Report Run Date: 02/02/2025        Last Data Refresh: 02/01/2025        Report Generated from DOPPLER
 
District Southwest   Type    Retail Station
 
County Polk   Status    OPEN
 
ID 8624302   Latitude    27° 51' 24.5646
 
Name RAMA FOOD MART LLC
16311 HWY 27
Longitude    81° 35' 10.533
  LAKE WALES, FL 33859-2523 LL Method    DPHO
 
Contact RAJ KUMAR   LL Status    REVIEWED
 
Phone (863) 246-0372   Status Date    03/08/2024
 
Account Owner Information
 
Name RAMA FOOD MART LLC
16311 US 27
LAKE WALES, FL 33859
Effective Date    05/15/2017
 
Contact RAJ KUMAR
 
Phone (863) 246-0372
 
Email RAMAFOODMARTLLC@GMAIL.COM
  Placard # / Date    677850 - 06/04/2024
Property Owner Information
 
Name RAMA FOOD MART LLC
16311 US 27
LAKE WALES, FL 33859
Effective Date    05/15/2017
 
Contact RAJ KUMAR
 
Phone (863) 246-0372
 
Email RAMAFOODMARTLLC@GMAIL.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
10 8000 Unleaded Gas (B) 12/01/1998 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
8 12000 Unleaded Gas (B) 12/01/1998 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
9 12000 Vehicular Diesel (D) 12/01/1998 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
1 4000 Unleaded Gas (B) 06/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(B) Internal lining
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(8) Manually sampled wells
(N) Groundwater monitoring
 
 
Tank Tank Size Content Installed Placement Status
11 12000 Unleaded Gas (B) 12/01/1998 UNDERGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (D) External protective coating
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(F) Monitor dbl wall tank space
(L) Automatic tank gauging - USTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
12 12000 Vehicular Diesel (D) 12/01/1998 UNDERGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(F) Monitor dbl wall tank space
(L) Automatic tank gauging - USTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
13 8000 Unleaded Gas (B) 12/01/1998 UNDERGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (D) External protective coating
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
2 4000 Unleaded Gas (B) 06/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(B) Internal lining
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(8) Manually sampled wells
(N) Groundwater monitoring
 
 
Tank Tank Size Content Installed Placement Status
3 4000 Unleaded Gas (B) 06/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(B) Internal lining
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(8) Manually sampled wells
(N) Groundwater monitoring
 
 
Tank Tank Size Content Installed Placement Status
4 4000 Unleaded Gas (B) 06/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(B) Internal lining
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(8) Manually sampled wells
(N) Groundwater monitoring
 
 
Tank Tank Size Content Installed Placement Status
5 4000 Vehicular Diesel (D) 06/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(B) Internal lining
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(8) Manually sampled wells
(N) Groundwater monitoring
 
 
Tank Tank Size Content Installed Placement Status
6 4000 Vehicular Diesel (D) 06/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(B) Internal lining
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(8) Manually sampled wells
(N) Groundwater monitoring
 
 
Tank Tank Size Content Installed Placement Status
7 4000 Vehicular Diesel (D) 06/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(B) Internal lining
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(8) Manually sampled wells
(N) Groundwater monitoring
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   12/22/2023 12/22/2024 CRUM & FORSTER SPECIALTY INSURANCE COMPANY
INSURANCE   12/22/2022 12/22/2023 CRUM & FORSTER SPECIALTY INSURANCE COMPANY
INSURANCE   12/22/2021 12/22/2022 CRUM & FORSTER SPECIALTY INSURANCE COMPANY
INSURANCE   12/22/2020 12/22/2021 CRUM & FORSTER SPECIALTY INSURANCE COMPANY
INSURANCE   12/22/2019 12/22/2020 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   12/22/2018 12/22/2019 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   12/22/2017 12/22/2018 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   12/22/2016 12/22/2017 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   11/23/2011 11/23/2012 ZURICH-AMERICAN
INSURANCE   11/23/2010 11/23/2011 ZURICH-AMERICAN
INSURANCE   11/23/2009 11/23/2010 ZURICH-AMERICAN
INSURANCE   11/23/2009 11/23/2010 ZURICH-AMERICAN
INSURANCE   05/17/2007 05/17/2009 ACE
INSURANCE   09/21/2003 09/21/2004 AIG
INSURANCE   09/21/2002 09/21/2003 AIG
INSURANCE   09/21/2000 09/21/2002 COMMERCE & INDUSTRY
INSURANCE   09/21/1999 09/21/2000 COMMERCE & INDUSTRY
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
LTR 01/06/2006 01/09/2006 CROWELL_M 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes VIOLATION RESOLUTION FOLLOW-UP LETTER.
 
