![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Polk | Status | OPEN | ||||||||
ID | 8624186 | Latitude | 28° 3' 18.7503 | ||||||||
Name |
WACHULA FOOD LLC 1144 E MEMORIAL BLVD |
Longitude | 81° 56' 27.9975 | ||||||||
LAKELAND, FL 33801-2022 | LL Method | DPHO | |||||||||
Contact | WACHULA FOOD LLC | LL Status | REVIEWED | ||||||||
Phone | (863) 688-0707 | Status Date | 02/12/2024 | ||||||||
Account Owner Information | |||||||||||
Name | WACHULA FOOD LLC 1144 EAST MEMORIAL BLVD LAKELAND, FL 33801 |
Effective Date | 12/18/2019 | ||||||||
Contact | TEJ K KARKI | ||||||||||
Phone | (596) 688-0707 | ||||||||||
TKARKI@HOTMAIL.COM | |||||||||||
Placard # / Date | 702576 - 10/23/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | WACHULA FOOD LLC 1144 EAST MEMORIAL BLVD LAKELAND, FL 33801 |
Effective Date | 12/18/2019 | ||||||||
Contact | TEJ K KARKI | ||||||||||
Phone | (596) 688-0707 | ||||||||||
TKARKI@HOTMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 20000 | Unleaded Gas (B) | 10/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 07/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 07/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 07/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Unleaded Gas (B) | 05/01/1972 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 3000 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 3000 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 6000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 11/22/2021 | 11/22/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 11/22/2019 | 11/22/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 09/26/2017 | 09/26/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/26/2015 | 09/26/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/18/2013 | 01/18/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/03/2012 | 01/03/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/03/2011 | 01/03/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/02/2009 | 05/02/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 05/02/2008 | 05/02/2009 | ZURICH-AMERICAN | ||||||||
INSURANCE | 04/03/2003 | 04/03/2004 | MID-CONTINENT | ||||||||
INSURANCE | 04/03/2001 | 04/03/2002 | GREAT AMERICAN | ||||||||
INSURANCE | 02/13/2001 | 02/13/2002 | GREAT AMERICAN | ||||||||
INSURANCE | 03/02/2000 | 03/02/2001 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 07/01/2005 | 08/01/2005 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #1103 & 1004. | |||||||||||
LTR | 06/23/2005 | 06/24/2005 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FOLLOW-UP VIOLATION LETTER. | |||||||||||
NCLI | 06/13/2005 | 06/13/2005 | CROWELL_M | 0/3 | COMPLIANCE ASSURANCE | ||||||
IRFR | 04/18/2005 | 04/19/2005 | CROWELL_M | 0/0 | DISCHARGE PROJECT | ||||||
TCI | 04/18/2005 | 06/13/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | CROWELL_M | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes 2 PHOTOS TAKEN. PIPING-UNDERGROUND DOUBLE-WALL RIGID FIBERGLASS AMERON DUALOY 3000/L-EQ-378. | |||||||||||
TCI | 01/26/2004 | 02/02/2004 | IN-COMPLIANCE | HUGHES_J | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING-UNDERGROUND DOUBLE-WALL FIBERGLASS AMERON DUALOY 3000/L-EQ-378 | |||||||||||
TCI | 05/19/2003 | 06/03/2003 | IN-COMPLIANCE | SACLARIDES_T | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes 1 PHOTO TAKEN. | |||||||||||
CWOE | 06/25/2002 | 06/26/2002 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 06/25/2002 | 06/26/2002 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 03/08/2002 | 03/14/2002 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/04/2002 | 03/14/2002 | MINOR OUT-OF-COMPLIANCE | SACLARIDES_M | 0/3 | COMPLIANCE ASSURANCE | |||||
CALL | 02/21/2002 | 03/14/2002 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LFT MSG TO SCHEDULE TCI AND RECORDS REVIEW-HARRY BATRA | |||||||||||
RRBD | 05/30/2001 | 05/31/2001 | SACLARIDES | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 04/12/2001 | 04/16/2001 | SACLARIDES | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/13/2001 | 04/03/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | SACLARIDES | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 01/16/2001 | 02/26/2001 | IN-COMPLIANCE | HUGHES | 0/3 | COMPLIANCE ASSURANCE | |||||
SV | 12/21/2000 | 12/27/2000 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
WLI | 12/19/2000 | 12/19/2000 | JENKINS_N | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 08/03/2000 | 08/15/2000 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
CRDE | 07/18/2000 | 07/19/2000 | JENKINS_N | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 05/11/2000 | 05/31/2000 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 05/09/2000 | 05/31/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | HUGHES_J | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 03/27/2000 | 03/29/2000 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/14/2000 | 03/29/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | HUGHES_J | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 08/06/1999 | 08/09/1999 | NEWBERG_D | 0/3 | COMPLIANCE ASSURANCE | ||||||
TIN | 04/23/1999 | 08/11/1999 | MINOR OUT-OF-COMPLIANCE | NEWBERG_D | 0/3 | COMPLIANCE ASSURANCE | |||||
TXI | 04/21/1999 | 08/09/1999 | IN-COMPLIANCE | NEWBERG_D | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 11/25/2024 | Major Out of Compliance | GLENN_LE_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 09/06/2024 | Satisfied | ORHUE_OR_1 | Compliance Assistance | |||||||
Electronic Communication | 08/16/2023 | Satisfied | GONZALEZ_OA_1 | Compliance Assistance | |||||||
