Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 03/20/2025 Last Data Refresh: 03/19/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Polk | Status | OPEN | ||||||||
ID | 8624352 | Latitude | 28° 10' 40.942 | ||||||||
Name |
MARATHON-POLK CITY #185 6000 STATE ROAD 557 |
Longitude | 81° 44' 31.9844 | ||||||||
LAKE ALFRED, FL 33850-3093 | LL Method | DPHO | |||||||||
Contact | RICK HERWEH | LL Status | REVIEWED | ||||||||
Phone | (813) 681-4279 | Status Date | 01/31/2024 | ||||||||
Account Owner Information | |||||||||||
Name | AUTOMATED PETROLEUM & ENERGY CO INC (APEC) PO BOX 1110 Brandon, FL 33509-1110 |
Effective Date | 09/26/1996 | ||||||||
Contact | BILL MCKNIGHT | RICK HERWEH | ||||||||||
Phone | (813) 681-4279 | ||||||||||
RICK@APECGAS.COM | |||||||||||
Placard # / Date | 692379 - 06/20/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | AUTOMATED PETROLEUM & ENERGY CO INC (APEC) PO BOX 1110 Brandon, FL 33509-1110 |
Effective Date | 04/17/2015 | ||||||||
Contact | BILL MCKNIGHT | RICK HERWEH | ||||||||||
Phone | (813) 681-4279 | ||||||||||
RICK@APECGAS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Vehicular Diesel (D) | 04/01/2003 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Unleaded Gas (B) | 04/01/2003 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Unleaded Gas (B) | 04/01/2003 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 10000 | Unleaded Gas (B) | 04/01/2003 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Unleaded Gas (B) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Unleaded Gas (B) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 550 | Fuel Oil - Onsite Heat (M) | 04/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Vehicular Diesel (D) | 10/01/1997 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | LIBERTY SURPLUS INSURANCE CORP | ||||||||||
LETTER OF CREDIT | 01/31/2024 | 01/31/2025 | |||||||||
LETTER OF CREDIT | 01/31/2023 | 01/31/2024 | |||||||||
LETTER OF CREDIT | 01/31/2022 | 01/31/2023 | |||||||||
LETTER OF CREDIT | 05/31/2020 | 01/31/2022 | |||||||||
LETTER OF CREDIT | 05/31/2019 | 05/31/2020 | |||||||||
LETTER OF CREDIT | 05/31/2018 | 05/31/2019 | |||||||||
INSURANCE | 12/31/2017 | 12/31/2018 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2016 | 12/31/2017 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2015 | 12/31/2016 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2013 | 12/31/2014 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2012 | 12/31/2013 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2011 | 12/31/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2010 | 12/31/2011 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2009 | 12/31/2010 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2007 | 12/31/2008 | ZURICH-AMERICAN | ||||||||
INSURANCE | 12/31/2001 | 12/31/2003 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/18/1989 | 04/30/1995 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 02/27/2006 | 03/15/2006 | GONZALEZ_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes MONTHLY VISUAL INSPECTION REPORTS. RESOLVES: 1063. | |||||||||||
LTR | 01/09/2006 | 01/10/2006 | GONZALEZ_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FAX WITH ATTACHMENT STATING WHAT NEEDS TO BE DONE TO RESOLVE THE VIOLATIONS. | |||||||||||
NCLI | 09/29/2005 | 10/01/2005 | GONZALEZ_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/23/2005 | 10/01/2005 | MINOR OUT-OF-COMPLIANCE | GONZALEZ_J | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes 1 PHOTO TAKEN. PIPING: UG DW ATP FLEX (EQ-167), INSIDE A GREEN ENVIRON GEOFLEX CHASE (EQ-174). DIESEL: DW RIGID FIBERGLASS SMITH REDTHREAD (EQ-252). | |||||||||||
RRBD | 08/03/2004 | 08/03/2004 | CASSELS_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes THIS LETTER SERVES AS A SATISFACTORY EXPLANATION & DOCUMENTATION OF THE ACTIONS TAKEN WITHIN 24 HRS TO INVESTIGATE AN INCIDENT, THEREFORE AN INCIDENT NOTIFICATION FORM IS NOT REQUIRED. RESOLVES VIOLATION #9. | |||||||||||
NCLI | 07/27/2004 | 08/03/2004 | CASSELS_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REQUESTED COMPLETED INCIDENT FORM. | |||||||||||
