![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 03/19/2025 Last Data Refresh: 03/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Federal Government | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 8624652 | Latitude | 27° 48' 40.6468 | ||||||||
Name |
BAY PINES VA HEALTHCARE SYSTEM 10000 BAY PINES BLVD |
Longitude | 82° 46' 26.0122 | ||||||||
BAY PINES, FL 33744-8200 | LL Method | DPHO | |||||||||
Contact | Justin Carman | LL Status | REVIEWED | ||||||||
Phone | (727) 398-6661 | Status Date | 09/08/2003 | ||||||||
Account Owner Information | |||||||||||
Name | DEPT OF VETERANS AFFAIRS MEDICAL 10000 Bay Pines Blvd Bay Pines, FL 33744-5005 |
Effective Date | 08/30/1999 | ||||||||
Contact | JUSTIN CARMAN | ||||||||||
Phone | (727) 383-6524 | ||||||||||
JUSTIN.CARMAN@VA.GOV | |||||||||||
Placard # / Date | 698949 - 07/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | DEPT OF VETERANS AFFAIRS MEDICAL 10000 Bay Pines Blvd Bay Pines, FL 33744-5005 |
Effective Date | 08/30/1999 | ||||||||
Contact | JUSTIN CARMAN | ||||||||||
Phone | (727) 383-6524 | ||||||||||
JUSTIN.CARMAN@VA.GOV | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
22 | 2000 | Emerg Generator Diesel (G) | 01/01/1998 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system (M) Double wall - pipe jacket (N) Approved synthetic material |
(6) External piping monitoring (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
23 | 2000 | Emerg Generator Diesel (G) | 01/01/1998 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system (M) Double wall - pipe jacket (N) Approved synthetic material |
(6) External piping monitoring (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
24 | 1500 | Emerg Generator Diesel (G) | 01/01/1998 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
25 | 30000 | Emerg Generator Diesel (G) | 05/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (6) External piping monitoring (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
26 | 30000 | Emerg Generator Diesel (G) | 05/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (6) External piping monitoring (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
27 | 30000 | Emerg Generator Diesel (G) | 05/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (6) External piping monitoring (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
28 | 30000 | Emerg Generator Diesel (G) | 05/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (6) External piping monitoring (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
29 | 4000 | Generator/Pump Diesel (H) | 01/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system (M) Double wall - pipe jacket (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (6) External piping monitoring (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
30 | 4000 | Unleaded Gas (B) | 01/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
31 | 4000 | Vehicular Diesel (D) | 01/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
32 | 4000 | Emerg Generator Diesel (G) | 02/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system (M) Double wall - pipe jacket (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (6) External piping monitoring (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
34 | 40000 | Emerg Generator Diesel (G) | 03/01/2013 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (6) External piping monitoring (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
35 | 40000 | Emerg Generator Diesel (G) | 03/01/2013 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (6) External piping monitoring (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
36 | 40000 | Emerg Generator Diesel (G) | 03/01/2013 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (6) External piping monitoring (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
37 | 8000 | Unleaded Gas (B) | 03/31/2015 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
38 | 10000 | Emerg Generator Diesel (G) | 09/01/2023 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating |
(6) External piping monitoring (F) Monitor dbl wall tank space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
39 | 1009 | Emerg Generator Diesel (G) | 02/22/2024 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (P) Level gauges/alarms (Z) DEP approved tank material |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (F) Double wall |
