Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Polk | Status | OPEN | ||||||||
ID | 8624034 | Latitude | 28° 3' 30.0823 | ||||||||
Name |
UNITED OIL #238 123 MAGNOLIA AVE |
Longitude | 81° 47' 5.9516 | ||||||||
AUBURNDALE, FL 33823-4201 | LL Method | DPHO | |||||||||
Contact | HAMID GHANNAD | LL Status | REVIEWED | ||||||||
Phone | (813) 241-4610 | Status Date | 07/29/2023 | ||||||||
Account Owner Information | |||||||||||
Name | United Oil Co Inc 15429 N Florida Ave Tampa, FL 33613-1235 |
Effective Date | 06/11/2021 | ||||||||
Contact | Hamid Ghannad | ||||||||||
Phone | (813) 241-4610 | ||||||||||
SARA@UNITEDOILFLORIDA.COM | |||||||||||
Placard # / Date | 692047 - 06/20/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | 123 MAGNOLIA AVENUE LLC 15429 N FLORIDA AVE TAMPA, FL 33613 |
Effective Date | 12/02/2020 | ||||||||
Contact | HAMID GHANNAD | ||||||||||
Phone | (813) 241-4610 | ||||||||||
HAMID@UNITEDOILFLORIDA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 16000 | Ethanol E10 (8) | 07/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Unleaded Gas (B) | 08/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1UR | 2000 | Unknown/Not Reported (Y) | 01/01/1970 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Unleaded Gas (B) | 08/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2UR | 2000 | Unknown/Not Reported (Y) | 01/01/1970 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Vehicular Diesel (D) | 08/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 5000 | Unleaded Gas (B) | 08/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 5000 | Unleaded Gas (B) | 08/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 5000 | Unleaded Gas (B) | 08/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 5000 | Unleaded Gas (B) | 08/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 2000 | Kerosene (K) | 08/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | COMMERCE & INDUSTRY | ||||||||||
INSURANCE | COMMERCE & INDUSTRY | ||||||||||
INSURANCE | 12/09/2022 | 12/09/2023 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 12/09/2021 | 12/09/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 12/09/2020 | 12/09/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 02/28/2020 | 02/28/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 02/28/2019 | 02/28/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 02/28/2018 | 02/28/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 02/28/2017 | 02/28/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/29/2016 | 02/28/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/04/2015 | 02/28/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/28/2011 | 06/28/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 06/28/2010 | 06/28/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 06/28/2009 | 06/28/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 06/28/2007 | 06/28/2008 | ZURICH-AMERICAN | ||||||||
INSURANCE | 10/01/2003 | 10/01/2003 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/31/2000 | 12/30/2001 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/31/2000 | 12/30/2001 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/31/1991 | 06/30/1995 | FPLIPA | ||||||||
INSURANCE | 08/31/1989 | 08/31/1991 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
WLI | 04/12/2006 | 04/13/2006 | RICCI_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FOR PREVIOUS OWNER, TAI TRAN | |||||||||||
WLI | 04/12/2006 | 04/13/2006 | RICCI_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FOR CURRENT OWNER, JAY SONI LEAK DETECTOR NOT TESTED ANNUALLY | |||||||||||
EPI | 03/24/2006 | 04/13/2006 | RICCI_L | /0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ENFORCEMENT CASE WITH THE CURRENT OWNER, JAY SONI | |||||||||||
EPI | 03/24/2006 | 04/13/2006 | RICCI_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ENFORCEMENT CASE WITH TAI TRAN, PREVIOUS OWNER | |||||||||||
TCI | 02/20/2006 | 03/09/2006 | IN-COMPLIANCE | HUGHES_J | 0/8 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS. PIPING: AMERON DUALLOY 3000 AMBER DOUBLE WALL FIBERGLASS. VIOLATIONS RESOLVED: 3. | |||||||||||
RRBD | 02/22/2005 | 03/01/2005 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATON #1009 & 1103. | |||||||||||
NCLI | 02/08/2005 | 02/09/2005 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REQUESTED: LLDT RESULTS & COMPLETED REGISTRATION FORM. | |||||||||||
TCI | 01/13/2005 | 03/01/2005 | MINOR OUT-OF-COMPLIANCE | HUGHES_J | 0/8 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: AMERON DUALLOY 3000 AMBER. | |||||||||||