TCI | 07/15/2004 | 08/03/2004 | MINOR OUT-OF-COMPLIANCE | CASSELS_C | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING 2004 INSTALL: DIESEL: SMITH FIBERGLASS RED THREAD D/W RIGID AND GAS: APT D/W FLEX (IN CHASE). | |||||||||||
FR | 06/28/2004 | 08/03/2004 | JENKINS_N | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #30. | |||||||||||
NCLI | 01/27/2004 | 01/27/2004 | JENKINS_N | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RQ NUMBER FOR TIGHTNESS TESTER OR HAVE ANOTHER LINE TIGHTNESS TEST PERFORMED BY A REGISTERED TESTER. | |||||||||||
TIN | 01/20/2004 | 01/27/2004 | MINOR OUT-OF-COMPLIANCE | JENKINS_N | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes 1 PHOTO TAKEN. FINAL INSPECTION. PIPING: DIESEL IS SMITH FG RED THREAD D/W RIGID. GAS IS APT D/W FLEX (IN CHASE). | |||||||||||
SV | 01/16/2004 | 01/27/2004 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes 15 PHOTOS TAKEN. INSTALL | |||||||||||
CFFE | 01/05/2004 | 01/05/2004 | REEDER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
EPI | 10/28/2003 | 10/29/2003 | REEDER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
SV | 06/10/2003 | 06/16/2003 | CALLAHAM_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes HYDRO SUMPS & LINERS/SOAP TEST. 2 JOINTS OF SECONDARY HAND PIPING (SMITH) | |||||||||||
SV | 06/09/2003 | 06/16/2003 | CALLAHAM_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes 3 PHOTOS TAKEN. PRIMARY AND SECONDARY LINE INSPECTION. HYDRO | |||||||||||
TXI | 05/06/2003 | 05/08/2003 | IN-COMPLIANCE | CALLAHAM_C | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes 6 PHOTOS TAKEN | |||||||||||
SV | 05/05/2003 | 05/08/2003 | CALLAHAM_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CHECK VACUUM READING WHILE TANKS ARE IN EXCAVATION; RAY GINTHER OF HYTECH PETROL IN ATTENDANCE | |||||||||||
SV | 05/02/2003 | 05/08/2003 | CALLAHAM_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSPECTION OF TANKS BEFORE PLACEMENT INTO EXCAVATION; RAY GINTHER OF HYTECH PETROL IN ATTENDANCE | |||||||||||
CRDE | 04/10/2003 | 07/22/2003 | JENKINS_N | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 04/08/2003 | 04/09/2003 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/20/2003 | 04/09/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | CROWELL_M | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes 2 PHOTOS TAKEN | |||||||||||
RRBD | 08/27/2002 | 10/28/2002 | PEGUES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/27/2002 | 03/08/2002 | MINOR OUT-OF-COMPLIANCE | HAUSCHILD_T | 0/4 | COMPLIANCE ASSURANCE | |||||
CALL | 02/25/2002 | 03/08/2002 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PETER ELGERS. LEFT MESSAGE TO CONFIRM HE HAD RECEIVED MY FAX. ALSO WANTED TO KNOW IF HE WAS ABLE TO COMPILE THE INFO I NEEDED. ASKED HIM TO GIVE ME A CALL. | |||||||||||
CALL | 02/25/2002 | 03/08/2002 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PETER ELGERS. CALLED AND LEFT A MESSAGE THAT HE WOULD OVERNIGHT THE PAPERWORK. | |||||||||||
CALL | 02/13/2002 | 03/08/2002 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PETER ELGERS. HE ASKED ME TO MAKE UP A LIST OF THE REQUIRED INFORMATION AND FX IT TO HIM. HE WOULD THEN SEND NE THE INFO. TOLD HIM I WOULD BEGIN INSPECTING ON WILL. HE AGREED. | |||||||||||
CALL | 02/12/2002 | 03/08/2002 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PETER ELGERS. LEFT VOICE MAIL ASKING HIM TO CALL ME BACK. MR ELGERS RETURNED CAL AND LEFT MESSAGE SAYING HE WAS ANXIOUS TO SET UP INSPECTION AND ASKED ME TO GIVE A CALL. | |||||||||||
CALL | 02/11/2002 | 03/08/2002 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PETER ELGERS. CALLED MR ELGERS AND LEFT A VOICE MAIL MESSAGE TO CALL ME TO SET UP INSPECTION AND RECORDS REVIEW. | |||||||||||
CALL | 02/04/2002 | 03/08/2002 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PETER ELGERS. CALLED TO SCHEDULE INSPECTION. HE IS ON VACATION. TOLD HIS SECRETARY I WOULD CALL BACK. | |||||||||||