(1) Continuous electronic sensing (6) External piping monitoring (F) Monitor dbl wall tank space (G) Electronic line leak detector (Q) Visual inspection of ASTs (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 285 | Emerg Generator Diesel (G) | 11/01/1988 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 500 | Emerg Generator Diesel (G) | 04/01/1983 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 1000 | Emerg Generator Diesel (G) | 09/01/1971 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (M) Manual tank gauging - USTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 1000 | Emerg Generator Diesel (G) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (M) Manual tank gauging - USTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 565 | Emerg Generator Diesel (G) | 07/01/1972 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
13 | 30000 | Fuel Oil - Onsite Heat (M) | 03/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (G) Pipe trench liner (J) Pressurized piping system |
(F) Monitor dbl wall tank space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
14 | 30000 | Fuel Oil - Onsite Heat (M) | 03/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (G) Pipe trench liner (J) Pressurized piping system |
(F) Monitor dbl wall tank space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
15 | 30000 | Fuel Oil - Onsite Heat (M) | 03/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (G) Pipe trench liner (J) Pressurized piping system |
(F) Monitor dbl wall tank space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
16 | 30000 | Fuel Oil - Onsite Heat (M) | 03/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (G) Pipe trench liner (J) Pressurized piping system |
(F) Monitor dbl wall tank space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
17 | 500 | Emerg Generator Diesel (G) | 03/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
18 | 3000 | Emerg Generator Diesel (G) | 12/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(Z) DEP approved tank material | (C) Fiberglass (M) Double wall - pipe jacket |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
19 | 2000 | Emerg Generator Diesel (G) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(Z) DEP approved tank material | (C) Fiberglass (M) Double wall - pipe jacket |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
20 | 4000 | Generator/Pump Diesel (H) | 07/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(I) Suction piping system (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
21 | 6500 | Fuel Oil - Onsite Heat (M) | 07/01/1931 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(X) Concrete | (A) Abv, no soil contact | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
33 | 9950 | Emerg Generator Diesel (G) | 01/01/2011 | ABOVEGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system (Z) DEP approved piping |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Unleaded Gas (B) | 01/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Generator/Pump Diesel (H) | 01/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms |
(K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material (P) Internal pipe/internal sump riser |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (D) SPCC Plan (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (T) Annual tightness test/Inventory |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 4000 | Emerg Generator Diesel (G) | 07/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(I) Suction piping system (M) Double wall - pipe jacket (N) Approved synthetic material |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 15000 | Fuel Oil - Onsite Heat (M) | 07/01/1982 | ABOVEGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(M) Spill containment bucket | (B) Steel/galvanized metal (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 1000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 2000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (D) External protective coating | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (D) External protective coating | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | |||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 11/03/2020 | 11/03/2030 | |||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 11/03/2008 | 11/03/2010 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
