![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 8623853 | Latitude | 28° 2' 58.1794 | ||||||||
Name |
CIRCLE K #2709799 30501 US HWY 19 N |
Longitude | 82° 44' 17.399 | ||||||||
PALM HARBOR, FL 34684 | LL Method | DPHO | |||||||||
Contact | GRAHAM BIGGS | LL Status | REVIEWED | ||||||||
Phone | (919) 774-6700 | Status Date | 10/15/2003 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 12/05/2006 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 697697 - 06/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MACMILLAN OIL 609 N Hepburn Ave Jupiter, FL 33458-5015 |
Effective Date | 03/23/2004 | ||||||||
Contact | GERLAD DONNINI | ||||||||||
Phone | (561) 768-9327 | ||||||||||
COMPLIANCE@SSMINC.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 03/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 03/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 8000 | Vehicular Diesel (D) | 03/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 06/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 06/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 06/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Vehicular Diesel (D) | 06/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Unleaded Gas (B) | 03/01/1996 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(G) Electronic line leak detector (L) Automatic tank gauging - USTs (Z) DEP approved monitoring |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
GUARANTEE | 08/21/2023 | 08/26/2025 | |||||||||
GUARANTEE | 04/24/2022 | 08/21/2023 | |||||||||
GUARANTEE | 04/25/2021 | 08/27/2022 | |||||||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2012 | 12/01/2013 | CHUBB | ||||||||
INSURANCE | 12/17/2010 | 12/17/2011 | CHUBB | ||||||||
INSURANCE | 12/17/2009 | 12/17/2010 | CHUBB | ||||||||
INSURANCE | 12/17/2008 | 12/17/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
NCLI | 12/12/2005 | 12/22/2005 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/07/2005 | 12/22/2005 | MINOR OUT-OF-COMPLIANCE | BARNETT | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 10/08/2004 | 10/12/2004 | PINK | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/06/2004 | 10/12/2004 | MINOR OUT-OF-COMPLIANCE | PINK | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 10/14/2003 | 10/21/2003 | ROGGELIN | 0/0 | DISCHARGE PROJECT | ||||||
IRFR | 09/12/2003 | 10/21/2003 | ROGGELIN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes Q1 UNLEADED LINE ALARMS CIRCA JULY 2003 SHUTDOWN | |||||||||||
RRBD | 09/05/2003 | 09/15/2003 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 09/04/2003 | 09/15/2003 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/02/2003 | 09/15/2003 | MINOR OUT-OF-COMPLIANCE | TAM | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes DW AMERON FRP PIPING | |||||||||||
LTR | 12/06/2002 | 01/03/2003 | HALSCOTT | 0/0 | DISCHARGE PROJECT | ||||||
NCLI | 12/05/2002 | 12/06/2002 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/04/2002 | 12/06/2002 | MINOR OUT-OF-COMPLIANCE | TAM | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes DW AMERON PIPING | |||||||||||
RRBD | 04/02/2002 | 05/28/2002 | SOWERS | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 02/08/2002 | 02/25/2002 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/07/2002 | 02/24/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | TAM | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/07/2001 | 02/07/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 01/05/2001 | 01/26/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | HALSCOTT | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/17/2000 | 10/30/2000 | HALSCOTT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 06/14/2000 | 06/20/2000 | MINOR OUT-OF-COMPLIANCE | CASTOR | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 01/20/1999 | 03/09/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | PUGH | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Record Document | 02/24/2025 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Record Document | 01/02/2025 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Record Document | 11/20/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Site Inspection | 08/30/2024 | Major Out of Compliance | MUSLIC_A_1 | 0/3 | Routine Compliance | ||||||
Letter | 08/30/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Letter | 08/28/2024 | Satisfied | WIMBERLY_E | Enforcement | |||||||
Electronic Communication | 07/31/2024 | Satisfied | MUSLIC_A_1 | Routine Compliance | |||||||
Record Document | 09/19/2023 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Enforcement Referral | 08/24/2023 | Accepted | SHOCK_E_1 | Enforcement | |||||||
