DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Southwest   Type    Retail Station
 
County Pinellas   Status    OPEN
 
ID 8623445   Latitude    27° 50' 59.4169
 
Name RAINBOW FOOD MART #5504
8592 49TH ST N
Longitude    82° 42' 1.4067
  PINELLAS PARK, FL 33781 LL Method    DPHO
 
Contact JOE PARMA   LL Status    REVIEWED
 
Phone (727) 804-0674   Status Date    09/24/2003
 
Account Owner Information
 
Name RAINBOW FOOD MART
8592 49TH ST
PINELLAS PARK, FL 33781
Effective Date    05/16/2006
 
Contact JOE PARMA OR ALI KHOJA
 
Phone (727) 804-0674
 
Email RAINBOWFOODMART@HOTMAIL.COM
  Placard # / Date    698556 - 07/02/2024
Property Owner Information
 
Name SOUTHERN LAND EQUITY DEVELOPMENT CORPORATION
PO BOX 12729
ST PETERSBURG, FL 33733
Effective Date    08/07/2019
 
Contact
 
Phone
 
Email
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
1 6000 Unleaded Gas (B) 01/01/1978 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(S) DEP approved containment
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
2 6000 Unleaded Gas (B) 01/01/1978 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(S) DEP approved containment
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
3 10000 Unleaded Gas (B) 01/01/1978 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(S) DEP approved containment
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   07/15/2021 07/15/2022 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   07/15/2020 07/15/2021 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   07/15/2019 07/15/2020 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   07/15/2018 07/15/2019 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   07/15/2017 07/15/2018 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   07/15/2016 07/15/2017 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   11/18/2015 11/18/2016 BERKLEY INSURANCE COMPANY
INSURANCE   11/18/2014 11/18/2015 NAUTILUS INSURANCE COMPANY
INSURANCE   11/18/2013 11/18/2014 NAUTILUS INSURANCE COMPANY
INSURANCE   11/18/2012 11/18/2013 NAUTILUS INSURANCE COMPANY
INSURANCE   11/18/2011 11/18/2012 NAUTILUS INSURANCE COMPANY
INSURANCE   11/18/2010 11/18/2011 NAUTILUS INSURANCE COMPANY
INSURANCE   11/18/2009 11/18/2010 ZURICH-AMERICAN
INSURANCE   11/18/2008 11/18/2009 ZURICH-AMERICAN
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
LTR 12/13/2004 12/14/2004 BARNETT 0/0 COMPLIANCE ASSURANCE
 
TCI 12/13/2004 12/14/2004 IN-COMPLIANCE BARNETT 0/3 COMPLIANCE ASSURANCE
 
LTR 03/23/2004 03/29/2004 FRAZIER 0/0 COMPLIANCE ASSURANCE
 
TCI 03/19/2004 03/29/2004 IN-COMPLIANCE PINK 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes AMERON DW FRP PIPING
 
RRBD 04/21/2003 06/04/2003 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
LTR 03/04/2003 03/06/2003 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
TCI 02/28/2003 03/06/2003 IN-COMPLIANCE STRAUSS 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes ENVIRON STP SUMPS, ENVIRON DW COAX, MECHANICAL LLD (FUNCTION 3/15/02), PNEUMERCATOR LC1001 W/ TANK INTERSTICE SENSORS (FUNCTION 3/15/02), IMPRESSED CURRENT W/ ANNUAL 3/21/02, MONTHLY VISUAL, SIPHON LINE AMERON FRP DW
 
RRBD 04/26/2002 05/29/2002 COMPLIANCE ASSURANCE
 
TCI 03/01/2002 03/05/2002 MINOR OUT-OF-COMPLIANCE STRAUSS 0/3 COMPLIANCE ASSURANCE
 
NCLI 03/01/2002 03/07/2002 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
RRBD 02/12/2001 03/07/2001 COMPLIANCE ASSURANCE
 
TCI 01/10/2001 01/30/2001 MINOR OUT-OF-COMPLIANCE STRAUSS 0/3 COMPLIANCE ASSURANCE
 
RRBD 05/01/2000 07/02/2000 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
TCI 04/12/2000 04/18/2000 MINOR OUT-OF-COMPLIANCE STRAUSS 0/3 COMPLIANCE ASSURANCE
 
RRBD 02/11/2000 02/16/2000 CASTOR 0/0 COMPLIANCE ASSURANCE
 
TIN 12/02/1999 01/03/2000 MINOR OUT-OF-COMPLIANCE CASTOR 0/3 COMPLIANCE ASSURANCE
 
UTCI 10/29/1997 11/06/1997 MINOR OUT-OF-COMPLIANCE COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 05/09/2024 Satisfied VIXAYO_A Enforcement
 
Enforcement Referral 04/02/2024 Accepted PUHR_NM_1 Enforcement
 
Site Inspection 12/11/2023 Major Out of Compliance PUHR_NM_1 0/3 Routine Compliance
 
Enforcement Referral 03/30/2023 Accepted COLSON_NJ_1 Enforcement
 
Electronic Communication 02/10/2023 Satisfied COLSON_NJ_1 Compliance Assistance
 
Record Document 05/03/2022 Satisfied COLSON_NJ_1 Compliance Assistance
 
Record Document 05/03/2022 Satisfied COLSON_NJ_1 Compliance Assistance
 
Phone Conversation 10/15/2021 Satisfied COLSON_NJ_1 Compliance Assistance
 
Site Inspection 09/14/2021 Major Out of Compliance COLSON_NJ_1 0/3 Routine Compliance
 