LTR | 03/27/2006 | 03/29/2006 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 03/24/2006 | 03/27/2006 | IN-COMPLIANCE | STRAUSS | 3/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/16/2006 | 03/21/2006 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 02/28/2006 | 03/13/2006 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/22/2006 | 03/13/2006 | MINOR OUT-OF-COMPLIANCE | STRAUSS | 3/4 | COMPLIANCE ASSURANCE | |||||
TCI | 02/18/2005 | 03/09/2005 | IN-COMPLIANCE | BARNETT | 3/4 | COMPLIANCE ASSURANCE | |||||
LTR | 02/18/2005 | 03/09/2005 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 07/26/2004 | 08/10/2004 | IN-COMPLIANCE | SOWERS | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALL OF ENVIRON FOR UNLEADED LINE | |||||||||||
LTR | 06/30/2004 | 07/13/2004 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TXI | 06/23/2004 | 07/13/2004 | IN-COMPLIANCE | BARNETT | 6/8 | COMPLIANCE ASSURANCE | |||||
SV | 05/24/2004 | 03/06/2005 | STRAUSS | 0/0 | DISCHARGE PROJECT | ||||||
TCI | 05/11/2004 | 05/25/2004 | IN-COMPLIANCE | PINK | 3/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes TCI WHITE SW FLEX IN CHASE - VEHICULAR FUEL TANKS | |||||||||||
LTR | 05/11/2004 | 05/25/2004 | PINK | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 08/26/2003 | 09/02/2003 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 08/22/2003 | 09/02/2003 | IN-COMPLIANCE | ROGGELIN | 2/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes WITH JACK PINK; VERIFIED PRESENCE OF ANTI-SIPHON DEVICES | |||||||||||
RRBD | 06/18/2003 | 07/14/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CONTRACT P O ISSUED FOR INSTALLATION OF ANTI-SIPHON VALVES | |||||||||||
RRBD | 05/08/2003 | 05/23/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 05/07/2003 | 05/09/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/24/2003 | 05/09/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | STRAUSS | 3/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes DW TCI WHITE FLEX IN CHASE (VEHICULAR FUEL TANKS) | |||||||||||
RRBD | 05/14/2002 | 05/29/2002 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 04/17/2002 | 05/06/2002 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/16/2002 | 05/05/2002 | MINOR OUT-OF-COMPLIANCE | TAM | 3/8 | COMPLIANCE ASSURANCE | |||||
TCI | 05/02/2001 | 05/14/2001 | MINOR OUT-OF-COMPLIANCE | HALSCOTT | 3/8 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/18/2000 | 09/07/2000 | CASTOR | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 06/22/2000 | 06/23/2000 | MINOR OUT-OF-COMPLIANCE | CASTOR | 3/8 | COMPLIANCE ASSURANCE | |||||
TCI | 03/26/1999 | 04/01/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | SOWERS | 3/8 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 10/15/2024 | Accepted | PUHR_NM_1 | Enforcement | |||||||
Record Document | 08/30/2024 | Satisfied | PUHR_NM_1 | Compliance Assistance | |||||||
Site Inspection | 05/31/2024 | Major Out of Compliance | PUHR_NM_1 | 5/12 | Routine Compliance | ||||||
Letter | 05/31/2024 | Satisfied | PUHR_NM_1 | Compliance Assistance | |||||||
Letter | 05/02/2024 | Satisfied | PUHR_NM_1 | Installation | |||||||
Site Inspection | 05/02/2024 | In Compliance | PUHR_NM_1 | 1/0 | Installation | ||||||
Site Inspection | 10/17/2023 | In Compliance | PUHR_NM_1 | 5/12 | Closure | ||||||
Site Inspection | 10/17/2023 | In Compliance | PUHR_NM_1 | 5/12 | Installation | ||||||
Letter | 10/17/2023 | Satisfied | PUHR_NM_1 | Closure | |||||||
Letter | 10/17/2023 | Satisfied | PUHR_NM_1 | Compliance Assistance | |||||||
Site Inspection | 04/29/2022 | Major Out of Compliance | COLSON_NJ_1 | 4/12 | Routine Compliance | ||||||
Letter | 04/29/2022 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 03/30/2022 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Record Document | 07/12/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Letter | 07/12/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Record Document | 05/21/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 05/06/2019 | Minor Out of Compliance | COLSON_NJ_1 | 4/12 | Routine Compliance | ||||||
Letter | 05/06/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 03/08/2019 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Discharge Reporting | 07/06/2017 | Satisfied | COLSON_NJ_1 | Discharge | |||||||
Site Inspection | 07/05/2017 | In Compliance | COLSON_NJ_1 | 0/1 | Discharge | ||||||
Document Management | 07/05/2017 | Satisfied | COLSON_NJ_1 | Discharge | |||||||
Issue Document | 03/30/2017 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 03/30/2017 | In Compliance | COLSON_NJ_1 | 1/0 | Non-Compliance | ||||||