Electronic Communication | 08/18/2023 | Satisfied | SHOCK_E_1 | Routine Compliance | |||||||
Letter | 02/27/2023 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Site Inspection | 02/24/2023 | Major Out of Compliance | SHOCK_E_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 01/30/2023 | Satisfied | SHOCK_E_1 | Routine Compliance | |||||||
Letter | 02/11/2021 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Record Document | 02/11/2021 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Site Inspection | 08/27/2020 | Minor Out of Compliance | STRAUSS_RH_1 | 0/3 | Routine Compliance | ||||||
Letter | 08/27/2020 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Electronic Communication | 07/27/2020 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Letter | 04/25/2018 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Record Document | 04/25/2018 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Letter | 04/06/2018 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Site Inspection | 04/06/2018 | Minor Out of Compliance | STRAUSS_RH_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 03/29/2018 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Electronic Communication | 11/04/2015 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 11/04/2015 | In Compliance | STRAUSS_RH_1 | 0/3 | Routine Compliance | ||||||
Document Management | 10/28/2013 | Complete | ROGGELIN_EM_1 | Closure | |||||||
TCAR | 10/28/2013 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Letter | 10/28/2013 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Electronic Communication | 10/17/2013 | Satisfied | JUEDES_HC_1 | Non-Compliance | |||||||
Site Inspection | 10/17/2013 | In Compliance | JUEDES_HC_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 09/09/2013 | Minor Out of Compliance | JUEDES_HC_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/09/2013 | Satisfied | JUEDES_HC_1 | Routine Compliance | |||||||
Letter | 09/09/2013 | Satisfied | JUEDES_HC_1 | Non-Compliance | |||||||
Electronic Communication | 05/01/2013 | Satisfied | JUEDES_HC_1 | Closure | |||||||
Site Inspection | 05/01/2013 | In Compliance | JUEDES_HC_1 | 0/3 | Closure | ||||||
Site Inspection | 04/30/2013 | In Compliance | JUEDES_HC_1 | 0/3 | Installation | ||||||
Incident | 11/15/2011 | Has not led to Discharge | LONGEN_JL_1 | Incident | |||||||
Incident | 11/15/2011 | Has not led to Discharge | LONGEN_JL_1 | Incident | |||||||
Emergency Preparedness Information | 08/05/2011 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Letter | 08/02/2011 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 08/02/2011 | Minor Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Discharge Reporting | 07/30/2010 | Satisfied | STRAUSS_RH_1 | Discharge | |||||||
Document Management | 07/30/2010 | Complete | STRAUSS_RH_1 | Discharge | |||||||
Record Document | 07/22/2010 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 07/14/2010 | Minor Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Letter | 07/14/2010 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 05/11/2009 | Minor Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Letter | 05/11/2009 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Record Document | 10/02/2008 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Record Document | 08/04/2008 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Letter | 06/27/2008 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 06/27/2008 | Major Out of Compliance | BARNETT_JX | 0/3 | Routine Compliance | ||||||
Record Document | 05/23/2008 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/09/2007 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/20/2006 | Satisfied | BARNETT_JX | Routine Compliance | |||||||
Letter | 09/18/2006 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 09/18/2006 | Minor Out of Compliance | BARNETT_JX | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/24/2023 | 6021 | SNC-B | 4.1 Failure of secondary containment to meet standards including: impervious spill containment, liners, allowing for release detection, allow for monitoring point, and hydrant pit secondary containment. | The secondary piping appears closed to STP sumps in 2 of the 3 sumps. Open secondary piping to all STP sumps. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
05/02/2007 | COMPLETED | 30 | |||||||||
12/01/1989 | COMBINED | 30 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
07/13/1987 | ACTIVE | 30 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||