Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 01/22/2025 Last Data Refresh: 01/21/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Polk | Status | OPEN | ||||||||
ID | 8624327 | Latitude | 27° 53' 48.9624 | ||||||||
Name |
SUNOCO-BARTOW 1900 W MAIN ST |
Longitude | 81° 51' 32.7717 | ||||||||
BARTOW, FL 33830-9321 | LL Method | DPHO | |||||||||
Contact | RABEYA BHUIYA | LL Status | REVIEWED | ||||||||
Phone | (352) 460-3648 | Status Date | 02/12/2024 | ||||||||
Account Owner Information | |||||||||||
Name | A & K FOOD MART INC 1900 W MAIN ST BARTOW, FL 33830 |
Effective Date | 10/28/2020 | ||||||||
Contact | RABEYA BHUIYA | ||||||||||
Phone | (352) 460-3648 | ||||||||||
RABEYABHUIYA@GMAIL.COM | |||||||||||
Placard # / Date | 703197 - 10/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | A & K FOOD MART INC 1900 W MAIN ST BARTOW, FL 33830 |
Effective Date | 10/28/2020 | ||||||||
Contact | RABEYA BHUIYA | ||||||||||
Phone | (352) 460-3648 | ||||||||||
RABEYABHUIYA@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 05/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Unleaded Gas (B) | 05/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 12000 | Unleaded Gas (B) | 05/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 10000 | Unleaded Gas (B) | 08/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 10000 | Unleaded Gas (B) | 08/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 10000 | Unleaded Gas (B) | 08/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 2000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 09/24/2024 | 09/24/2025 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/24/2023 | 09/24/2024 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/24/2022 | 09/24/2023 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/24/2021 | 09/24/2022 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2020 | 09/24/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2019 | 09/24/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2018 | 09/24/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2017 | 09/24/2018 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2015 | 12/31/2016 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2011 | 12/31/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2010 | 12/31/2011 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2009 | 12/31/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 07/08/2001 | 12/31/2002 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/14/2000 | 07/14/2001 | GREAT AMERICAN | ||||||||
INSURANCE | 06/01/1989 | 06/01/1993 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/07/2005 | 11/11/2005 | IN-COMPLIANCE | GONZALEZ_J | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: SINGLE WALL RIGID FIBERGLASS. | |||||||||||
CWOE | 03/23/2005 | 03/24/2005 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 03/23/2005 | 03/24/2005 | CASSELS_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED CFR & TTT. RESOLVES VIOLATION #1004 & 1073. | |||||||||||
NCLI | 02/03/2005 | 02/09/2005 | CASSELS_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REQUESTED: COMPLETED CFR AND TTT RESULTS. | |||||||||||
TCI | 01/14/2005 | 02/09/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | CASSELS_C | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: UNDERGROUND SINGLE-WALL PRESSURIZED RIGID FIBERGLASS. CURRENT ACORD BINDER FOR FR. | |||||||||||
RRBD | 05/03/2004 | 05/27/2004 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 05/03/2004 | 05/27/2004 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED PROOF OF INSURANCE, AND VISUAL INSPECTIONS. RESOLVES VIOLATION #3, 170, 171. | |||||||||||
NCLI | 01/08/2004 | 01/14/2004 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/08/2004 | 01/14/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | CROWELL_M | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: UNDERGROUND SINGLE-WALL PRESSURIZED RIGID FIBERGLASS. | |||||||||||
RRBD | 01/21/2003 | 01/14/2004 | NEWBERG_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #8. | |||||||||||
RRBD | 01/13/2003 | 01/14/2004 | NEWBERG_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #92. | |||||||||||
NCLI | 01/08/2003 | 01/14/2004 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REQUESTED: CURRENT FINANCIAL RESPONSIBILITY, AND MONTHLY VISUAL INSPECTION FOR NOVEMBER AND DECEMBER. | |||||||||||
NCLI | 01/02/2003 | 01/08/2003 | NEWBERG_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/18/2002 | 01/08/2003 | MINOR OUT-OF-COMPLIANCE | NEWBERG_D | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/19/2001 | 12/05/2001 | IN-COMPLIANCE | HUGHES | 0/3 | COMPLIANCE ASSURANCE | |||||
CALL | 11/08/2001 | 12/05/2001 | HUGHES | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LEFT MESSAGE SCHEDULING INSPECTION FOR NOV. 19. SAID HE NEED NOT BE PRESENT BUT I NEEDED TO SEE INSURANCE, RDRL AND RELEASE DETECTION RECORDS. | |||||||||||
TCI | 11/17/2000 | 12/01/2000 | IN-COMPLIANCE | HUGHES | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/22/1999 | 12/29/1999 | MEDER_R | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 10/26/1999 | 11/03/1999 | MEDER_R | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/19/1999 | 11/01/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | MEDER_R | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 05/07/1999 | 10/15/1999 | MEDER_R | 0/0 | COMPLIANCE ASSURANCE | ||||||
DCCR | 03/22/1999 | 10/08/1999 | COOK_J | 0/0 | DISCHARGE PROJECT | ||||||
DRFR | 03/22/1999 | 04/27/1999 | HONEY_K | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes LAB ANALYSES | |||||||||||
IRFR | 03/18/1999 | 04/27/1999 | JENKINS_N | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes HIGH OVAS DURING CLOSURE | |||||||||||
NCLI | 03/18/1999 | 03/19/1999 | JENKINS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TXI | 03/12/1999 | 03/18/1999 | MINOR OUT-OF-COMPLIANCE | JENKINS | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 03/12/1999 | 03/18/1999 | IN-COMPLIANCE | JENKINS | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 12/11/2024 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/11/2024 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Letter | 12/11/2024 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 10/31/2024 | Major Out of Compliance | GLENN_LE_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 03/02/2022 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 03/02/2022 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 02/22/2022 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 02/22/2022 | Minor Out of Compliance | GLENN_LE_1 | 0/3 | Routine Compliance | ||||||