Site Inspection | 02/16/2017 | Minor Out of Compliance | COLSON_NJ_1 | 4/12 | Routine Compliance | ||||||
Letter | 02/16/2017 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Electronic Communication | 01/23/2017 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Meeting | 01/23/2017 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Discharge Reporting | 08/31/2016 | Satisfied | COLSON_NJ_1 | Discharge | |||||||
Letter | 08/31/2016 | Satisfied | COLSON_NJ_1 | Discharge | |||||||
Document Management | 08/26/2016 | Satisfied | COLSON_NJ_1 | Discharge | |||||||
Site Inspection | 08/26/2016 | Minor Out of Compliance | COLSON_NJ_1 | 5/11 | Discharge | ||||||
Letter | 08/26/2016 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Meeting | 09/09/2015 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Letter | 06/08/2015 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 06/08/2015 | Minor Out of Compliance | COLSON_NJ_1 | 0/1 | Installation | ||||||
Letter | 04/02/2015 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 04/02/2015 | Minor Out of Compliance | STRAUSS_RH_1 | 0/3 | Installation | ||||||
Electronic Communication | 01/09/2015 | Satisfied | STRAUSS_RH_1 | Installation | |||||||
Record Document | 07/11/2014 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 05/20/2014 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 05/20/2014 | Major Out of Compliance | STRAUSS_RH_1 | 4/11 | Routine Compliance | ||||||
Issue Document | 01/14/2014 | Satisfied | STRAUSS_RH_1 | Discharge | |||||||
Letter | 01/07/2014 | Satisfied | STRAUSS_RH_1 | Discharge | |||||||
Site Inspection | 01/07/2014 | In Compliance | STRAUSS_RH_1 | 0/0 | Discharge | ||||||
Document Management | 01/07/2014 | Complete | STRAUSS_RH_1 | Discharge | |||||||
Discharge Reporting | 01/07/2014 | Satisfied | STRAUSS_RH_1 | Discharge | |||||||
Record Document | 01/07/2014 | Satisfied | STRAUSS_RH_1 | Discharge | |||||||
Site Inspection | 07/17/2013 | In Compliance | STRAUSS_RH_1 | 4/11 | Non-Compliance | ||||||
Issue Document | 07/17/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
TCAR | 07/15/2013 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Record Document | 07/05/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Discharge Reporting | 06/12/2013 | Satisfied | STRAUSS_RH_1 | Discharge | |||||||
Letter | 06/04/2013 | Satisfied | STRAUSS_RH_1 | Discharge | |||||||
Document Management | 06/04/2013 | Complete | STRAUSS_RH_1 | Discharge | |||||||
Letter | 05/03/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 05/03/2013 | Minor Out of Compliance | STRAUSS_RH_1 | 3/11 | Routine Compliance | ||||||
Issue Document | 05/02/2013 | Satisfied | STRAUSS_RH_1 | Installation | |||||||
Site Inspection | 05/02/2013 | In Compliance | STRAUSS_RH_1 | 1/0 | Installation | ||||||
Electronic Communication | 04/29/2013 | Satisfied | ROGGELIN_EM_1 | Routine Compliance | |||||||
Site Inspection | 07/22/2011 | In Compliance | STRAUSS_RH_1 | 3/8 | Non-Compliance | ||||||
Letter | 06/01/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 06/01/2011 | Minor Out of Compliance | STRAUSS_RH_1 | 3/8 | Routine Compliance | ||||||
Meeting | 12/17/2010 | Satisfied | ROGGELIN_EM_1 | Installation | |||||||
Meeting | 12/17/2010 | Satisfied | ROGGELIN_EM_1 | Installation | |||||||
Letter | 07/22/2010 | Satisfied | SOWERS_JA_1 | Closure | |||||||
TCAR | 07/22/2010 | Satisfied | SOWERS_JA_1 | Closure | |||||||
Document Management | 07/22/2010 | Complete | SOWERS_JA_1 | Closure | |||||||
Letter | 07/22/2010 | Satisfied | SOWERS_JA_1 | Closure | |||||||
Document Management | 07/22/2010 | Complete | SOWERS_JA_1 | Closure | |||||||
TCAR | 07/22/2010 | Satisfied | SOWERS_JA_1 | Closure | |||||||
Site Inspection | 07/12/2010 | In Compliance | STRAUSS_RH_1 | 3/8 | Non-Compliance | ||||||
Record Document | 06/24/2010 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Electronic Communication | 06/24/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Electronic Communication | 06/24/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 06/16/2010 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Letter | 06/16/2010 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Site Inspection | 06/14/2010 | Major Out of Compliance | ROGGELIN_EM_1 | 0/1 | Installation | ||||||
Letter | 06/14/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 06/14/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 06/14/2010 | Major Out of Compliance | ROGGELIN_EM_1 | 0/3 | Installation | ||||||