TCI | 11/29/2000 | 12/05/2000 | MINOR OUT-OF-COMPLIANCE | MURRAY | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/16/2000 | 12/05/2000 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 05/10/2000 | 05/17/2000 | MURRAY_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/08/2000 | 05/17/2000 | MINOR OUT-OF-COMPLIANCE | MURRAY_K | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 04/26/1999 | 04/30/1999 | CASTOR_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 03/30/1999 | 04/14/1999 | CASTOR_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/26/1999 | 04/13/1999 | MINOR OUT-OF-COMPLIANCE | CASTOR_M | 0/4 | COMPLIANCE ASSURANCE | |||||
UTII | 10/17/1997 | 11/05/1997 | MINOR OUT-OF-COMPLIANCE | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 07/27/2024 | Major Out of Compliance | GLENN_LE_1 | 0/4 | Routine Compliance | ||||||
Incident | 07/26/2024 | Has not led to Discharge | GLENN_LE_1 | Incident | |||||||
Document Management | 07/26/2024 | Satisfied | GLENN_LE_1 | Incident | |||||||
Electronic Communication | 07/26/2024 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 07/13/2022 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 07/13/2022 | Major Out of Compliance | GLENN_LE_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 02/18/2020 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Site Inspection | 02/12/2020 | Major Out of Compliance | JARRETT_SE_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 02/12/2020 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Letter | 02/12/2020 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 02/11/2020 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 02/11/2020 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Phone Conversation | 02/11/2020 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 02/11/2020 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 02/11/2020 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Enforcement Tracking | 01/26/2018 | Closed Without Enforcement | PEDIGO_L | Enforcement | |||||||
Letter | 01/14/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 01/14/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Incident | 01/14/2018 | Has not led to Discharge | JARRETT_SE_1 | Incident | |||||||
Document Management | 01/14/2018 | Satisfied | JARRETT_SE_1 | Incident | |||||||
Site Inspection | 01/14/2018 | In Compliance | JARRETT_SE_1 | 0/4 | Compliance Assistance | ||||||
Electronic Communication | 01/14/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 01/14/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Enforcement Referral | 01/05/2018 | Accepted | GLENN_LE_1 | Enforcement | |||||||
Electronic Communication | 12/30/2017 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/21/2017 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/21/2017 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Electronic Communication | 12/21/2017 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Electronic Communication | 12/21/2017 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 06/19/2017 | Satisfied | CASSELS_CR_2 | Routine Compliance | |||||||
Site Inspection | 05/24/2017 | Major Out of Compliance | CASSELS_CR_2 | 0/4 | Routine Compliance | ||||||
Letter | 05/24/2017 | Satisfied | CASSELS_CR_2 | Non-Compliance | |||||||
Electronic Communication | 05/24/2017 | Satisfied | CASSELS_CR_2 | Routine Compliance | |||||||
Electronic Communication | 05/24/2017 | Satisfied | CASSELS_CR_2 | Non-Compliance | |||||||
Site Inspection | 08/21/2014 | Minor Out of Compliance | DERY_WC_1 | 0/0 | Complaint | ||||||
Letter | 06/27/2014 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Site Inspection | 06/27/2014 | Minor Out of Compliance | NEWBERG_DR_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 06/27/2014 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Site Inspection | 03/19/2013 | Minor Out of Compliance | WINN_JP_1 | 0/4 | Routine Compliance | ||||||