Letter 09/14/2021 Satisfied COLSON_NJ_1 Compliance Assistance
 
Electronic Communication 08/23/2021 Satisfied COLSON_NJ_1 Routine Compliance
 
Letter 04/15/2020 Satisfied COLSON_NJ_1 Compliance Assistance
 
Site Inspection 04/15/2020 Minor Out of Compliance COLSON_NJ_1 0/3 Routine Compliance
 
Electronic Communication 02/07/2020 Satisfied COLSON_NJ_1 Routine Compliance
 
Site Inspection 09/06/2017 In Compliance COLSON_NJ_1 0/3 Routine Compliance
 
Issue Document 09/06/2017 Satisfied COLSON_NJ_1 Routine Compliance
 
Electronic Communication 07/19/2017 Satisfied COLSON_NJ_1 Routine Compliance
 
Site Inspection 12/31/2015 In Compliance COLSON_NJ_1 0/1 Non-Compliance
 
Issue Document 12/31/2015 Satisfied COLSON_NJ_1 Non-Compliance
 
Letter 10/06/2015 Satisfied COLSON_NJ_1 Non-Compliance
 
Site Inspection 10/06/2015 Minor Out of Compliance COLSON_NJ_1 0/3 Routine Compliance
 
Electronic Communication 08/31/2015 Satisfied COLSON_NJ_1 Routine Compliance
 
Issue Document 08/26/2013 Satisfied STRAUSS_RH_1 Routine Compliance
 
Site Inspection 08/26/2013 In Compliance STRAUSS_RH_1 0/3 Routine Compliance
 
Site Inspection 01/27/2012 In Compliance LONGEN_JL_1 0/3 Routine Compliance
 
Emergency Preparedness Information 01/27/2012 Satisfied LONGEN_JL_1 Routine Compliance
 
Emergency Preparedness Information 01/27/2011 Satisfied LONGEN_JL_1 Closure
 
Site Inspection 01/27/2011 In Compliance LONGEN_JL_1 0/3 Routine Compliance
 
Letter 12/22/2010 Satisfied SOWERS_JA_1 Closure
 
TCAR 12/22/2010 Satisfied SOWERS_JA_1 Closure
 
Discharge Reporting 11/08/2010 Satisfied SOWERS_JA_1 Discharge
 
Document Management 11/08/2010 Complete SOWERS_JA_1 Discharge
 
Letter 11/08/2010 Satisfied SOWERS_JA_1 Discharge
 
Site Inspection 10/19/2010 In Compliance LONGEN_JL_1 0/1 Installation
 
Site Inspection 10/19/2010 In Compliance LONGEN_JL_1 0/1 Closure
 
Incident 10/13/2010 Has not led to Discharge LONGEN_JL_1 Incident
 
Record Document 06/15/2010 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 03/25/2010 Minor Out of Compliance LONGEN_JL_1 0/3 Routine Compliance
 
Letter 03/25/2010 Satisfied LONGEN_JL_1 Non-Compliance
 
Record Document 03/19/2009 Satisfied BARNETT_JX Non-Compliance
 
Emergency Preparedness Information 02/26/2009 Satisfied BARNETT_JX Routine Compliance
 
Letter 02/26/2009 Satisfied BARNETT_JX Non-Compliance
 
Site Inspection 02/26/2009 Minor Out of Compliance BARNETT_JX 0/3 Routine Compliance
 
Record Document 02/28/2008 Satisfied LONGEN_JL_1 Non-Compliance
 
Letter 01/24/2008 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 01/24/2008 Minor Out of Compliance LONGEN_JL_1 0/3 Routine Compliance
 
Emergency Preparedness Information 01/23/2008 Satisfied LONGEN_JL_1 Routine Compliance
 
Site Inspection 04/16/2007 In Compliance BARNETT_JX 0/3 Non-Compliance
 
Letter 04/13/2007 Satisfied BARNETT_JX Non-Compliance
 
Emergency Preparedness Information 02/06/2007 Satisfied LONGEN_JL_1 Routine Compliance
 
Record Document 01/12/2007 Satisfied BARNETT_JX Non-Compliance
 
Site Inspection 10/31/2006 Major Out of Compliance BARNETT_JX 0/3 Routine Compliance
 
Emergency Preparedness Information 09/25/2006 Satisfied BARNETT_JX Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
12/11/2023 6012 SNC-A 2.9 No financial responsibility instrument or expired instrument for > 180 days. Submit current financial responsibility documentation (Part P and C) to this office for review (07/15/2022 to current).
 
12/11/2023 6072 Minor 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. Submit May 2022 test records for the double walled spill bucket to this office for review.
 
09/14/2021 6069 Minor 4.5 Cathodic protection not operated and maintained to provide continuous protection. System not inspected 6 months after installation or repair. Cathodic protection system not inspected in accordance with NACE International Standards. Impressed current system not inspected every 2 months. Be sure to have the CP system assessed every year. Have the system inspected immediately & submit findings/survey results to this office for review.
 
09/14/2021 6065 SNC-B 4.3 Damaged system not taken out of service or out of operation until repair is made. Take the systems Out of Service until the CP system is repaired. If repairs cannot be completed, the systems shall be permanently Closed.
 
04/15/2020 4075 Minor 4.10 Cathodic protection systems that do not meet requirements not repaired in 90 days or closed. Have a Corrosion Professional inspect the CP system and repair as necessary. Submit repair & subsequent survey results to this office for review.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
11/01/2010   COMPLETED
 
03/15/1996   COMPLETED 10
 
05/12/1994   COMPLETED 10
 
08/15/1990   ACTIVE 10 PETROLEUM CLEANUP PARTICIPATION PROGRAM-ELIGIBLE