DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 03/14/2025        Last Data Refresh: 03/13/2025        Report Generated from DOPPLER
 
District Northeast   Type    Local Government
 
County Duval   Status    OPEN
 
ID 8521409   Latitude    30° 19' 29.2636
 
Name JACKSONVILLE CITY-FLEET MGMT DIV
501 E BAY ST
Longitude    81° 39' 1.0523
  JACKSONVILLE, FL 32202-2975 LL Method    DPHO
 
Contact J LOPEZ   LL Status    REVIEWED
 
Phone (904) 509-3084   Status Date    06/11/2003
 
Account Owner Information
 
Name JACKSONVILLE CITY-FLEET MGMT
2581 COMMONWEALTH AVE
JACKSONVILLE, FL 32254-2013
Effective Date    05/20/1994
 
Contact ERIK PREACHER/ JOSE LOPEZ (904) 381-8285 / MIYATA
 
Phone (904) 255-7434
 
Email JLOPEZ@COJ.NET
  Placard # / Date    691327 - 06/19/2024
Property Owner Information
 
Name JACKSONVILLE CITY-FLEET MGMT
2581 COMMONWEALTH AVE
JACKSONVILLE, FL 32254-2013
Effective Date    02/09/2012
 
Contact ERIK PREACHER/ JOSE LOPEZ (904) 381-8285 / MIYATA
 
Phone (904) 255-7434
 
Email JLOPEZ@COJ.NET
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
11 8000 Emerg Generator Diesel (G) 04/01/1993 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (I) Suction piping system
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
8 20000 Unleaded Gas (B) 04/01/1993 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
9 20000 Unleaded Gas (B) 04/01/1993 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
1 10000 Unleaded Gas (B) 06/01/1974 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
10 1000 New/Lube Oil (O) 04/01/1993 UNDERGROUND Out of Service (T)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (I) Suction piping system
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
2 10000 Unleaded Gas (B) 06/01/1974 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
3 10000 Unleaded Gas (B) 06/01/1974 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
4 10000 Fuel Oil - Onsite Heat (M) 08/01/1975 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(D) Unknown   (A) Abv, no soil contact (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
5 560 New/Lube Oil (O) 08/01/1975 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (I) Suction piping system (M) Manual tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
6 560 New/Lube Oil (O) 08/01/1975 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (I) Suction piping system (M) Manual tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
7 8000 Emerg Generator Diesel (G) 01/01/1977 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (C) Groundwater Monitoring Plan
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
LOCAL GOVERNMENTS - FINANCIAL TEST   10/01/2021 09/30/2022
LOCAL GOVERNMENTS - FINANCIAL TEST   10/01/2019 03/28/2021
LOCAL GOVERNMENTS - FINANCIAL TEST   10/01/2018 03/28/2020
LOCAL GOVERNMENTS - BOND RATING TEST   01/28/2014 08/23/2019
LOCAL GOVERNMENTS - BOND RATING TEST   09/22/2004 10/01/2030
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 04/19/2005 05/03/2005 IN-COMPLIANCE GARBEE_M 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes LINES TESTED 2/10/05 BY MECO. LLD FAILED TEST AND WAS REPLACED WITH NEW LLD THAT PASSED MONTHLY INSPECTIONS.POTENTIAL GROWTH ON ENVIRON PIPING NEEDS TO BE MONITORED CLOSELY FOR LOSS OF INTEGRITY.
 
TXI 01/13/2005 02/11/2005 IN-COMPLIANCE LEIGHTON 0/1 COMPLIANCE ASSURANCE
 
 Completion Notes REMOTE FILL PIPING CLOSED IN PLACE, FILL PORTS WERE CONCRETED OVER IN MARCH 03. NO TCAR REQ'D PER DEP/NED BECAUSE PIPE WAS NEVER USED
 
TCI 03/25/2004 04/09/2004 IN-COMPLIANCE GARBEE_M 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes 2005 INSPECTION: REQUEST BARRIERS BE PLACED AROUND LUBE OIL TANK AND 20K UST, DAY BEFORE INSPECTION TO ENSURE ACCESS.
 
RRBD 09/03/2003 09/15/2003 DEFALCO_L 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes RECEIVED DOC FROM TALLY RE F R. ALL OK. RECORDS OK ALSO.
 
RRBD 07/22/2003 08/18/2003 DEFALCO_L 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes MTG W/ HARRY LYONS TO DISCUSS STATUS, LLD TESTING 7/16/03 PASSED
 
TCI 05/13/2003 05/30/2003 MINOR OUT-OF-COMPLIANCE DEFALCO_L 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes LLD TEST DUE, CLOSURE OF REMOTE FILL PIPING NOW DUE 12/04; DOC OF FR SELF INSURED STATUS DUE.
 
RRBD 11/21/2002 06/11/2003 DEFALCO_L 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes UPDATE LTR REMOTEFILL PIPING CLOSED, NEED CLOSURE ASSESS.
 
RRBD 07/18/2002 07/25/2002 DEFALCO_L 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes TCI ISSUES- OF AND LLD RESOLVED
 
NCLI 03/11/2002 03/11/2002 DEFALCO_L 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes RD,OVERFILL,ANNUAL LLD TESTING
 
TCI 02/21/2002 03/11/2002 SIGNIFICANT OUT-OF-COMPLIANCE DEFALCO_L 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes ANNUAL LLD, MON RD DOC , OVERFILL
 
TCI 08/03/2001 08/07/2001 IN-COMPLIANCE LUBINSKI 0/4 COMPLIANCE ASSURANCE
 
 
 
No Compliance Activity Data Found
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
11/15/2022 6024 Minor 2.2 Integrity test not performed on storage tank, integral piping, single-walled spill containment system, double-walled spill containment system, or doubled-walled sump prior to placing into service. Perform containment integrity testing for Tank 8, 9, and 11 STP sumps, the regular gasoline transition sump, and 1/2, and 3/4 dispenser sumps. Submit results to the Department for review.
 
11/09/2022 6006 Minor 2.5 Placard not displayed (or available upon request). Display registration placard in plain view and submit a photograph of the posted placard to the Department for review.
 
11/09/2022 6056 SNC-B 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. Provide an current alarm history print out to the Department for review.
 
11/09/2022 6073 Minor 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. Remove and properly dispose of the liquid from the Tank 10 STP sumps as petroleum contact water (PCW). Provide after PCW removal photographs that clearly show the boots and piping in the sumps and PCW disposal manifest/documentation to the Department for review.
 
11/09/2022 6023 Minor 4.1 Secondary containment or integral piping not installed to allow for monitoring point. Have a qualified contractor investigate the construction of integral piping for Tank 11 and determine if there is a low point monitoring system installed. Submit documentation to the Department for review. If it is determined that a low point monitoring system in not installed, modification to the system to allow monitoring may be needed.
 
11/09/2022 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Address the surface corrosion observed in the Tank 9 STP sump. Submit after repair photographs and a work order to the Department for review.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
04/05/1993   COMPLETED 60 PETROLEUM CLEANUP PARTICIPATION PROGRAM-ELIGIBLE