NCLI 07/22/2005 07/31/2005 CROWELL_M 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes REQUESTED: 2 MONTHLY ELECTRONIC SENSOR REPORTS, 2 MONTHLY VISUAL INSPECTIONS.
 
RRBD 07/13/2005 07/26/2005 CROWELL_M 0/0 DISCHARGE PROJECT
 
 Completion Notes HEARTLAND TESTED SENSORS AND REPLACED ALL 3 ON 9/16/04. TIME DELAY DUE TO HURRICANES. VEEDER-ROOT SYSTEM TESTED & WORKING PROPERLY
 
RRBD 07/13/2005 07/26/2005 CROWELL_M 0/0 DISCHARGE PROJECT
 
 Completion Notes HEARTLAND TESTED SENSORS AND REPLACED ALL 3 ON 9/16/04. TIME DELAY DUE TO HURRICANES. VEEDER-ROOT SYSTEM TESTED & WORKING PROPERLY
 
IRFR 07/13/2005 07/26/2005 CROWELL_M 0/0 DISCHARGE PROJECT
 
 Completion Notes DISCOVERY: 9/1/04. MONITOR: VEEDERROOT. SUBSTANCE: DIESEL. INVOLVES: REL DET EQUIPMENT. CAUSE: FAULTY PROBE/SENSOR. HEARTLAND TESTED SENSORS AND REPLACED ALL 3 ON 9/16/04. TIME DELAY DUE TO HURRICANES. VEEDER-ROOT SYSTEM TESTED & WORKING PROPERLY
 
IRFR 07/13/2005 07/26/2005 CROWELL_M 0/0 DISCHARGE PROJECT
 
 Completion Notes DISCOVERY: 8/31/04. MONITOR: VEEDERROOT. SUBSTANCE: DIESEL. INVOLVES: REL DET EQUIPMENT. CAUSE: FAULTY PROBE/SENSOR. HEARTLAND TESTED SENSORS AND REPLACED ALL 3 ON 9/16/04. TIME DELAY DUE TO HURRICANES. VEEDER-ROOT SYSTEM TESTED & WORKING PROPERLY
 
TCI 07/12/2005 07/31/2005 MINOR OUT-OF-COMPLIANCE CROWELL_M 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes NO PHOTOS TAKEN. PIPING: OPW PISCES DOUBLE WALL FIBERGLASS.
 
RRBD 03/02/2005 03/06/2005 GONZALEZ_J 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes RESOLVES VIOLATION #82, 142, & 157.
 
CALL 09/21/2004 09/22/2004 GONZALEZ_J 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes 75 DAY PHONE CALL FOR VIOLATION RESOLUTION. MR TOLENTO SAID THAT THE CONTRACTOR WAS ALREADY DONE LTT AND THE LLD BUT IS WAITING FOR PARTS TO FINISH THE WORK. ALL SHOULD BE DONE NEXT WEEK. WAS ADVISED TO MAIL OR FAX RESULTS AS SOON AS HE GETS THEM.
 
LTR 09/07/2004 09/08/2004 GONZALEZ_J 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes 60 DAY VIOLATION LETTER.
 
