANCE ASSURANCE
 
TCI 05/21/2002 06/13/2002 MINOR OUT-OF-COMPLIANCE CARROLL_A 2/4 COMPLIANCE ASSURANCE
 
TIN 11/19/2001 01/02/2002 IN-COMPLIANCE CARROLL_A 2/4 COMPLIANCE ASSURANCE
 
TXI 11/16/2001 01/02/2002 IN-COMPLIANCE CARROLL_A 2/4 COMPLIANCE ASSURANCE
 
TCI 05/01/2001 05/30/2001 IN-COMPLIANCE CARROLL_A 2/4 COMPLIANCE ASSURANCE
 
TIN 02/02/2001 02/08/2001 IN-COMPLIANCE CARROLL_A 2/4 COMPLIANCE ASSURANCE
 
 Completion Notes INSTALLED 4" FIBERGLASS DW PIPING
 
TIN 01/18/2001 02/08/2001 IN-COMPLIANCE CARROLL_A 2/4 COMPLIANCE ASSURANCE
 
 Completion Notes INSTALLED 200 GAL DW UST
 
TXI 01/16/2001 02/08/2001 IN-COMPLIANCE CARROLL_A 2/4 COMPLIANCE ASSURANCE
 
 Completion Notes REMOVED 4" UNDERGROUND STEEL PIPING AND 6" @ TANK #8 AND 4" NEAR BUILDING AND CLOSED WASTE OIL TANK IN PLACE
 
TXI 01/04/2001 02/08/2001 IN-COMPLIANCE CARROLL_A 2/4 COMPLIANCE ASSURANCE
 
 Completion Notes REMOVED TANK #7
 
TXI 12/12/2000 02/08/2001 IN-COMPLIANCE CARROLL_A 2/4 COMPLIANCE ASSURANCE
 
 Completion Notes CLOSED TANK #10 IN PLACE
 
CRLE 07/05/2000 07/05/2000 CUMMINGS_C 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes INSPECTION RECEIVED 6/29/00
 
NCLI 06/16/2000 07/05/2000 CARROLL_A 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes .510(2)C .600(3)D .610(4)(D)1 .640(2)E .610(4)B .700(1)(C)3 .610(2) .600(1)F .610(1)A .510(2)D .700(1)(C)1 .510(1)D .450(1)B .500(3)D
 
TCI 06/16/2000 07/05/2000 SIGNIFICANT OUT-OF-COMPLIANCE CARROLL_A 1/7 COMPLIANCE ASSURANCE
 
 Completion Notes AST#8 BULK LINE TOUCHES SOIL WITH NO SC OR LINE TEST/NO UST OR AST MONTHLY VISUAL INSPECTIONS RECORDS/NO LLD TEST/UNKNOWN IF UNDERGROUND PIPING DOUBLE WALLED OR CORROSION PROTECTED/NO RD FOR USTS/WATER & FUEL IN STP SUMPS/SHEAR VALVES NOT PROPERLY ANCHORD
 
TCI 03/11/1999 04/12/1999 IN-COMPLIANCE TORSANKO_G 0/0 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Electronic Communication 05/06/2025 Satisfied AMES_J Compliance Assistance
 
Letter 05/06/2025 Satisfied AMES_J Compliance Assistance
 
Electronic Communication 04/01/2025 Satisfied AMES_J Compliance Assistance
 
Enforcement Referral 03/25/2025 Accepted AMES_J Enforcement
 
Electronic Communication 03/14/2025 Satisfied AMES_J Compliance Assistance
 
Letter 03/03/2025 Satisfied AMES_J Compliance Assistance
 
Electronic Communication 03/03/2025 Satisfied AMES_J Compliance Assistance
 
Electronic Communication 03/03/2025 Satisfied AMES_J Compliance Assistance
 
Electronic Communication 02/05/2025 Satisfied AMES_J Compliance Assistance
 
Electronic Communication 01/06/2025 Satisfied AMES_J Compliance Assistance
 
Letter 12/04/2024 Satisfied CHRISTIAN_ED_1 Compliance Assistance
 
Site Inspection 12/04/2024 Major Out of Compliance CHRISTIAN_ED_1 9/0 Routine Compliance
 
Electronic Communication 11/12/2024 Satisfied CHRISTIAN_ED_1 Compliance Assistance
 
Letter 01/28/2021 Satisfied AUSTIN_JH_1 Compliance Assistance
 
Electronic Communication 01/28/2021 Satisfied AUSTIN_JH_1 Compliance Assistance
 
Letter 01/21/2021 Satisfied AUSTIN_JH_1 Compliance Assistance
 
Electronic Communication 01/21/2021 Satisfied AUSTIN_JH_1 Routine Compliance
 
Site Inspection 01/21/2021 Major Out of Compliance AUSTIN_JH_1 9/0 Routine Compliance
 
Letter 10/06/2020 Satisfied RICHARDS_JE_1 Closure
 
TCAR 10/06/2020 Satisfied RICHARDS_JE_1 Closure
 
Letter 07/24/2020 Satisfied RICHARDS_JE_1 Compliance Assistance
 
Site Inspection 07/24/2020 In Compliance RICHARDS_JE_1 0/1 Closure
 
Letter 08/19/2019 Satisfied BRADSHAW_B Enforcement
 
Enforcement Tracking 08/19/2019 Closed Without Enforcement BRADSHAW_B Enforcement
 
TCAR 08/19/2019 Satisfied BRADSHAW_B Closure
 
Site Inspection 08/13/2019 In Compliance BRADSHAW_B 7/0 Installation
 
Enforcement Referral 09/05/2018 Accepted RICHARDS_JE_1 Enforcement
 
Electronic Communication 08/14/2018 Satisfied VERMILLION_KN_1 Compliance Assistance
 
