![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 03/14/2025 Last Data Refresh: 03/13/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Local Government | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 8521405 | Latitude | 30° 20' 17.7154 | ||||||||
Name |
JACKSONVILLE CITY #1 MOTOR POOL 2581 COMMONWEALTH AVE |
Longitude | 81° 42' 34.1951 | ||||||||
JACKSONVILLE, FL 32254-2042 | LL Method | DPHO | |||||||||
Contact | J LOPEZ | LL Status | REVIEWED | ||||||||
Phone | (904) 509-3084 | Status Date | 06/13/2003 | ||||||||
Account Owner Information | |||||||||||
Name | JACKSONVILLE CITY-FLEET MGMT 2581 COMMONWEALTH AVE JACKSONVILLE, FL 32254-2013 |
Effective Date | 05/20/1994 | ||||||||
Contact | ERIK PREACHER/ JOSE LOPEZ (904) 381-8285 / MIYATA | ||||||||||
Phone | (904) 255-7434 | ||||||||||
JLOPEZ@COJ.NET | |||||||||||
Placard # / Date | 691326 - 06/19/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | JACKSONVILLE CITY 214 N HOGAN ST 10TH FLR JACKSONVILLE, FL 32202 |
Effective Date | 07/22/2015 | ||||||||
Contact | |||||||||||
Phone | (904) 255-8700 | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 06/01/1977 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill (S) DEP approved containment (Z) DEP approved tank material |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 06/01/1977 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill (S) DEP approved containment (Z) DEP approved tank material |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 06/01/1977 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill (S) DEP approved containment (Z) DEP approved tank material |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Vehicular Diesel (D) | 06/01/1977 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill (S) DEP approved containment (Z) DEP approved tank material |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Unleaded Gas (B) | 06/01/1977 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill (S) DEP approved containment (Z) DEP approved tank material |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Vehicular Diesel (D) | 06/01/1977 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill (S) DEP approved containment (Z) DEP approved tank material |
(B) Steel/galvanized metal (F) Double wall |
(8) Manually sampled wells (M) Manual tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
LOCAL GOVERNMENTS - FINANCIAL TEST | 10/01/2021 | 09/30/2022 | |||||||||
LOCAL GOVERNMENTS - FINANCIAL TEST | 10/01/2019 | 03/29/2021 | |||||||||
LOCAL GOVERNMENTS - FINANCIAL TEST | 10/01/2018 | 03/28/2020 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/28/2008 | 08/01/2019 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 04/18/2005 | 05/03/2005 | IN-COMPLIANCE | GARBEE_M | 0/5 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/30/2004 | 07/02/2004 | COMPLIANCE ASSURANCE | ||||||||
TCI | 03/24/2004 | 04/06/2004 | MINOR OUT-OF-COMPLIANCE | GARBEE_M | 0/5 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/03/2003 | 09/15/2003 | DEFALCO_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED DOC FROM TALLY RE FR. ALL OK | |||||||||||
TCR | 08/20/2003 | 08/25/2003 | MINOR OUT-OF-COMPLIANCE | DEFALCO_L | 0/5 | COMPLIANCE ASSURANCE | |||||
Completion Notes TCR REVEALED THAT ALL VIOS CORRECTED EXCEPT FR VERIFICATION STILL PENDING BETWEEN COJ AND TALLY | |||||||||||
RRBD | 07/22/2003 | 08/18/2003 | DEFALCO_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes MTG WITH HARRY LYONS TO DISCUSS STATUS OF VIOS, LLD TESTING 7/10/03 PASSED, CP TESTING PASSED 5/29/03, SUMPS PUMPED | |||||||||||
TCI | 04/22/2003 | 06/12/2003 | MINOR OUT-OF-COMPLIANCE | LEIGHTON_S | 0/5 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/18/2002 | 07/25/2002 | DEFALCO_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ISSUES FOR TCI RESOLVED, OVERFILL, LLD TESTING,OM | |||||||||||
NCLI | 03/26/2002 | 03/26/2002 | DEFALCO_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes OVERFILL, ANNUAL LLD TESTING, REMOVE WATER FROM ATG SUMPS | |||||||||||
TCI | 03/12/2002 | 03/22/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | DEFALCO_L | 0/5 | COMPLIANCE ASSURANCE | |||||
LTR | 11/28/2000 | 01/19/2001 | LUBINSKI | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LETTER ACKNOWLEDGES FACILITY IN COMPLAINCE AT THIS TIME, GAVE REMINDERS TO KEEP IN COMPLIANCE. | |||||||||||
TCR | 11/21/2000 | 11/22/2000 | IN-COMPLIANCE | LUBINSKI | 0/5 | COMPLIANCE ASSURANCE | |||||
Completion Notes CP BOX REPAIRED, PIPING RD (TLS-350) REPAIRED, WATER IN SUMPS REMOVED. | |||||||||||
RRBD | 09/15/2000 | 09/20/2000 | LUBINSKI | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED CP TEST RESULTS DATED 24-JAN-00, AND INF FOR WATER IN SUMPS. | |||||||||||
WLI | 08/24/2000 | 09/20/2000 | LUBINSKI | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes W/ PENALTIES. NEED CP TEST RESULTS, INF. | |||||||||||
RRBD | 08/04/2000 | 09/20/2000 | LUBINSKI | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESPONSE DID NOT INCLUDE ADEQUATE PROOF. | |||||||||||
WLI | 07/06/2000 | 09/20/2000 | LUBINSKI | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NEED INF AND CP TEST RESULTS. | |||||||||||
TCI | 03/21/2000 | 03/21/2000 | IN-COMPLIANCE | DEFALCO_L | 0/5 | COMPLIANCE ASSURANCE | |||||