LTR 09/07/2004 09/08/2004 GONZALEZ_J 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes 60 DAY VIOLATIONS LETTER.
 
NCLI 07/16/2004 07/19/2004 COMPLIANCE ASSURANCE
 
TCI 07/09/2004 07/19/2004 MINOR OUT-OF-COMPLIANCE GONZALEZ_J 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes 1 PHOTO TAKEN. PIPING: OPW PISCES DOUBLE WALL FIBERGLASS.
 
RRBD 06/30/2003 07/16/2003 HUGHES_J 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes RESOLVES VIOLATION #157 & 142.
 
CWOE 06/30/2003 07/16/2003 HUGHES_J 0/0 COMPLIANCE ASSURANCE
 
NCLI 06/02/2003 06/05/2003 HUGHES_J 0/0 COMPLIANCE ASSURANCE
 
TCI 05/28/2003 06/05/2003 MINOR OUT-OF-COMPLIANCE HUGHES_J 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes NO PHOTOS TAKEN. RESOLVES VIOLATION #155.
 
NCLI 12/06/2001 12/14/2001 SACLARIDES 0/0 COMPLIANCE ASSURANCE
 
TCI 12/06/2001 12/13/2001 MINOR OUT-OF-COMPLIANCE SACLARIDES 0/3 COMPLIANCE ASSURANCE
 
CALL 11/20/2001 12/13/2001 SACLARIDES 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes SCHEDULE COMPLIANCE INSPECTION
 
TCI 03/12/2001 03/16/2001 IN-COMPLIANCE SACLARIDES_M 0/3 COMPLIANCE ASSURANCE
 
RRBD 09/01/2000 09/26/2000 SACLARIDES_M 0/0 COMPLIANCE ASSURANCE
 
CWOE 09/01/2000 09/26/2000 SACLARIDES_M 0/0 COMPLIANCE ASSURANCE
 
RRBD 07/12/2000 08/01/2000 RONEY_B 0/0 COMPLIANCE ASSURANCE
 
NCLI 06/13/2000 06/14/2000 MURRAY_K 0/0 COMPLIANCE ASSURANCE
 
TCI 06/12/2000 06/14/2000 SIGNIFICANT OUT-OF-COMPLIANCE MURRAY_K 0/3 COMPLIANCE ASSURANCE
 
TXI 01/11/1999 02/25/1999 IN-COMPLIANCE CALLAHAM_C 0/7 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Electronic Communication 12/20/2024 Satisfied GLENN_LE_1 Compliance Assistance
 
Electronic Communication 03/08/2024 Satisfied GLENN_LE_1 Routine Compliance
 
Electronic Communication 03/08/2024 Satisfied GLENN_LE_1 Compliance Assistance
 
Letter 03/08/2024 Satisfied GLENN_LE_1 Compliance Assistance
 
Electronic Communication 03/08/2024 Satisfied GLENN_LE_1 Routine Compliance
 
Site Inspection 02/28/2024 Major Out of Compliance GLENN_LE_1 0/3 Routine Compliance
 
Electronic Communication 02/08/2021 Satisfied GLENN_LE_1 Routine Compliance
 
Electronic Communication 01/27/2021 Satisfied GLENN_LE_1 Routine Compliance
 
Electronic Communication 01/27/2021 Satisfied GLENN_LE_1 Routine Compliance
 
Electronic Communication 01/27/2021 Satisfied GLENN_LE_1 Routine Compliance
 
Letter 01/27/2021 Satisfied GLENN_LE_1 Routine Compliance
 
Electronic Communication 12/23/2020 Satisfied GLENN_LE_1 Compliance Assistance
 
Electronic Communication 12/23/2020 Satisfied GLENN_LE_1 Compliance Assistance
 
Site Inspection 12/23/2020 In Compliance GLENN_LE_1 0/3 Routine Compliance
 
Letter 02/27/2019 Satisfied GLENN_LE_1 Compliance Assistance
 
Site Inspection 02/27/2019 Major Out of Compliance GLENN_LE_1 0/3 Routine Compliance
 