Letter | 03/19/2013 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Letter | 08/13/2012 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Phone Conversation | 06/25/2012 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Letter | 05/18/2012 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 05/18/2012 | Minor Out of Compliance | WINN_JP_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 02/18/2011 | In Compliance | SLAPPEY_WR_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 08/02/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Meeting | 07/29/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Electronic Communication | 07/23/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 07/22/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Record Document | 07/08/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 07/02/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 05/11/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 05/11/2010 | Major Out of Compliance | DERY_WC_1 | 0/4 | Routine Compliance | ||||||
Phone Conversation | 03/26/2010 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Site Inspection | 08/15/2008 | In Compliance | NEWBERG_DR_1 | 0/4 | Routine Compliance | ||||||
Phone Conversation | 08/15/2008 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Record Document | 07/21/2008 | Satisfied | SLAPPEY_WR_1 | Non-Compliance | |||||||
Record Document | 07/02/2008 | Satisfied | SLAPPEY_WR_1 | Non-Compliance | |||||||
Letter | 04/22/2008 | Satisfied | SLAPPEY_WR_1 | Non-Compliance | |||||||
Site Inspection | 04/22/2008 | Minor Out of Compliance | SLAPPEY_WR_1 | 0/4 | Routine Compliance | ||||||
Phone Conversation | 01/07/2008 | Satisfied | BELL_JM_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Site Inspection | 11/30/2006 | In Compliance | SLAPPEY_WR_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/24/2006 | Satisfied | SLAPPEY_WR_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
07/27/2024 | 6030 | SNC-B | 4.2 Any component(s) of storage tank system not installed according to reference standards. | An investigation must be performed to determine if ball check valves are installed if so, PEI must be complied with and either the overfill prevention valves or ball check valves removed with the remaining overfill device achieving a passing operability test and the Department notified. | |||||||
07/27/2024 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | The following documentation must be provided to the Department for the replacement: - Post replacement testing records: - Liner hydro, Primary and secondary piping, Shear valve operability (if new valves installed) - Make and model of new liner - Closure assessment report - Underground Storage System Installation and Removal Form for Certified Contractors form - Any photos of the replacement activities | |||||||
07/27/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | 2024 test records must be provided to the Department or testing must be performed immediately and a copy of the test results provided to the Department. | |||||||
07/27/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | 2024 test records must be provided to the Department or testing must be performed immediately and a copy of the test results provided to the Department. | |||||||
07/27/2024 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Incident Notification Form (INF) must be completed and provided to the Department. | |||||||
07/27/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | 2024 test records must be provided to the Department or testing must be performed immediately and a copy of the test results provided to the Department. | |||||||
07/27/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | 2024 test records must be provided to the Department or testing must be performed immediately and a copy of the test results provided to the Department. | |||||||
07/27/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | STP sumps must be cleaned and the Department notified. | |||||||
07/27/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Leakage must be repaired and the Department notified. | |||||||
07/27/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | 2024 test records must be provided to the Department or testing must be performed immediately and a copy of the test results provided to the Department. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
09/13/1996 | COMPLETED | 45 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||