![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Polk | Status | OPEN | ||||||||
ID | 8624005 | Latitude | 27° 54' 5.3034 | ||||||||
Name |
SUNRISE FOOD MART 131 900 W US 60 |
Longitude | 81° 36' 24.5383 | ||||||||
LAKE WALES, FL 33853 | LL Method | DPHO | |||||||||
Contact | JIGAR PATEL | LL Status | REVIEWED | ||||||||
Phone | (321) 690-0807 | Status Date | 08/05/2003 | ||||||||
Account Owner Information | |||||||||||
Name | PETRO USA LLC 380 COMMERCE PKWY ROCKLEDGE, FL 32955-4208 |
Effective Date | 01/07/2013 | ||||||||
Contact | RAJ SHAH | ||||||||||
Phone | (321) 690-0807 | ||||||||||
PAULA@KARSPETRO.COM | |||||||||||
Placard # / Date | 687273 - 06/12/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | PETRO USA LLC 380 COMMERCE PKWY ROCKLEDGE, FL 32955-4208 |
Effective Date | 01/07/2013 | ||||||||
Contact | RAJ SHAH | ||||||||||
Phone | (321) 690-0807 | ||||||||||
PAULA@KARSPETRO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 12000 | Unleaded Gas (B) | 03/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (E) Cathodic protection (F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 12000 | Unleaded Gas (B) | 03/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (E) Cathodic protection (F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 12000 | Vehicular Diesel (D) | 03/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (E) Cathodic protection (F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 12000 | Aviation Gas (E) | 10/01/2012 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 03/01/1983 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal | (N) Groundwater monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 03/01/1983 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal | (N) Groundwater monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 03/01/1983 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal | (N) Groundwater monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Vehicular Diesel (D) | 03/01/1983 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal | (N) Groundwater monitoring | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | COMMERCE & INDUSTRY | ||||||||||
INSURANCE | 09/01/2023 | 09/01/2024 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/01/2022 | 09/01/2023 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/01/2021 | 09/01/2022 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/01/2020 | 09/01/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2019 | 09/01/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2018 | 09/01/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2017 | 09/01/2018 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2016 | 09/01/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/14/2013 | 09/14/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2013 | 09/01/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2013 | 09/01/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2012 | 09/01/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/05/2005 | 12/05/2006 | ZURICH-AMERICAN | ||||||||
INSURANCE | 12/05/2003 | 12/05/2004 | ZURICH-AMERICAN | ||||||||
INSURANCE | 09/13/2002 | 09/13/2003 | GREAT AMERICAN | ||||||||
INSURANCE | 03/17/2001 | 03/17/2002 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/14/2000 | 09/14/2001 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 08/11/2005 | 08/22/2005 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED LETTER REQUESTING A COPY OF INSPECTION. | |||||||||||
LTR | 08/01/2005 | 09/04/2005 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes VIOLATION FOLLOW-UP LETTER. | |||||||||||
LTR | 07/20/2005 | 09/04/2005 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes VIOLATION FOLLOW-UP LETTER. | |||||||||||
NCLI | 06/22/2005 | 06/22/2005 | HUGHES_J | 0/3 | COMPLIANCE ASSURANCE | ||||||
RRBD | 06/14/2005 | 08/19/2005 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #1004. | |||||||||||
TCI | 05/20/2005 | 06/22/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | HUGHES_J | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes 6 PHOTOS TAKEN. PIPING: ENVIRON GEOFLEX DOUBLE WALL. | |||||||||||
NCLI | 04/01/2004 | 04/05/2004 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REQUESTED COPY OF THE ANNUAL RELEASE DETECTION DEVICES TEST RESULTS. | |||||||||||
TCI | 03/18/2004 | 04/05/2004 | MINOR OUT-OF-COMPLIANCE | SACLARIDES_M | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: ENVIRON GEOFLEX DOUBLE WALL PIPING. RESOLVES VIOLATION #142. | |||||||||||
SV | 06/18/2003 | 06/24/2003 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CHECK ON STORE OWNERSHIP AND VIOLATIONS. | |||||||||||