Electronic Communication 02/27/2019 Satisfied GLENN_LE_1 Routine Compliance
 
Electronic Communication 02/27/2019 Satisfied GLENN_LE_1 Routine Compliance
 
Electronic Communication 02/27/2019 Satisfied GLENN_LE_1 Compliance Assistance
 
Enforcement Tracking 07/05/2018 Closed Without Enforcement BROWNLEE_S Enforcement
 
Letter 07/05/2018 Satisfied BROWNLEE_S Routine Compliance
 
Electronic Communication 07/03/2018 Satisfied GLENN_LE_1 Compliance Assistance
 
Letter 07/03/2018 Satisfied GLENN_LE_1 Compliance Assistance
 
Site Inspection 06/30/2018 In Compliance GLENN_LE_1 0/3 Compliance Assistance
 
Electronic Communication 06/08/2018 Satisfied GLENN_LE_1 Compliance Assistance
 
Electronic Communication 05/25/2018 Satisfied BROWNLEE_S Enforcement
 
Electronic Communication 05/17/2018 Satisfied KENNEDY_S Enforcement
 
Letter 05/07/2018 Satisfied KENNEDY_S Enforcement
 
Electronic Communication 12/04/2017 Satisfied KENNEDY_S Enforcement
 
Electronic Communication 10/01/2017 Satisfied KENNEDY_S Enforcement
 
Electronic Communication 10/01/2017 Satisfied KENNEDY_S Enforcement
 
Electronic Communication 07/05/2017 Satisfied KENNEDY_S Enforcement
 
Electronic Communication 05/26/2017 Satisfied KENNEDY_S Enforcement
 
Electronic Communication 05/19/2017 Satisfied KENNEDY_S Enforcement
 
Meeting 05/01/2017 Satisfied GLENN_LE_1 Non-Compliance
 
Electronic Communication 03/01/2017 Satisfied GLENN_LE_1 Non-Compliance
 
Letter 10/25/2016 Satisfied GLENN_LE_1 Non-Compliance
 
Electronic Communication 10/25/2016 Satisfied GLENN_LE_1 Non-Compliance
 
Issue Document 10/25/2016 Satisfied GLENN_LE_1 Non-Compliance
 
Site Inspection 10/24/2016 Major Out of Compliance GLENN_LE_1 0/3 Routine Compliance
 
Letter 08/21/2014 Satisfied DERY_WC_1 Non-Compliance
 
Site Inspection 07/01/2014 Major Out of Compliance DERY_WC_1 0/3 Routine Compliance
 
Phone Conversation 11/04/2013 Satisfied MEETZE_A Enforcement
 
Letter 09/30/2013 Satisfied DERY_WC_1 Non-Compliance
 
Electronic Communication 09/30/2013 Satisfied MEETZE_A Enforcement
 
Site Inspection 09/30/2013 Major Out of Compliance DERY_WC_1 0/3 Closure
 
Letter 09/30/2013 Satisfied DERY_WC_1 Non-Compliance
 
Site Inspection 09/30/2013 Major Out of Compliance DERY_WC_1 0/3 Installation
 
Electronic Communication 09/25/2013 Satisfied MEETZE_A Enforcement
 
Issue Document 09/18/2013 Satisfied MEETZE_A Enforcement
 
Record Document 09/18/2013 Satisfied MEETZE_A Enforcement
 
Phone Conversation 07/16/2013 Satisfied MEETZE_A Enforcement
 
Electronic Communication 05/02/2013 Satisfied DERY_WC_1 Non-Compliance
 
Electronic Communication 04/11/2013 Satisfied WINN_JP_1 Non-Compliance
 
Letter 03/20/2013 Satisfied WINN_JP_1 Non-Compliance
 
Site Inspection 03/20/2013 Major Out of Compliance WINN_JP_1 0/3 Routine Compliance
 
