![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Fuel user/Non-retail | ||||||||
County | Osceola | Status | OPEN | ||||||||
ID | 8521966 | Latitude | 28° 20' 41.6436 | ||||||||
Name |
TUPPERWARE CORP 3175 N ORANGE BLOSSOM TRL |
Longitude | 81° 23' 48.5339 | ||||||||
KISSIMMEE, FL 34744-1137 | LL Method | DPHO | |||||||||
Contact | ROBERT GORDON | LL Status | REVIEWED | ||||||||
Phone | (407) 826-5050 | Status Date | 06/03/2010 | ||||||||
Account Owner Information | |||||||||||
Name | TUPPERWARE CORP 3175 N ORANGE BLOSSOM TRAIL Kissimmee, FL 34744 |
Effective Date | 05/20/1994 | ||||||||
Contact | ROBERT GORDON | EA HOLLIER (407) 308-6305 | ||||||||||
Phone | (407) 346-2773 | ||||||||||
EAHOLLIER@TUPPERWARE.COM | |||||||||||
Placard # / Date | 669486 - 08/22/2023 | ||||||||||
Property Owner Information | |||||||||||
Name | OC-IB II PROPERTY OWNER LLC 535 MADISON AVE, 6TH FL NEW YORK, NY 10022 |
Effective Date | 08/22/2023 | ||||||||
Contact | |||||||||||
Phone | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 275 | Vehicular Diesel (D) | 01/01/1970 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (A) Abv, no soil contact | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 1000 | Vehicular Diesel (D) | 06/01/1992 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (X) Concrete |
(A) Abv, no soil contact | (6) External piping monitoring (Q) Visual inspection of ASTs (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 800 | Emerg Generator Diesel (G) | 01/01/2002 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(X) No piping associated w/tank | (Q) Visual inspection of ASTs (R) Monitor tank bottom space (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Leaded Gas (A) | 04/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Unleaded Gas (B) | 04/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Vehicular Diesel (D) | 04/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 1000 | Emerg Generator Diesel (G) | 06/01/2005 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 02/15/2019 | 02/15/2022 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 07/27/2016 | 07/27/2017 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/21/2016 | 02/15/2019 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 04/21/2016 | 02/15/2019 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 07/27/2015 | 07/27/2016 | ACE | ||||||||
INSURANCE | 07/27/2014 | 07/27/2015 | ILLINOIS UNION | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 07/27/2013 | 07/27/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 07/27/2012 | 07/27/2013 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 07/27/2011 | 07/26/2012 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 07/27/2010 | 07/27/2011 | |||||||||
INSURANCE | 09/01/2009 | 09/01/2010 | ILLINOIS UNION | ||||||||
INSURANCE | 09/01/2008 | 09/01/2009 | ILLINOIS UNION | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 12/27/2005 | 12/27/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/10/2005 | 11/10/2005 | MINOR OUT-OF-COMPLIANCE | MARK GILL | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 10/26/2004 | 10/27/2004 | IN-COMPLIANCE | BILL BRADSHAW | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY APPEARS TO BE IN COMPLIANCE | |||||||||||
TCI | 11/03/2003 | 11/03/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | BILL BRADSHAW | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY OUT OF COMPLIANCE | |||||||||||
RRBD | 11/03/2003 | 11/04/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/12/2002 | 11/12/2002 | IN-COMPLIANCE | BILL BRADSHAW | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY APPEARS TO BE IN COMPLIANCE | |||||||||||
TCI | 11/01/2001 | 11/01/2001 | IN-COMPLIANCE | BILL BRADSHAW | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY IN COMPLIANCE | |||||||||||
TCI | 12/07/2000 | 12/07/2000 | IN-COMPLIANCE | BILL BRADSHAW | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes THIS FACILITY APPEARS TO BE IN COMPLIANCE | |||||||||||
TCI | 12/06/1999 | 12/06/1999 | IN-COMPLIANCE | BILL BRADSHAW | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes IN COMPLIANCE | |||||||||||
TCI | 05/25/1999 | 06/02/1999 | IN-COMPLIANCE | THOMAS | 1/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 03/07/2025 | Satisfied | MIRAJKAR_A | Enforcement | |||||||
Enforcement Referral | 05/16/2024 | Accepted | BECKER_GT_1 | Enforcement | |||||||
Record Document | 02/08/2024 | Satisfied | PEREZ_EX_1 | Compliance Assistance | |||||||
Record Document | 02/07/2024 | Satisfied | PEREZ_EX_1 | Compliance Assistance | |||||||
Electronic Communication | 01/12/2024 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 01/12/2024 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Phone Conversation | 06/07/2023 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 06/07/2023 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 06/05/2023 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Phone Conversation | 06/05/2023 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Letter | 06/01/2023 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Site Inspection | 05/31/2023 | Minor Out of Compliance | KIDDER_MS_1 | 3/0 | Routine Compliance | ||||||
Electronic Communication | 05/23/2023 | Satisfied | KIDDER_MS_1 | Routine Compliance | |||||||
Electronic Communication | 05/23/2023 | Satisfied | KIDDER_MS_1 | Routine Compliance | |||||||
Electronic Communication | 05/23/2023 | Satisfied | KIDDER_MS_1 | Routine Compliance | |||||||
Electronic Communication | 06/09/2022 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||||||
Phone Conversation | 06/01/2022 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||||||
