![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Polk | Status | OPEN | ||||||||
ID | 8623499 | Latitude | 28° 1' 32.4086 | ||||||||
Name |
ARIANA FRIENDS INC 1202 ARIANA ST |
Longitude | 81° 58' 25.8852 | ||||||||
LAKELAND, FL 33803-1815 | LL Method | DPHO | |||||||||
Contact | KAMAL M SARKER | LL Status | REVIEWED | ||||||||
Phone | (863) 686-3384 | Status Date | 02/08/2024 | ||||||||
Account Owner Information | |||||||||||
Name | ARIANA FRIENDS INC 1202 ARIANA ST LAKELAND, FL 33803 |
Effective Date | 07/25/2005 | ||||||||
Contact | KAMAL SARKER | ||||||||||
Phone | (863) 686-3384 | ||||||||||
MKAMALCOMILLA@GMAIL.COM | |||||||||||
Placard # / Date | 684423 - 06/06/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | ARIANA FRIENDS INC 1202 ARIANA ST LAKELAND, FL 33803 |
Effective Date | 07/25/2005 | ||||||||
Contact | KAMAL SARKER | ||||||||||
Phone | (863) 686-3384 | ||||||||||
MKAMALCOMILLA@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Unleaded Gas (B) | 01/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (E) Fiberglass (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 12000 | Unleaded Gas (B) | 01/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (E) Fiberglass (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 10/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal | (H) Mechanical line leak detector | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 10/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal | (H) Mechanical line leak detector | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 10/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal | (H) Mechanical line leak detector | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 11/04/2019 | 11/04/2021 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 08/01/2017 | 08/01/2019 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 08/01/2015 | 08/01/2017 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 08/01/2013 | 08/01/2015 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 08/01/2012 | 08/01/2013 | ZURICH-AMERICAN | ||||||||
INSURANCE | 08/01/2011 | 08/01/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 08/01/2011 | 08/01/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 08/01/2011 | 08/01/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 08/01/2010 | 08/01/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 08/01/2009 | 08/01/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 07/01/2007 | 05/01/2008 | FEDERATED MUTUAL | ||||||||
INSURANCE | 09/13/2002 | 09/13/2003 | GREAT AMERICAN | ||||||||
INSURANCE | 03/17/2001 | 03/17/2002 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/14/2000 | 09/14/2001 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 03/10/2006 | 03/24/2006 | IN-COMPLIANCE | SLAPPEY_W | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS. PIPING: UNDERGROUND DOUBLE WALL BLUE FLEX. | |||||||||||
NCLI | 06/30/2005 | 07/02/2005 | NEWBERG_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 06/29/2005 | 07/05/2005 | NEWBERG_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #1103. | |||||||||||
TCI | 05/26/2005 | 07/02/2005 | MINOR OUT-OF-COMPLIANCE | NEWBERG_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: DOUBLE WALLED BLUE FLEX. | |||||||||||
RRBD | 04/02/2004 | 04/19/2004 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED ALL TESTS REQUESTED. RESOLVES VIOLATION #86. | |||||||||||
CWOE | 04/02/2004 | 06/02/2004 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 04/01/2004 | 04/02/2004 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/15/2004 | 04/02/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | SACLARIDES_M | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: DOUBLE-WALLED BLUE FLEX PIPING. RESOLVES VIOLATION #155. | |||||||||||
SV | 06/18/2003 | 06/24/2003 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PURPOSE OF TRIP WAS TO DETERMINE NEW OWNER AND EXPLAIN REGISTRATION CHANGES NEEDED AND VIOLATIONS. | |||||||||||
NCLI | 10/18/2002 | 10/18/2002 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/16/2002 | 10/18/2002 | MINOR OUT-OF-COMPLIANCE | HUGHES_J | 0/2 | COMPLIANCE ASSURANCE | |||||
CALL | 08/31/2001 | 09/06/2001 | HUGHES | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes AL ARGENTI. SCHEDULE INSPECTION | |||||||||||
TCI | 08/31/2001 | 09/06/2001 | IN-COMPLIANCE | HUGHES | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/30/2000 | 10/31/2000 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 10/17/2000 | 10/19/2000 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/06/2000 | 10/19/2000 | MINOR OUT-OF-COMPLIANCE | HUGHES_J | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 10/28/1999 | 11/03/1999 | IN-COMPLIANCE | MEDER_R | 0/2 | COMPLIANCE ASSURANCE | |||||
TIN | 04/19/1999 | 05/06/1999 | IN-COMPLIANCE | NEWBERG_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TXI | 03/30/1999 | 04/15/1999 | IN-COMPLIANCE | NEWBERG_D | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 08/16/2023 | Satisfied | GONZALEZ_OA_1 | Compliance Assistance | |||||||
Electronic Communication | 08/16/2023 | Satisfied | GONZALEZ_OA_1 | Compliance Assistance | |||||||
Electronic Communication | 10/05/2021 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 10/05/2021 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 10/05/2021 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 10/05/2021 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 09/28/2021 | Major Out of Compliance | GLENN_LE_1 | 0/2 | Routine Compliance | ||||||
Incident | 09/28/2021 | Has not led to Discharge | GLENN_LE_1 | Incident | |||||||
Document Management | 09/28/2021 | Satisfied | GLENN_LE_1 | Incident | |||||||
Electronic Communication | 09/13/2021 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 08/14/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 04/08/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 04/08/2019 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 04/08/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 04/05/2019 | Major Out of Compliance | GLENN_LE_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 02/18/2019 | Satisfied | FLEMING_AM_1 | Routine Compliance | |||||||
Electronic Communication | 03/01/2017 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||||||