Letter | 02/22/2022 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 02/22/2022 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 02/22/2022 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 02/22/2022 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 02/22/2022 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Phone Conversation | 02/27/2020 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 02/25/2020 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 02/25/2020 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Letter | 02/25/2020 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Site Inspection | 02/25/2020 | Major Out of Compliance | JARRETT_SE_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 02/25/2020 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 06/15/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 06/15/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 06/15/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Letter | 06/15/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Phone Conversation | 02/09/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 02/09/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 02/09/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Letter | 02/07/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 02/07/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Site Inspection | 02/07/2018 | Minor Out of Compliance | JARRETT_SE_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 02/06/2018 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 01/29/2018 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Issue Document | 01/22/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 01/17/2018 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 01/17/2018 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Phone Conversation | 01/15/2018 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 01/14/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 01/14/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 01/14/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Site Inspection | 01/14/2018 | In Compliance | JARRETT_SE_1 | 0/3 | Compliance Assistance | ||||||
Letter | 01/14/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 01/13/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/30/2017 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/30/2017 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 05/20/2016 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||||||
Electronic Communication | 05/20/2016 | Satisfied | WILLIAMSON_KE_1 | Routine Compliance | |||||||
Site Inspection | 05/20/2016 | Minor Out of Compliance | WILLIAMSON_KE_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 03/22/2016 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||||||
Record Document | 03/17/2014 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 11/22/2013 | Major Out of Compliance | WINN_JP_1 | 0/3 | Routine Compliance | ||||||
Letter | 11/22/2013 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 07/27/2012 | Minor Out of Compliance | WINN_JP_1 | 0/3 | Routine Compliance | ||||||
Letter | 07/27/2012 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 03/03/2011 | In Compliance | SLAPPEY_WR_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/06/2009 | In Compliance | DERY_WC_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 09/03/2009 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Meeting | 05/12/2009 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Letter | 03/10/2009 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Site Inspection | 03/10/2009 | Minor Out of Compliance | NEWBERG_DR_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 02/25/2009 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Record Document | 05/29/2008 | Satisfied | BELL_JM_1 | Non-Compliance | |||||||
Letter | 03/21/2008 | Satisfied | BELL_JM_1 | Closure | |||||||
Issue Document | 03/21/2008 | Satisfied | BELL_JM_1 | Closure | |||||||
Record Document | 03/21/2008 | Satisfied | BELL_JM_1 | Closure | |||||||
TCAR | 03/05/2008 | Satisfied | BELL_JM_1 | Closure | |||||||
Record Document | 02/14/2008 | Satisfied | BELL_JM_1 | Non-Compliance | |||||||
Site Inspection | 02/06/2008 | In Compliance | BELL_JM_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 01/07/2008 | Satisfied | BELL_JM_1 | Routine Compliance | |||||||
Site Inspection | 08/21/2007 | In Compliance | CASSELS_CR_1 | 0/3 | Installation | ||||||
Record Document | 06/07/2007 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 06/07/2007 | In Compliance | CASSELS_CR_1 | 0/3 | Closure | ||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | DIXON_R | Routine Compliance | |||||||
Site Inspection | 12/13/2006 | Minor Out of Compliance | SLAPPEY_WR_1 | 0/3 | Routine Compliance | ||||||
Letter | 12/13/2006 | Satisfied | SLAPPEY_WR_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/28/2006 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/31/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Liners must be cleaned and the Department notified. | |||||||
10/31/2024 | 6030 | SNC-B | 4.2 Any component(s) of storage tank system not installed according to reference standards. | PEI must be complied with and either remove the coaxial drop tubes and install straight drop tubes for use with dual point vapor recovery, or remove the ball check valves, and the Department notified. | |||||||
10/31/2024 | 6038 | SNC-B | 4.9 Shear valve not installed properly. | Anchor bolt must be replaced and the Department notified. | |||||||
10/31/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Testing records must be provided to the Department or testing performed immediately with the results provided to the Department. | |||||||
10/31/2024 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Complete a Storage Tank Facility Registration Form and submit to the Department or you can use FDEPs online portal (ESSA) to make the corrections https://floridadep.gov/waste/permitting-compliance-assistance/content/storagetank-facility-registration. | |||||||
03/02/2022 | 6030 | SNC-B | 4.2 Any component(s) of storage tank system not installed according to reference standards. | Therefore, PEI must be complied with and either the flapper valves or ball check valves removed with the remaining overfill device achieving a passing test, the facility registration updated and the Department notified. | |||||||
02/22/2022 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Testing records must be provided to the Department or testing performed immediately with the results provided to the Department. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
03/22/1999 | COMPLETED | ||||||||||
02/03/1991 | COMPLETED | ||||||||||