Phone Conversation 01/09/2013 Satisfied DERY_WC_1 Installation
 
Phone Conversation 01/09/2013 Satisfied DERY_WC_1 Installation
 
Electronic Communication 01/07/2013 Satisfied MEETZE_A Enforcement
 
Letter 01/02/2013 Satisfied MEETZE_A Non-Compliance
 
Electronic Communication 01/02/2013 Satisfied MEETZE_A Enforcement
 
Electronic Communication 12/21/2012 Satisfied DERY_WC_1 Non-Compliance
 
Electronic Communication 12/20/2012 Satisfied MEETZE_A Enforcement
 
Site Inspection 12/17/2012 Major Out of Compliance MEETZE_A 0/3 Enforcement
 
Electronic Communication 11/07/2012 Satisfied MEETZE_A Enforcement
 
Phone Conversation 11/07/2012 Satisfied MEETZE_A Enforcement
 
Record Document 10/15/2012 Satisfied MEETZE_A Enforcement
 
Electronic Communication 10/04/2012 Satisfied MEETZE_A Enforcement
 
Phone Conversation 10/04/2012 Satisfied MEETZE_A Enforcement
 
Phone Conversation 09/04/2012 Satisfied MEETZE_A Enforcement
 
Electronic Communication 08/27/2012 Satisfied MEETZE_A Enforcement
 
Electronic Communication 08/21/2012 Satisfied MEETZE_A Enforcement
 
Phone Conversation 08/20/2012 Satisfied MEETZE_A Enforcement
 
Issue Document 08/08/2012 Satisfied MEETZE_A Enforcement
 
Enforcement Referral 08/01/2012 Accepted MEETZE_A Enforcement
 
Letter 07/24/2012 Satisfied DERY_WC_1 Non-Compliance
 
Site Inspection 07/24/2012 Major Out of Compliance DERY_WC_1 0/3 Non-Compliance
 
Phone Conversation 07/02/2012 Satisfied DERY_WC_1 Non-Compliance
 
Electronic Communication 07/02/2012 Satisfied DERY_WC_1 Non-Compliance
 
Record Document 07/02/2012 Satisfied DERY_WC_1 Non-Compliance
 
Document Management 07/02/2012 Complete DERY_WC_1 Incident
 
Phone Conversation 07/02/2012 Satisfied DERY_WC_1 Non-Compliance
 
Phone Conversation 07/02/2012 Satisfied DERY_WC_1 Non-Compliance
 
Phone Conversation 07/02/2012 Satisfied DERY_WC_1 Non-Compliance
 
Phone Conversation 07/02/2012 Satisfied DERY_WC_1 Non-Compliance
 
Phone Conversation 07/02/2012 Satisfied DERY_WC_1 Non-Compliance
 
Letter 06/28/2012 Satisfied DERY_WC_1 Non-Compliance
 
Letter 05/04/2012 Satisfied DERY_WC_1 Non-Compliance
 
Phone Conversation 04/30/2012 Satisfied DERY_WC_1 Non-Compliance
 
Phone Conversation 04/30/2012 Satisfied DERY_WC_1 Non-Compliance
 
Letter 04/03/2012 Satisfied DERY_WC_1 Non-Compliance
 
Site Inspection 04/03/2012 Major Out of Compliance DERY_WC_1 0/3 Routine Compliance
 
Letter 06/22/2011 Satisfied WINN_JP_1 Non-Compliance
 
Phone Conversation 06/22/2011 Satisfied WINN_JP_1 Non-Compliance
 
Letter 05/16/2011 Satisfied WINN_JP_1 Non-Compliance
 
Site Inspection 05/16/2011 Minor Out of Compliance WINN_JP_1 0/3 Routine Compliance
 