Electronic Communication | 02/20/2017 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||||||
Electronic Communication | 01/30/2017 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||||||
Site Inspection | 01/30/2017 | Minor Out of Compliance | WILLIAMSON_KE_1 | 0/2 | Routine Compliance | ||||||
Letter | 01/30/2017 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||||||
Phone Conversation | 01/03/2017 | Satisfied | WILLIAMSON_KE_1 | Routine Compliance | |||||||
Electronic Communication | 04/11/2014 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Site Inspection | 04/11/2014 | In Compliance | NEWBERG_DR_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 05/30/2013 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Letter | 05/30/2013 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Site Inspection | 05/30/2013 | Minor Out of Compliance | NEWBERG_DR_1 | 0/2 | Routine Compliance | ||||||
Enforcement Tracking | 01/28/2013 | Closed With Enforcement | MEETZE_A | Enforcement | |||||||
Site Inspection | 03/22/2012 | In Compliance | NEWBERG_DR_1 | 0/2 | Non-Compliance | ||||||
Phone Conversation | 03/22/2012 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Phone Conversation | 02/28/2012 | Satisfied | MEETZE_A | Enforcement | |||||||
Letter | 02/16/2012 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Site Inspection | 02/16/2012 | Minor Out of Compliance | NEWBERG_DR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 02/01/2012 | Satisfied | MEETZE_A | Enforcement | |||||||
Electronic Communication | 01/31/2012 | Satisfied | MEETZE_A | Enforcement | |||||||
Site Inspection | 01/26/2012 | In Compliance | CASSELS_CR_1 | 0/2 | Non-Compliance | ||||||
Phone Conversation | 01/03/2012 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Record Document | 12/21/2011 | Satisfied | BELL_JM_1 | Closure | |||||||
Record Document | 12/20/2011 | Satisfied | BELL_JM_1 | Closure | |||||||
Letter | 12/15/2011 | Satisfied | BELL_JM_1 | Closure | |||||||
TCAR | 12/15/2011 | Satisfied | BELL_JM_1 | Closure | |||||||
Electronic Communication | 12/14/2011 | Satisfied | MEETZE_A | Enforcement | |||||||
Electronic Communication | 12/13/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Electronic Communication | 12/13/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 12/12/2011 | Satisfied | DERY_WC_1 | Closure | |||||||
Electronic Communication | 12/09/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Record Document | 11/28/2011 | Satisfied | MEETZE_A | Enforcement | |||||||
Phone Conversation | 11/28/2011 | Satisfied | MEETZE_A | Enforcement | |||||||
Enforcement Referral | 11/01/2011 | Accepted | MEETZE_A | Enforcement | |||||||
Electronic Communication | 09/12/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Electronic Communication | 09/07/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Electronic Communication | 08/30/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 08/30/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 08/30/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 08/30/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 08/30/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 08/29/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 08/29/2011 | Major Out of Compliance | CASSELS_CR_1 | 0/2 | Closure | ||||||
Site Inspection | 08/29/2011 | Major Out of Compliance | CASSELS_CR_1 | 0/2 | Installation | ||||||
Site Inspection | 08/29/2011 | Major Out of Compliance | CASSELS_CR_1 | 0/2 | Non-Compliance | ||||||
Letter | 08/29/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Letter | 08/29/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 08/23/2011 | Satisfied | COOK_JH_1 | Non-Compliance | |||||||
Phone Conversation | 08/23/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 08/23/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 08/11/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 08/11/2011 | Satisfied | CASSELS_CR_1 | Closure | |||||||
Phone Conversation | 08/11/2011 | Satisfied | CASSELS_CR_1 | Installation | |||||||
Phone Conversation | 08/01/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 07/19/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Letter | 07/08/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 07/08/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 06/20/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 06/20/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Letter | 05/23/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 05/23/2011 | Major Out of Compliance | CASSELS_CR_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 05/28/2010 | Minor Out of Compliance | NEWBERG_DR_1 | 0/2 | Routine Compliance | ||||||
Letter | 05/28/2010 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Record Document | 08/13/2008 | Satisfied | SLAPPEY_WR_1 | Non-Compliance | |||||||
Site Inspection | 07/14/2008 | Major Out of Compliance | SLAPPEY_WR_1 | 0/2 | Routine Compliance | ||||||
Letter | 07/14/2008 | Satisfied | SLAPPEY_WR_1 | Non-Compliance | |||||||
Record Document | 06/23/2008 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 05/30/2008 | Minor Out of Compliance | WINN_JP_1 | 0/2 | Non-Compliance | ||||||
Letter | 05/30/2008 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 09/05/2007 | In Compliance | WINN_JP_1 | 0/2 | Non-Compliance | ||||||
Letter | 09/05/2007 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 07/05/2007 | Major Out of Compliance | WINN_JP_1 | 0/2 | Non-Compliance | ||||||
Site Inspection | 06/04/2007 | Minor Out of Compliance | WINN_JP_1 | 0/2 | Routine Compliance | ||||||
Letter | 06/04/2007 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | DIXON_R | Routine Compliance | |||||||
Emergency Preparedness Information | 02/08/2007 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/27/2006 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
09/28/2021 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | An Incident Notification Form (INF) must be submitted to the Department. | |||||||
09/28/2021 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Integrity testing must be performed on both sumps to verify the integrity, with the results provided to the Department. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/19/1988 | COMPLETED | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||