Site Inspection | 06/14/2010 | Major Out of Compliance | STRAUSS_RH_1 | 1/0 | Non-Compliance | ||||||
Discharge Reporting | 05/21/2010 | Satisfied | SOWERS_JA_1 | Discharge | |||||||
Document Management | 05/21/2010 | Complete | SOWERS_JA_1 | Discharge | |||||||
Letter | 05/10/2010 | Satisfied | SOWERS_JA_1 | Discharge | |||||||
Document Management | 05/07/2010 | Complete | SOWERS_JA_1 | Closure | |||||||
Letter | 05/04/2010 | Satisfied | SOWERS_JA_1 | Closure | |||||||
Document Management | 05/04/2010 | Complete | SOWERS_JA_1 | Closure | |||||||
Letter | 04/28/2010 | Satisfied | SOWERS_JA_1 | Closure | |||||||
TCAR | 04/28/2010 | Satisfied | SOWERS_JA_1 | Closure | |||||||
Record Document | 04/23/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 03/17/2010 | Major Out of Compliance | STRAUSS_RH_1 | 3/8 | Routine Compliance | ||||||
Letter | 03/17/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 02/05/2010 | In Compliance | SOWERS_JA_1 | 0/1 | Closure | ||||||
Issue Document | 01/28/2010 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Site Inspection | 01/25/2010 | In Compliance | ROGGELIN_EM_1 | 0/1 | Closure | ||||||
Site Inspection | 11/24/2009 | In Compliance | SOWERS_JA_1 | 0/2 | Closure | ||||||
Phone Conversation | 02/16/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 01/05/2009 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Record Document | 12/09/2008 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Letter | 11/04/2008 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 11/04/2008 | Major Out of Compliance | BARNETT_JX | 3/8 | Routine Compliance | ||||||
TCAR | 05/27/2008 | Satisfied | STRAUSS_RH_1 | Closure | |||||||
Site Inspection | 02/29/2008 | In Compliance | ROGGELIN_EM_1 | 0/4 | Installation | ||||||
Site Inspection | 02/29/2008 | In Compliance | ROGGELIN_EM_1 | 0/4 | Closure | ||||||
TCAR | 02/14/2008 | Satisfied | STRAUSS_RH_1 | Closure | |||||||
Record Document | 12/28/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 12/13/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 12/12/2007 | Major Out of Compliance | LONGEN_JL_1 | 0/1 | Installation | ||||||
Letter | 11/28/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 11/28/2007 | Major Out of Compliance | LONGEN_JL_1 | 3/0 | Non-Compliance | ||||||
Letter | 11/28/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 11/28/2007 | Major Out of Compliance | LONGEN_JL_1 | 0/1 | Closure | ||||||
Phone Conversation | 11/28/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Record Document | 11/20/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 08/09/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 08/09/2007 | Major Out of Compliance | LONGEN_JL_1 | 3/4 | Routine Compliance | ||||||
Site Inspection | 03/22/2007 | In Compliance | LONGEN_JL_1 | 0/3 | Installation | ||||||
TCAR | 08/01/2006 | Satisfied | STRAUSS_RH_1 | Closure | |||||||
Site Inspection | 07/21/2006 | In Compliance | STRAUSS_RH_1 | 0/1 | Installation | ||||||
Letter | 07/18/2006 | Satisfied | STRAUSS_RH_1 | Closure | |||||||
Site Inspection | 07/18/2006 | In Compliance | STRAUSS_RH_1 | 0/1 | Closure | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/31/2024 | 6051 | SNC-B | 4.5 Overfill prevention not provided or properly functioning. | Repair the overfill protection devices and provide documentation to this office when completed. The site rep noted that a work order would be placed to have every single overfill alarm battery replaced. | |||||||
05/31/2024 | 6023 | Minor | 4.1 Secondary containment or integral piping not installed to allow for monitoring point. | *Provide documentation that the appropriate sumps and/or dispensers have a proper monitoring point open for the double walled pipe interstices. | |||||||
05/31/2024 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | Investigate the incident and provide an explanation. Provide a vacuum test of the spill bucket in order to verify integrity. Repair or replace the VisiGauge if necessary to prevent liquid from entering the secondary space of the spill bucket. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/19/2017 | INACTIVE | BOUTWELL_CJ | |||||||||
06/29/2016 | COMPLETED | 10 | |||||||||
12/19/2013 | COMPLETED | ||||||||||
05/21/2013 | COMPLETED | 10 | |||||||||
02/16/2010 | COMPLETED | ||||||||||
04/06/1998 | COMPLETED | ||||||||||
07/10/1995 | COMPLETED | 11 | |||||||||
11/15/1993 | COMPLETED | 10 | |||||||||
07/15/1992 | COMPLETED | ||||||||||
03/27/1992 | COMPLETED | ||||||||||