Completion Notes L6 ALARM FOR DIESEL SUMP, CONTAINED WATER AND MAINT CALLED TO PUMP OUT | |||||||||||
TCI | 05/26/1999 | 07/27/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | DEFALCO_L | 0/5 | COMPLIANCE ASSURANCE | |||||
UTCI | 05/13/1997 | 06/11/1997 | SIGNIFICANT OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 11/21/2022 | Major Out of Compliance | MACK_BT | 0/5 | Routine Compliance | ||||||
Letter | 04/03/2020 | Satisfied | BRADSHAW_B | Enforcement | |||||||
Enforcement Tracking | 04/03/2020 | Closed Without Enforcement | BRADSHAW_B | Enforcement | |||||||
Letter | 03/25/2020 | Satisfied | BRADSHAW_B | Enforcement | |||||||
Letter | 03/25/2020 | Satisfied | BRADSHAW_B | Compliance Assistance | |||||||
Enforcement Referral | 01/24/2020 | Accepted | BRADSHAW_B | Enforcement | |||||||
Document Management | 12/18/2019 | Satisfied | BRADSHAW_B | Discharge | |||||||
Incident | 12/18/2019 | Has not led to Discharge | BRADSHAW_B | Incident | |||||||
Document Management | 12/18/2019 | Satisfied | BRADSHAW_B | Incident | |||||||
Electronic Communication | 12/16/2019 | Satisfied | BRADSHAW_B | Routine Compliance | |||||||
Record Document | 10/28/2019 | Satisfied | BRADSHAW_B | Routine Compliance | |||||||
Electronic Communication | 10/28/2019 | Satisfied | BRADSHAW_B | Routine Compliance | |||||||
Site Inspection | 09/16/2019 | Major Out of Compliance | BRADSHAW_B | 0/5 | Routine Compliance | ||||||
TCAR | 06/06/2019 | Satisfied | HARRIS_MJ | Closure | |||||||
Incident | 05/25/2018 | Has not led to Discharge | HARRIS_MJ | Incident | |||||||
Letter | 05/23/2018 | Satisfied | HARRIS_MJ | Closure | |||||||
Site Inspection | 05/23/2018 | In Compliance | HARRIS_MJ | 0/5 | Closure | ||||||
Incident | 03/23/2018 | Has not led to Discharge | HARRIS_MJ | Incident | |||||||
Incident | 03/23/2018 | Has not led to Discharge | HARRIS_MJ | Incident | |||||||
Discharge Reporting | 03/01/2018 | Satisfied | TOWLE_M | Discharge | |||||||
Document Management | 09/07/2017 | Satisfied | TOWLE_M | Discharge | |||||||
Record Document | 12/12/2016 | Satisfied | TOWLE_M | Installation | |||||||
Letter | 12/01/2016 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Issue Document | 12/01/2016 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 11/28/2016 | Satisfied | TOWLE_M | Closure | |||||||
Record Document | 11/28/2016 | Satisfied | TOWLE_M | Installation | |||||||
Phone Conversation | 11/22/2016 | Satisfied | TOWLE_M | Closure | |||||||
Issue Document | 11/22/2016 | Satisfied | TOWLE_M | Closure | |||||||
Phone Conversation | 11/21/2016 | Satisfied | TOWLE_M | Installation | |||||||
Phone Conversation | 11/10/2016 | Satisfied | TOWLE_M | Installation | |||||||
Phone Conversation | 11/10/2016 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 11/04/2016 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 10/03/2016 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 09/13/2016 | Satisfied | TOWLE_M | Routine Compliance | |||||||
Site Inspection | 09/12/2016 | Minor Out of Compliance | TOWLE_M | 0/5 | Routine Compliance | ||||||
Incident | 04/04/2016 | Has not led to Discharge | TOWLE_M | Incident | |||||||
Site Inspection | 08/14/2014 | In Compliance | TOWLE_M | 0/5 | Routine Compliance | ||||||
Record Document | 01/31/2014 | Satisfied | TOWLE_M | Installation | |||||||
Site Inspection | 06/21/2013 | Major Out of Compliance | TOWLE_M | 0/5 | Routine Compliance | ||||||
Site Inspection | 06/21/2013 | In Compliance | TOWLE_M | 0/5 | Closure | ||||||
Record Document | 06/14/2013 | Satisfied | TOWLE_M | Routine Compliance | |||||||
Issue Document | 06/14/2013 | Satisfied | TOWLE_M | Routine Compliance | |||||||
Issue Document | 06/14/2013 | Satisfied | TOWLE_M | Routine Compliance | |||||||
Phone Conversation | 06/14/2013 | Satisfied | TOWLE_M | Routine Compliance | |||||||
Record Document | 07/24/2012 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 06/05/2012 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 05/14/2012 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 05/08/2012 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Phone Conversation | 04/27/2012 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Issue Document | 04/27/2012 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Site Inspection | 04/26/2012 | Minor Out of Compliance | TOWLE_M | 0/5 | Routine Compliance | ||||||
Record Document | 06/09/2011 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 05/17/2011 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Issue Document | 04/22/2011 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Site Inspection | 04/18/2011 | Minor Out of Compliance | TOWLE_M | 0/5 | Routine Compliance | ||||||
Record Document | 05/17/2010 | Satisfied | TOWLE_M | Routine Compliance | |||||||
Record Document | 04/14/2010 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 04/14/2010 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 04/08/2010 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Issue Document | 04/01/2010 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 04/01/2010 | Satisfied | TOWLE_M | Routine Compliance | |||||||
Site Inspection | 03/09/2010 | Minor Out of Compliance | TOWLE_M | 0/5 | Routine Compliance | ||||||