FR | 06/18/2003 | 06/24/2003 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #127 WHICH WAS GIVEN BY INSPECTOR IN ERROR. | |||||||||||
NCLI | 10/15/2002 | 10/15/2002 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/14/2002 | 10/15/2002 | MINOR OUT-OF-COMPLIANCE | HUGHES_J | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/17/2001 | 11/28/2001 | HUGHES | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PAPERWORK SHOWING REMOVAL AND DISPOSAL OF EXCESS LIQUID RECEIVED | |||||||||||
NCLI | 09/06/2001 | 09/06/2001 | HUGHES | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/31/2001 | 09/06/2001 | MINOR OUT-OF-COMPLIANCE | HUGHES | 0/3 | COMPLIANCE ASSURANCE | |||||
CALL | 08/14/2001 | 09/06/2001 | HUGHES | 0/0 | COMPLIANCE ASSURANCE | ||||||
CWOE | 12/14/2000 | 12/22/2000 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/14/2000 | 12/22/2000 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 10/19/2000 | 10/24/2000 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/06/2000 | 10/24/2000 | MINOR OUT-OF-COMPLIANCE | HUGHES_J | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/27/1999 | 11/01/1999 | IN-COMPLIANCE | MEDER_R | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 03/19/1999 | 05/11/1999 | IN-COMPLIANCE | CASTOR_M | 0/3 | COMPLIANCE ASSURANCE | |||||
TXI | 03/19/1999 | 04/19/1999 | IN-COMPLIANCE | CASTOR_M | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 06/21/2024 | Major Out of Compliance | GLENN_LE_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 09/01/2023 | Satisfied | CASSELS_CR_2 | Discharge | |||||||
Phone Conversation | 09/01/2023 | Satisfied | CASSELS_CR_2 | Discharge | |||||||
Letter | 09/01/2023 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Document Management | 09/01/2023 | Satisfied | CASSELS_CR_2 | Incident | |||||||
Document Management | 09/01/2023 | Satisfied | CASSELS_CR_2 | Discharge | |||||||
Electronic Communication | 09/01/2023 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Electronic Communication | 09/01/2023 | Satisfied | CASSELS_CR_2 | Discharge | |||||||
Electronic Communication | 09/01/2023 | Satisfied | CASSELS_CR_2 | Discharge | |||||||
Electronic Communication | 09/01/2023 | Satisfied | CASSELS_CR_2 | Discharge | |||||||
Electronic Communication | 09/01/2023 | Satisfied | CASSELS_CR_2 | Discharge | |||||||
Site Inspection | 08/31/2023 | Major Out of Compliance | CASSELS_CR_2 | 0/1 | Discharge | ||||||
Electronic Communication | 08/21/2023 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Document Management | 08/16/2023 | Satisfied | CASSELS_CR_2 | Closure | |||||||
Electronic Communication | 11/05/2020 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 11/05/2020 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 11/05/2020 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 11/05/2020 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 11/05/2020 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Site Inspection | 11/05/2020 | Major Out of Compliance | GLENN_LE_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 02/21/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 01/14/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 01/03/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/21/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 11/21/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 11/21/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 11/14/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 11/14/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 11/14/2018 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 11/14/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 11/14/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 10/30/2018 | Minor Out of Compliance | GLENN_LE_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 11/06/2017 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 11/06/2017 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 11/06/2017 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 09/19/2016 | Satisfied | GLENN_LE_1 | Non-Compliance | |||||||
Letter | 09/19/2016 | Satisfied | GLENN_LE_1 | Non-Compliance | |||||||
Site Inspection | 09/19/2016 | Minor Out of Compliance | GLENN_LE_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 03/16/2015 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Letter | 05/30/2014 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Electronic Communication | 05/30/2014 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Site Inspection | 05/30/2014 | Major Out of Compliance | NEWBERG_DR_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 01/02/2014 | In Compliance | WINN_JP_1 | 0/3 | Installation | ||||||