Enforcement Tracking 04/21/2011 Closed With Enforcement MEETZE_A Enforcement
 
Issue Document 05/26/2010 Satisfied MEETZE_A Enforcement
 
Phone Conversation 05/25/2010 Satisfied MEETZE_A Enforcement
 
Site Inspection 05/18/2010 In Compliance DERY_WC_1 0/3 Routine Compliance
 
Site Inspection 02/26/2010 Minor Out of Compliance DERY_WC_1 0/3 Non-Compliance
 
Letter 02/26/2010 Satisfied DERY_WC_1 Non-Compliance
 
Phone Conversation 02/04/2010 Satisfied DERY_WC_1 Non-Compliance
 
Record Document 12/29/2009 Satisfied MEETZE_A Enforcement
 
Record Document 11/25/2009 Satisfied MEETZE_A Enforcement
 
Meeting 11/10/2009 Satisfied MEETZE_A Enforcement
 
Issue Document 10/21/2009 Satisfied MEETZE_A Enforcement
 
Enforcement Referral 09/01/2009 Accepted MEETZE_A Enforcement
 
Record Document 06/11/2009 Satisfied DERY_WC_1 Non-Compliance
 
Site Inspection 05/22/2009 Major Out of Compliance DERY_WC_1 0/3 Routine Compliance
 
Letter 05/22/2009 Satisfied DERY_WC_1 Non-Compliance
 
Phone Conversation 05/13/2009 Satisfied DERY_WC_1 Routine Compliance
 
Issue Document 12/17/2008 Satisfied CASSELS_CR_1 Non-Compliance
 
Record Document 10/03/2008 Satisfied CASSELS_CR_1 Non-Compliance
 
Phone Conversation 09/12/2008 Satisfied CASSELS_CR_1 Non-Compliance
 
Issue Document 08/18/2008 Satisfied CASSELS_CR_1 Non-Compliance
 
Record Document 07/01/2008 Satisfied CASSELS_CR_1 Non-Compliance
 
Record Document 07/01/2008 Satisfied CASSELS_CR_1 Non-Compliance
 
Letter 06/12/2008 Satisfied CASSELS_CR_1 Non-Compliance
 
Site Inspection 06/12/2008 Minor Out of Compliance CASSELS_CR_1 0/3 Routine Compliance
 
Phone Conversation 05/05/2008 Satisfied CASSELS_CR_1 Routine Compliance
 
Record Document 04/05/2007 Satisfied DERY_WC_1 Non-Compliance
 
Letter 03/20/2007 Satisfied DERY_WC_1 Non-Compliance
 
Record Document 03/19/2007 Satisfied DERY_WC_1 Non-Compliance
 
Record Document 03/15/2007 Satisfied DERY_WC_1 Non-Compliance
 
Letter 03/12/2007 Satisfied DERY_WC_1 Non-Compliance
 
Record Document 03/12/2007 Satisfied DERY_WC_1 Non-Compliance
 
Site Inspection 03/07/2007 Minor Out of Compliance DERY_WC_1 0/3 Installation
 
Letter 03/07/2007 Satisfied DERY_WC_1 Non-Compliance
 
Letter 03/06/2007 Satisfied DERY_WC_1 Non-Compliance
 
Site Inspection 03/06/2007 Minor Out of Compliance DERY_WC_1 0/3 Closure
 
Emergency Preparedness Information 02/07/2007 Satisfied CASSELS_CR_1 Routine Compliance
 
Issue Document 01/12/2007 Satisfied DERY_WC_1 Routine Compliance
 
Phone Conversation 01/12/2007 Satisfied DERY_WC_1 Non-Compliance
 
Phone Conversation 12/20/2006 Satisfied DERY_WC_1 Routine Compliance
 
Site Inspection 12/20/2006 Minor Out of Compliance DERY_WC_1 0/3 Routine Compliance
 
Emergency Preparedness Information 09/27/2006 Satisfied CROWELL_MP Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
02/28/2024 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Corrosion must be treated and the Department notified.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
08/09/1991   COMPLETED 55 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE
 
03/15/1991   COMPLETED 55 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE
 
06/13/1990   COMPLETED 55