CALL | 08/24/2004 | 08/26/2004 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes HURRICANE CHARLIE ASSESSMENT. CONTACT JASON SHEPHARD OF MID STATE ENERGY. DAMAGE TO A COUPLE DISPENSERS, CANOPIES, AND SOME ROOF DAMAGE. NO ENVIRONMENTAL CONCERNS. | |||||||||||
CRDE | 11/18/2003 | 11/21/2003 | JENKINS_N | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 11/17/2003 | 11/18/2003 | JENKINS_N | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes WARNING NOTICE. | |||||||||||
TCR | 11/07/2003 | 11/17/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | SACLARIDES_M | 0/8 | COMPLIANCE ASSURANCE | |||||
Completion Notes 1 PHOTO TAKEN. RESOLVES VIOLATION #95 | |||||||||||
RRBD | 11/05/2003 | 11/17/2003 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #151, 155, 160 | |||||||||||
RRBD | 06/19/2003 | 06/24/2003 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #103. | |||||||||||
RRBD | 06/11/2003 | 06/16/2003 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #3. | |||||||||||
SV | 06/10/2003 | 06/16/2003 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes MET TO TRY TO EXPLAIN VIOLATIONS TO MR TIA TRAN. | |||||||||||
NCLI | 03/31/2003 | 04/02/2003 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/19/2003 | 04/02/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | SACLARIDES_M | 0/8 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/01/2002 | 07/08/2002 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 05/30/2002 | 07/08/2002 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 05/14/2002 | 07/08/2002 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 05/10/2002 | 07/08/2002 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 05/10/2002 | 05/20/2002 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/08/2002 | 05/20/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | HUGHES_J | 0/8 | COMPLIANCE ASSURANCE | |||||
SV | 04/29/2002 | 05/01/2002 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes EXPLAIN REQUIRED PAPERWORK | |||||||||||
RRBD | 04/20/2002 | 05/20/2002 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 04/20/2002 | 05/20/2002 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 06/14/2001 | 06/15/2001 | RANDOLPH | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 04/13/2001 | 06/15/2001 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 04/05/2001 | 04/09/2001 | RANDOLPH | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/27/2001 | 04/09/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | RANDOLPH | 0/8 | COMPLIANCE ASSURANCE | |||||
CWOE | 11/16/1999 | 11/17/1999 | RONEY_B | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 11/16/1999 | 11/17/1999 | RONEY_B | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 11/15/1999 | 11/17/1999 | RONEY_B | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 10/05/1999 | 11/10/1999 | RONEY_B | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/28/1999 | 10/07/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | RONEY_B | 0/8 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 07/29/2023 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 07/29/2023 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Site Inspection | 07/29/2023 | Major Out of Compliance | GLENN_LE_1 | 0/1 | Routine Compliance | ||||||
Letter | 07/29/2023 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 07/29/2023 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 05/25/2020 | Major Out of Compliance | JARRETT_SE_1 | 0/1 | Routine Compliance | ||||||
Letter | 05/25/2020 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 05/25/2020 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 05/25/2020 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 05/25/2020 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 05/25/2020 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 06/20/2017 | Satisfied | WILLIAMSON_KE_1 | Compliance Assistance | |||||||
Letter | 06/20/2017 | Satisfied | WILLIAMSON_KE_1 | Compliance Assistance | |||||||
Electronic Communication | 06/20/2017 | Satisfied | WILLIAMSON_KE_1 | Compliance Assistance | |||||||
Site Inspection | 05/12/2017 | Minor Out of Compliance | WILLIAMSON_KE_1 | 0/1 | Routine Compliance | ||||||
Letter | 05/12/2017 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||||||
Electronic Communication | 04/14/2017 | Satisfied | WILLIAMSON_KE_1 | Routine Compliance | |||||||
Enforcement Referral | 06/30/2016 | Rejected | JARRETT_SE_1 | Enforcement | |||||||
Electronic Communication | 06/24/2016 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Site Inspection | 06/24/2016 | In Compliance | JARRETT_SE_1 | 0/1 | Non-Compliance | ||||||