Record Document | 08/16/2013 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Discharge Reporting | 05/02/2013 | Satisfied | DERY_WC_1 | Discharge | |||||||
Document Management | 05/02/2013 | Complete | DERY_WC_1 | Discharge | |||||||
Electronic Communication | 05/01/2013 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 04/10/2013 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Electronic Communication | 04/10/2013 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 04/10/2013 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
TCAR | 02/05/2013 | Satisfied | DERY_WC_1 | Closure | |||||||
Letter | 02/05/2013 | Satisfied | DERY_WC_1 | Discharge | |||||||
Letter | 01/09/2013 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Record Document | 01/09/2013 | Satisfied | NEWBERG_DR_1 | Closure | |||||||
Electronic Communication | 01/09/2013 | Satisfied | DERY_WC_1 | Installation | |||||||
Letter | 12/28/2012 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Site Inspection | 12/28/2012 | Major Out of Compliance | NEWBERG_DR_1 | 0/3 | Closure | ||||||
Record Document | 12/21/2012 | Satisfied | DERY_WC_1 | Installation | |||||||
Site Inspection | 12/12/2011 | In Compliance | BELL_JM_1 | 0/3 | Non-Compliance | ||||||
Electronic Communication | 10/06/2011 | Satisfied | BELL_JM_1 | Non-Compliance | |||||||
Electronic Communication | 10/06/2011 | Satisfied | BELL_JM_1 | Non-Compliance | |||||||
Phone Conversation | 09/16/2011 | Satisfied | BELL_JM_1 | Non-Compliance | |||||||
Enforcement Tracking | 09/06/2011 | Closed With Enforcement | PEDIGO_L | Enforcement | |||||||
Letter | 08/11/2011 | Satisfied | BELL_JM_1 | Non-Compliance | |||||||
Site Inspection | 08/11/2011 | Major Out of Compliance | BELL_JM_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 06/23/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 05/24/2011 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 05/24/2011 | Major Out of Compliance | WINN_JP_1 | 0/3 | Routine Compliance | ||||||
Document Management | 09/14/2010 | Complete | DERY_WC_1 | Discharge | |||||||
Letter | 05/17/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 05/17/2010 | Major Out of Compliance | DERY_WC_1 | 0/3 | Routine Compliance | ||||||
Record Document | 01/01/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 04/15/2009 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Letter | 03/24/2009 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 02/27/2009 | Major Out of Compliance | CASSELS_CR_1 | 0/3 | Routine Compliance | ||||||
Letter | 02/27/2009 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 02/18/2009 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
Issue Document | 02/05/2009 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
Letter | 02/05/2009 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Issue Document | 06/10/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Issue Document | 04/02/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 04/01/2008 | Major Out of Compliance | WINN_JP_1 | 0/3 | Discharge | ||||||
Letter | 04/01/2008 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Letter | 03/11/2008 | Satisfied | DERY_WC_1 | Discharge | |||||||
TCAR | 03/11/2008 | Satisfied | DERY_WC_1 | Closure | |||||||
Letter | 02/05/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 02/05/2008 | Major Out of Compliance | DERY_WC_1 | 0/3 | Closure | ||||||
Site Inspection | 02/05/2008 | Major Out of Compliance | DERY_WC_1 | 0/3 | Installation | ||||||
Site Inspection | 02/04/2008 | Major Out of Compliance | WINN_JP_1 | 0/3 | Closure | ||||||
Letter | 02/04/2008 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 01/30/2008 | Major Out of Compliance | DERY_WC_1 | 0/3 | Routine Compliance | ||||||
Letter | 01/30/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Enforcement Referral | 01/21/2008 | Accepted | PEDIGO_L | Enforcement | |||||||
Phone Conversation | 10/25/2007 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Issue Document | 10/17/2007 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 05/25/2007 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 05/24/2007 | Major Out of Compliance | DERY_WC_1 | 0/3 | Routine Compliance | ||||||
Issue Document | 05/10/2007 | Satisfied | COOK_JH_1 | Non-Compliance | |||||||
Enforcement Referral Activity - OLD | 05/10/2007 | Terminated | CULBRETH_L | Enforcement | |||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/26/2006 | Satisfied | CROWELL_MP | Routine Compliance | |||||||