Discharge Reporting | 11/10/2009 | Satisfied | DOHANEY_T | Discharge | |||||||
Record Document | 06/11/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 06/02/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Letter | 05/29/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 05/27/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 05/20/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 05/14/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 05/07/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 05/01/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 04/24/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Site Inspection | 03/12/2009 | Minor Out of Compliance | TOWLE_M | 0/5 | Routine Compliance | ||||||
Letter | 08/19/2008 | Satisfied | TOWLE_M | Closure | |||||||
Site Inspection | 07/16/2008 | In Compliance | LUBINSKI_D | 0/6 | Closure | ||||||
Site Inspection | 07/16/2008 | In Compliance | LUBINSKI_D | 0/1 | Installation | ||||||
Record Document | 06/23/2008 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Letter | 06/20/2008 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 06/20/2008 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Letter | 04/25/2008 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Site Inspection | 04/24/2008 | Minor Out of Compliance | TOWLE_M | 0/5 | Routine Compliance | ||||||
Issue Document | 02/04/2008 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 02/04/2008 | Satisfied | DEFALCO_L | Discharge | |||||||
Issue Document | 10/19/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 10/19/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Issue Document | 08/10/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 08/10/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 05/23/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Issue Document | 05/23/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 03/01/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 03/01/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Issue Document | 03/01/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Site Inspection | 02/22/2007 | In Compliance | WHITE_CM | 0/5 | Routine Compliance | ||||||
Issue Document | 12/21/2006 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 12/15/2006 | Satisfied | DOHANEY_T | Discharge | |||||||
Record Document | 10/04/2006 | Satisfied | DOHANEY_T | Non-Compliance | |||||||
Site Inspection | 06/30/2006 | Minor Out of Compliance | WHITE_CM | 0/6 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/21/2022 | 6008 | Minor | 2.7 For installation, closure, or change in service status, notification not received in a timely manner. | Please forward documentation showing notification was submitted for the closure of Tank 2 to the District, a completed Closure Integrity Report was performed and submitted to the District A post closure inspection and sampling may be required. | |||||||
11/01/2022 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove and dispose of liquid in the sump properly. Provide a photograph of the sump (including boots, piping, and pump head) and disposal manifest/documentation for removed liquid. Please submit all documentation to the Department for review. | |||||||
11/01/2022 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Please submit repair documentation and current containment integrity testing for Tank 5 Diesel STP sump. | |||||||
11/01/2022 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Please submit test results for the containment integrity testing for Tanks 1, 3, 4, and 5 STP sumps. If testing has not been perform, have testing conducted and submit documentation to the Department for review. | |||||||
11/01/2022 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Submit an updated Tank Registration Form placing Tank 2 into closed in place status and updating the form to reflect the correct status of tank and numbering for all tanks. | |||||||
11/01/2022 | 6069 | Minor | 4.5 Cathodic protection not operated and maintained to provide continuous protection. System not inspected 6 months after installation or repair. Cathodic protection system not inspected in accordance with NACE International Standards. Impressed current system not inspected every 2 months. | Have a NACE certified Corrosion Professional inspect, test, and evaluate the cathodic protection system and provide documentation to the Department. | |||||||
11/01/2022 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Please submit test results for the containment integrity testing for 1/2, 3/4, 5/6, 7/8, and 9/10 dispenser sump. If testing has not been perform, have testing conducted and submit documentation to the Department for review. | |||||||
11/01/2022 | 6006 | Minor | 2.5 Placard not displayed (or available upon request). | Please display the registration placard in plain view. Submit a photograph of the posted current placard to the Department for review. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/07/2019 | ACTIVE | ||||||||||
11/30/2016 | ACTIVE | ||||||||||
11/09/2006 | COMPLETED | 27 | |||||||||
02/23/1988 | ACTIVE | 27 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||