Site Inspection | 06/01/2022 | Major Out of Compliance | GLENN_LE_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 12/10/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/10/2019 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Letter | 12/10/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 12/05/2019 | Major Out of Compliance | GLENN_LE_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 04/13/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 04/13/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 04/13/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 03/13/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Enforcement Tracking | 03/09/2018 | Closed Without Enforcement | SELLERS_R | Enforcement | |||||||
Incident | 03/08/2018 | Has not led to Discharge | GLENN_LE_1 | Incident | |||||||
Document Management | 03/08/2018 | Satisfied | GLENN_LE_1 | Incident | |||||||
Electronic Communication | 03/01/2018 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 03/01/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 03/01/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 02/26/2018 | Minor Out of Compliance | GLENN_LE_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 02/23/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Issue Document | 02/13/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Enforcement Referral | 01/22/2018 | Accepted | GLENN_LE_1 | Enforcement | |||||||
Issue Document | 01/22/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/29/2017 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/29/2017 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 04/28/2016 | Satisfied | MERRYMAN_DT_1 | Non-Compliance | |||||||
Electronic Communication | 04/01/2016 | Satisfied | MERRYMAN_DT_1 | Non-Compliance | |||||||
Electronic Communication | 04/01/2016 | Satisfied | MERRYMAN_DT_1 | Non-Compliance | |||||||
Site Inspection | 01/26/2016 | Major Out of Compliance | MERRYMAN_DT_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 01/26/2016 | Satisfied | MERRYMAN_DT_1 | Routine Compliance | |||||||
Letter | 01/26/2016 | Satisfied | MERRYMAN_DT_1 | Non-Compliance | |||||||
Site Inspection | 11/22/2013 | In Compliance | WINN_JP_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 11/22/2013 | Satisfied | WINN_JP_1 | Routine Compliance | |||||||
Electronic Communication | 05/01/2013 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Site Inspection | 04/02/2012 | In Compliance | CASSELS_CR_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 02/22/2011 | In Compliance | BELL_JM_1 | 0/1 | Installation | ||||||
Record Document | 11/02/2010 | Satisfied | DERY_WC_1 | Installation | |||||||
TCAR | 01/28/2010 | Satisfied | BELL_JM_1 | Closure | |||||||
Letter | 01/28/2010 | Satisfied | BELL_JM_1 | Closure | |||||||
Site Inspection | 12/21/2009 | In Compliance | SLAPPEY_WR_1 | 0/3 | Closure | ||||||
Phone Conversation | 04/15/2009 | Satisfied | SLAPPEY_WR_1 | Routine Compliance | |||||||
Site Inspection | 04/15/2009 | In Compliance | SLAPPEY_WR_1 | 0/3 | Routine Compliance | ||||||
Record Document | 08/12/2008 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Letter | 06/13/2008 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Phone Conversation | 06/13/2008 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Site Inspection | 06/13/2008 | Major Out of Compliance | NEWBERG_DR_1 | 0/3 | Routine Compliance | ||||||
Record Document | 06/25/2007 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 06/25/2007 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 06/13/2007 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 06/12/2007 | Satisfied | COOK_JH_1 | Routine Compliance | |||||||
Site Inspection | 06/01/2007 | Major Out of Compliance | DERY_WC_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 05/03/2007 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/08/2007 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/27/2006 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
Record Document | 07/10/2006 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Site Inspection | 06/06/2006 | Minor Out of Compliance | NEWBERG_DR_1 | 0/3 | Routine Compliance | ||||||
Letter | 06/06/2006 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Phone Conversation | 05/24/2006 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/25/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Because testing has been performed the violation will be resolved with the issuance of the Compliance Assistance Offer (CAO). | |||||||
11/25/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Interstice port must be repaired or replaced and the Department notified. | |||||||
11/25/2024 | 6060 | SNC-B | 4.11 Release detection methods do not meet monitoring requirements. | Vacuum gauge must be repaired or replaced and the Department notified. | |||||||
06/01/2022 | 6062 | Minor | 2.5 Release detection devices not tested annually. | 2019, 2020 and 2021 testing records or a written and signed statement stating testing was not performed must be provided to the Department. | |||||||
12/05/2019 | 4014 | SNC-B | 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. | Proof of financial responsibility (a signed copy of the full policy/declarations page) for the 2018 through 2020 coverage period must be provided to the Department. | |||||||
12/05/2019 | 4015 | Minor | 2.10 Incomplete documentation demonstrating financial responsibility. | Financial Responsibility Mechanism either Part C or Part D (not both) must be completed by the insurance provider (usually found as last few pages in full policy packet) for the 2018 through 2019 coverage period and CFR-Part P forms must be completed by facility personnel for the 2018 through 2020 coverage period with copies provided to the Department. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
11/01/1988 | ACTIVE | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||