Electronic Communication | 06/24/2016 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Record Document | 04/12/2016 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Letter | 03/30/2016 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Electronic Communication | 03/30/2016 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Electronic Communication | 03/30/2016 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Letter | 02/26/2015 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Electronic Communication | 02/26/2015 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Site Inspection | 02/26/2015 | Major Out of Compliance | JARRETT_SE_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 05/12/2014 | Satisfied | WINN_JP_1 | Routine Compliance | |||||||
Site Inspection | 07/06/2011 | In Compliance | SLAPPEY_WR_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 07/08/2010 | In Compliance | BELL_JM_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 09/01/2009 | Satisfied | SLAPPEY_WR_1 | Routine Compliance | |||||||
Site Inspection | 07/10/2009 | In Compliance | SLAPPEY_WR_1 | 0/1 | Routine Compliance | ||||||
Record Document | 08/05/2008 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 07/31/2008 | Major Out of Compliance | WINN_JP_1 | 0/1 | Routine Compliance | ||||||
Letter | 07/31/2008 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Issue Document | 06/05/2008 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
TCAR | 03/06/2008 | Satisfied | DERY_WC_1 | Closure | |||||||
Record Document | 12/17/2007 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Enforcement Tracking | 11/26/2007 | Closed With Enforcement | MEETZE_A | Enforcement | |||||||
Phone Conversation | 11/07/2007 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Record Document | 11/05/2007 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Letter | 10/31/2007 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Site Inspection | 10/31/2007 | Minor Out of Compliance | DERY_WC_1 | 0/1 | Installation | ||||||
Enforcement Referral | 10/23/2007 | Accepted | MEETZE_A | Enforcement | |||||||
Site Inspection | 07/20/2007 | In Compliance | SLAPPEY_WR_1 | 0/9 | Closure | ||||||
Letter | 07/12/2007 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 07/12/2007 | In Compliance | DERY_WC_1 | 0/10 | Closure | ||||||
Site Inspection | 06/12/2007 | Minor Out of Compliance | DERY_WC_1 | 0/8 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | COOK_JH_1 | Routine Compliance | |||||||
Issue Document | 12/07/2006 | Satisfied | RICCI_L | Enforcement | |||||||
Phone Conversation | 12/06/2006 | Satisfied | RICCI_L | Enforcement | |||||||
Issue Document | 12/06/2006 | Satisfied | RICCI_L | Enforcement | |||||||
Record Document | 12/06/2006 | Satisfied | RICCI_L | Enforcement | |||||||
Emergency Preparedness Information | 10/02/2006 | Satisfied | COOK_JH_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
07/29/2023 | 6030 | SNC-B | 4.2 Any component(s) of storage tank system not installed according to reference standards. | An investigation must be performed to determine if ball check valves are installed if so, PEI must be complied with and either the overfill prevention valves or ball check valves removed with the remaining overfill device achieving a passing operability test and either remove the coaxial drop tubes and install straight drop tubes for use with dual point vapor recovery or remove the ball check valves and the Department notified. | |||||||
07/29/2023 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Complete a Storage Tank Facility Registration Form and submit to the Department or you can use FDEPs online portal (ESSA) to make the corrections https://floridadep.gov/waste/permitting-compliance-assistance/content/storagetank-facility-registration. | |||||||
07/29/2023 | 6076 | Minor | 4.7 Requirements not met for out-of-service systems. | Facility registration must be updated immediately to reflect the ”In Service” status. | |||||||
07/29/2023 | 6074 | Minor | 2.8 Improper maintenance of records. Records requiring to be maintained for 3 years or for the life of the system not kept by facility. Records not provided within 5 business days. | Documentation for the replacement, including all associated test records must be provided to the Department. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
08/21/1996 | ACTIVE | 30 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
09/07/1994 | COMPLETED | 26 | |||||||||