Electronic Communication 08/03/2018 Satisfied VERMILLION_KN_1 Compliance Assistance
 
Electronic Communication 08/03/2018 Satisfied VERMILLION_KN_1 Compliance Assistance
 
Electronic Communication 07/27/2018 Satisfied VERMILLION_KN_1 Routine Compliance
 
Incident 07/17/2018 Has not led to Discharge RICHARDS_JE_1 Incident
 
Document Management 07/17/2018 Satisfied RICHARDS_JE_1 Incident
 
Electronic Communication 06/01/2018 Satisfied VERMILLION_KN_1 Compliance Assistance
 
Letter 05/27/2018 Satisfied VERMILLION_KN_1 Compliance Assistance
 
Site Inspection 05/25/2018 Major Out of Compliance VERMILLION_KN_1 9/1 Routine Compliance
 
Electronic Communication 05/14/2018 Satisfied VERMILLION_KN_1 Routine Compliance
 
Electronic Communication 08/10/2015 Satisfied LUNN_RJ_1 Routine Compliance
 
Site Inspection 08/10/2015 In Compliance LUNN_RJ_1 9/1 Routine Compliance
 
Letter 05/22/2015 Satisfied HILL_KL_1 Non-Compliance
 
Electronic Communication 05/18/2015 Satisfied HILL_KL_1 Installation
 
Site Inspection 05/18/2015 Minor Out of Compliance HILL_KL_1 2/0 Installation
 
Electronic Communication 05/08/2015 Satisfied HILL_KL_1 Closure
 
Site Inspection 05/08/2015 In Compliance HILL_KL_1 1/0 Closure
 
Electronic Communication 12/19/2013 Satisfied RICHARDS_JE_1 Non-Compliance
 
Letter 10/14/2013 Satisfied LUNN_RJ_1 Non-Compliance
 
Electronic Communication 10/14/2013 Satisfied LUNN_RJ_1 Routine Compliance
 
Electronic Communication 10/14/2013 Satisfied LUNN_RJ_1 Installation
 
Site Inspection 10/11/2013 In Compliance LUNN_RJ_1 8/1 Routine Compliance
 
Site Inspection 10/11/2013 Minor Out of Compliance LUNN_RJ_1 1/0 Installation
 
Record Document 04/02/2012 Satisfied TOWLE_M Routine Compliance
 
Issue Document 02/20/2012 Satisfied TOWLE_M Routine Compliance
 
Record Document 02/13/2012 Satisfied TOWLE_M Routine Compliance
 
Site Inspection 01/30/2012 In Compliance TOWLE_M 8/1 Routine Compliance
 
Site Inspection 03/15/2011 In Compliance PARISH_KM_1 8/1 Routine Compliance
 
Letter 05/21/2010 Satisfied HOLLOWAY_RW_1 Closure
 
TCAR 04/19/2010 Satisfied HOLLOWAY_RW_1 Closure
 
Site Inspection 04/02/2010 In Compliance SPEARS_CV_1 8/1 Routine Compliance
 
Document Management 02/08/2010 Complete GRIFFIN_TW_1 Discharge
 
Site Inspection 01/13/2010 In Compliance GRIFFIN_TW_1 0/1 Closure
 
Electronic Communication 01/11/2010 Satisfied GRIFFIN_TW_1 Closure
 
Record Document 12/14/2009 Satisfied GRIFFIN_TW_1 Incident
 
Discharge Reporting 12/10/2009 Satisfied GRIFFIN_TW_1 Discharge
 
Discharge Reporting 12/10/2009 Satisfied GRIFFIN_TW_1 Discharge
 
Document Management 11/18/2009 Complete GRIFFIN_TW_1 Discharge
 
Site Inspection 05/29/2009 In Compliance PARISH_KM_1 9/1 Routine Compliance
 
Record Document 02/02/2009 Satisfied WILLIAMS_EM_1 Non-Compliance
 
Site Inspection 10/21/2008 In Compliance GRIFFIN_TW_1 7/0 Discharge
 
Complaint 10/20/2008 Satisfied GRIFFIN_TW_1 Complaint
 
Site Inspection 04/16/2008 In Compliance PARISH_KM_1 8/1 Routine Compliance
 
Site Inspection 06/17/2007 In Compliance PARISH_KM_1 7/0 Routine Compliance
 
Site Inspection 06/15/2006 In Compliance PARISH_KM_1 8/2 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
05/06/2025 7001 Minor 1.1 No reasonable access provided. Schedule inspection and provide EQD inspector access to Tanks 13 and 20R.
 
03/03/2025 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Facility must repair/replace deficient components in Sump A. Responsible Party must determine if a discharge to the environment occurred or not. Incident investigation and resolution documentation must be provided. Post repair/replacement testing is required. Proper notification to EQD must be provided if concrete will be broken to conduct installation/closure activities. Sampling may be required.
 
12/04/2024 7011 Minor 1.9 Appropriate paperwork for financial responsibility improperly completed or maintained. No Part P was available at the time of the inspection, nor was the insurance policy, nor was Part A provided.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
01/11/1997   INACTIVE 25
 
05/15/1991   INACTIVE 25 PETROLEUM CLEANUP PARTICIPATION PROGRAM-ELIGIBLE
 
03/04/1988   INACTIVE 25 EARLY DETECTION INCENTIVE-ELIGIBLE
 
07/09/1985   ACTIVE 25 EARLY DETECTION INCENTIVE-ELIGIBLE