Phone Conversation | 06/26/2006 | Satisfied | CROWELL_MP | Routine Compliance | |||||||
Phone Conversation | 06/26/2006 | Satisfied | CROWELL_MP | Routine Compliance | |||||||
Site Inspection | 06/23/2006 | Major Out of Compliance | CROWELL_MP | 0/3 | Routine Compliance | ||||||
Letter | 06/23/2006 | Satisfied | CROWELL_MP | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
06/21/2024 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | The next two monthly records (July & August) of the alarm history, sensor status and testing results must be provided to the Department. | |||||||
06/21/2024 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Because 2023 records were available the violation will be resolved with the issuance of the Compliance Assistance Offer (CAO). | |||||||
06/21/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Dispenser liners must be cleaned and the Department notified. | |||||||
06/21/2024 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Complete a Storage Tank Facility Registration Form and submit to the Department or you can use FDEPs online portal (ESSA) to make the corrections https://floridadep.gov/waste/permitting-compliance-assistance/content/storagetank-facility-registration. | |||||||
06/21/2024 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | An Incident Notification Form (INF) must be completed and submitted to the Department. | |||||||
06/21/2024 | 6074 | Minor | 2.8 Improper maintenance of records. Records requiring to be maintained for 3 years or for the life of the system not kept by facility. Records not provided within 5 business days. | Documentation for the work performed, including all associated test records must be provided to the Department. | |||||||
06/21/2024 | 6048 | SNC-B | 4.4 Dispenser sumps not installed to allow for release detection. | Deflector plating must be installed in each dispenser to direct any possible leaks to the liners and the Department notified. | |||||||
06/21/2024 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | An investigation must be performed immediately to determine the integrity status of the tank, with the results provided to the Department. | |||||||
06/21/2024 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | An investigation must be performed immediately to determine the integrity status of the tank, with the results provided to the Department. | |||||||
06/21/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | 2020 and 2023 testing records or a written and signed statement stating testing was not performed in 2020 and 2023 must be provided to the department. | |||||||
06/21/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | 2023 testing records or a written and signed statement stating testing was not performed in 2023 must be provided to the department. | |||||||
06/21/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | PCW must be removed, disposed of properly and the Department notified. | |||||||
06/21/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | 2020 and 2023 testing records or a written and signed statement stating testing was not performed in 2020 and 2023 must be provided to the department. | |||||||
06/21/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Outer sump cover must be replaced and the Department notified. | |||||||
06/21/2024 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | An Incident Notification Form (INF) must be completed and submitted to the Department. | |||||||
06/21/2024 | 6002 | Minor | 2.1 Operator Training records not available. | The class A, B, and C operator certifications are overdue and must be obtained immediately with copies of the certificates provided to the Department. | |||||||
11/05/2020 | 4016 | SNC-B | 2.5 Incident investigation not initiated within 24-hours of discovery. | An Incident Notification Form (INF) must be submitted to the Department and an investigation performed to determine the source of the liquid intrusion with the results provided to the Department. | |||||||
11/05/2020 | 4012 | Minor | 2.3 For an incident, notification not received in a timely manner. | An Incident Notification Form (INF) must be submitted to the Department and an investigation performed to determine the source of the liquid intrusion with the results provided to the Department. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/13/2012 | INACTIVE | BRUTCHER_CE_1 | |||||||||
01/29/2008 | COMPLETED | 50 | |||||||||
02/15/1994 | COMPLETED | 45 | |||||||||
02/15/1994 | COMPLETED | 45 | PETROLEUM CLEANUP PARTICIPATION PROGRAM-ELIGIBLE | ||||||||
12/19/1988 | ACTIVE | 50 | EARLY DETECTION INCENTIVE-ELIGIBLE | BRUTCHER_CE_1 | |||||||