Electronic Communication | 06/01/2022 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||||||
Electronic Communication | 01/11/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 01/11/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Discharge Reporting | 07/05/2019 | Satisfied | RAUENZAHN_RA_1 | Discharge | |||||||
Letter | 04/23/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 04/23/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 04/23/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 04/18/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 04/18/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 04/15/2019 | Satisfied | SANCHEZ_JI_1 | Compliance Assistance | |||||||
Electronic Communication | 04/15/2019 | Satisfied | SANCHEZ_JI_1 | Compliance Assistance | |||||||
Electronic Communication | 04/15/2019 | Satisfied | SANCHEZ_JI_1 | Compliance Assistance | |||||||
Electronic Communication | 04/15/2019 | Satisfied | SANCHEZ_JI_1 | Compliance Assistance | |||||||
Electronic Communication | 04/15/2019 | Satisfied | SANCHEZ_JI_1 | Compliance Assistance | |||||||
Document Management | 04/12/2019 | Satisfied | SANCHEZ_JI_1 | Compliance Assistance | |||||||
Document Management | 04/12/2019 | Satisfied | SANCHEZ_JI_1 | Compliance Assistance | |||||||
Document Management | 04/12/2019 | Satisfied | SANCHEZ_JI_1 | Compliance Assistance | |||||||
Letter | 01/14/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Site Inspection | 01/14/2019 | Major Out of Compliance | BECKER_GT_1 | 1/0 | Discharge | ||||||
Letter | 01/11/2019 | Satisfied | SANCHEZ_JI_1 | Compliance Assistance | |||||||
Site Inspection | 01/11/2019 | Major Out of Compliance | SANCHEZ_JI_1 | 3/0 | Routine Compliance | ||||||
Electronic Communication | 08/21/2018 | Satisfied | BECKER_GT_1 | Discharge | |||||||
Electronic Communication | 08/20/2018 | Satisfied | BECKER_GT_1 | Discharge | |||||||
Electronic Communication | 08/20/2018 | Satisfied | BECKER_GT_1 | Discharge | |||||||
Electronic Communication | 08/20/2018 | Satisfied | BECKER_GT_1 | Discharge | |||||||
Document Management | 08/14/2018 | Satisfied | RAUENZAHN_RA_1 | Discharge | |||||||
Discharge Reporting | 05/22/2017 | Satisfied | BECKER_GT_1 | Discharge | |||||||
Document Management | 05/19/2017 | Satisfied | RAUENZAHN_RA_1 | Discharge | |||||||
Document Management | 02/22/2017 | Satisfied | BECKER_GT_1 | Discharge | |||||||
Electronic Communication | 02/22/2017 | Satisfied | BECKER_GT_1 | Discharge | |||||||
Site Inspection | 02/13/2017 | In Compliance | BECKER_GT_1 | 1/0 | Discharge | ||||||
Document Management | 02/13/2017 | Satisfied | BECKER_GT_1 | Discharge | |||||||
Document Management | 02/13/2017 | Satisfied | BECKER_GT_1 | Discharge | |||||||
Site Inspection | 04/06/2016 | In Compliance | JOWETT_JC_1 | 3/0 | Routine Compliance | ||||||
Record Document | 07/10/2014 | Satisfied | MOORHEAD_SB_1 | Routine Compliance | |||||||
Site Inspection | 02/18/2014 | In Compliance | BOWERS_M_2 | 3/0 | Routine Compliance | ||||||
Site Inspection | 03/26/2012 | In Compliance | COTTRELL_SA_1 | 3/0 | Routine Compliance | ||||||
Phone Conversation | 03/19/2012 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Site Inspection | 02/04/2011 | In Compliance | COTTRELL_SA_1 | 3/0 | Routine Compliance | ||||||
Phone Conversation | 01/21/2011 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Site Inspection | 03/04/2010 | In Compliance | COTTRELL_SA_1 | 3/0 | Routine Compliance | ||||||
Site Inspection | 05/28/2009 | In Compliance | COTTRELL_SA_1 | 3/0 | Routine Compliance | ||||||
Phone Conversation | 05/15/2009 | Satisfied | GILL_MA_1 | Routine Compliance | |||||||
Site Inspection | 04/11/2008 | In Compliance | COTTRELL_SA_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 04/03/2008 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Record Document | 04/09/2007 | Satisfied | GILL_MA_1 | Non-Compliance | |||||||
Site Inspection | 03/30/2007 | Minor Out of Compliance | GILL_MA_1 | 3/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/31/2023 | 7103 | Minor | 1.12 Registration not updated for closure of storage tank system. | Please update the facility's registration status to show Tank #7 has been removed. https://floridadep.gov/waste/permitting-compliance-assistance/content/storage-tank-facility-registration | |||||||
05/31/2023 | 7094 | Minor | 1.13 Permanent records not available within 5 working days notice. | All records, whether in paper or electronic format, shall be dated and available for inspection by the Department or county. If records are not kept at the facility, they shall be made available at the facility or another agreed upon location upon five business days of receipt of the Department’s or county’s request. Site access to the facility shall be provided for compliance inspections conducted at reasonable times. | |||||||
05/31/2023 | 7106 | Minor | 1.15 Limited Closure Report not submitted. | Please submit a Limited Closure Form for ASTs to matthew.kidder@ocfl.net in order to resolve the violation. | |||||||
05/31/2023 | 7005 | Minor | 1.5 Notification of installation, closure, or change in service status not received in required timeframes. | The following will need to be completed in order to resolve the violation. 1) Submit a Limited Closure Form for ASTs (Tank #7) 2) Update the facility's storage tank registration information to show Tank #7 has been removed. 3) Provide a waste manifest proving that the tank was properly vented, and cleaned prior to it's removal. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
08/14/2018 | COMPLETED | Thornton, Kevin | 4078361467 | ||||||||
02/13/2017 | COMPLETED | 10 | Thornton, Kevin | 4078361467 | |||||||
02/04/1992 | COMPLETED | 26 | |||||||||