DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 03/19/2025        Last Data Refresh: 03/18/2025        Report Generated from DOPPLER
 
District Southwest   Type    Federal Government
 
County Pinellas   Status    OPEN
 
ID 8624652   Latitude    27° 48' 40.6468
 
Name BAY PINES VA HEALTHCARE SYSTEM
10000 BAY PINES BLVD
Longitude    82° 46' 26.0122
  BAY PINES, FL 33744-8200 LL Method    DPHO
 
Contact Justin Carman   LL Status    REVIEWED
 
Phone (727) 398-6661   Status Date    09/08/2003
 
Account Owner Information
 
Name DEPT OF VETERANS AFFAIRS MEDICAL
10000 Bay Pines Blvd
Bay Pines, FL 33744-5005
Effective Date    08/30/1999
 
Contact JUSTIN CARMAN
 
Phone (727) 383-6524
 
Email JUSTIN.CARMAN@VA.GOV
  Placard # / Date    698949 - 07/05/2024
Property Owner Information
 
Name DEPT OF VETERANS AFFAIRS MEDICAL
10000 Bay Pines Blvd
Bay Pines, FL 33744-5005
Effective Date    08/30/1999
 
Contact JUSTIN CARMAN
 
Phone (727) 383-6524
 
Email JUSTIN.CARMAN@VA.GOV
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
22 2000 Emerg Generator Diesel (G) 01/01/1998 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(M) Double wall - pipe jacket
(N) Approved synthetic material
(6) External piping monitoring
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
23 2000 Emerg Generator Diesel (G) 01/01/1998 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(M) Double wall - pipe jacket
(N) Approved synthetic material
(6) External piping monitoring
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
24 1500 Emerg Generator Diesel (G) 01/01/1998 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(I) Suction piping system
(6) External piping monitoring
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
25 30000 Emerg Generator Diesel (G) 05/01/2007 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(3) Electronic monitor pipe sumps
(6) External piping monitoring
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
26 30000 Emerg Generator Diesel (G) 05/01/2007 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(3) Electronic monitor pipe sumps
(6) External piping monitoring
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
27 30000 Emerg Generator Diesel (G) 05/01/2007 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(3) Electronic monitor pipe sumps
(6) External piping monitoring
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
28 30000 Emerg Generator Diesel (G) 05/01/2007 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(3) Electronic monitor pipe sumps
(6) External piping monitoring
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
29 4000 Generator/Pump Diesel (H) 01/01/2010 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(I) Suction piping system
(M) Double wall - pipe jacket
(N) Approved synthetic material
(3) Electronic monitor pipe sumps
(6) External piping monitoring
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
30 4000 Unleaded Gas (B) 01/01/2010 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
31 4000 Vehicular Diesel (D) 01/01/2010 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
32 4000 Emerg Generator Diesel (G) 02/01/2010 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(I) Suction piping system
(M) Double wall - pipe jacket
(N) Approved synthetic material
(3) Electronic monitor pipe sumps
(6) External piping monitoring
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
34 40000 Emerg Generator Diesel (G) 03/01/2013 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(3) Electronic monitor pipe sumps
(6) External piping monitoring
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
35 40000 Emerg Generator Diesel (G) 03/01/2013 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(3) Electronic monitor pipe sumps
(6) External piping monitoring
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
36 40000 Emerg Generator Diesel (G) 03/01/2013 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(3) Electronic monitor pipe sumps
(6) External piping monitoring
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
37 8000 Unleaded Gas (B) 03/31/2015 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
38 10000 Emerg Generator Diesel (G) 09/01/2023 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(6) External piping monitoring
(F) Monitor dbl wall tank space
 
 
Tank Tank Size Content Installed Placement Status
39 1009 Emerg Generator Diesel (G) 02/22/2024 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
(P) Level gauges/alarms
(Z) DEP approved tank material
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(F) Double wall
(1) Continuous electronic sensing
(6) External piping monitoring
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(Q) Visual inspection of ASTs
(Z) DEP approved monitoring
 
 
Tank Tank Size Content Installed Placement Status
8 285 Emerg Generator Diesel (G) 11/01/1988 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Not required
 
 
Tank Tank Size Content Installed Placement Status
9 500 Emerg Generator Diesel (G) 04/01/1983 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Not required
 
 
Tank Tank Size Content Installed Placement Status
10 1000 Emerg Generator Diesel (G) 09/01/1971 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (M) Manual tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
11 1000 Emerg Generator Diesel (G) 07/01/1978 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (M) Manual tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
12 565 Emerg Generator Diesel (G) 07/01/1972 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (I) Not required
 
 
Tank Tank Size Content Installed Placement Status
13 30000 Fuel Oil - Onsite Heat (M) 03/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(G) Pipe trench liner
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
14 30000 Fuel Oil - Onsite Heat (M) 03/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(G) Pipe trench liner
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
15 30000 Fuel Oil - Onsite Heat (M) 03/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(G) Pipe trench liner
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
16 30000 Fuel Oil - Onsite Heat (M) 03/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(G) Pipe trench liner
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
17 500 Emerg Generator Diesel (G) 03/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Not required
 
 
Tank Tank Size Content Installed Placement Status
18 3000 Emerg Generator Diesel (G) 12/01/1980 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(Z) DEP approved tank material   (C) Fiberglass
(M) Double wall - pipe jacket
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
19 2000 Emerg Generator Diesel (G) 07/01/1981 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(Z) DEP approved tank material   (C) Fiberglass
(M) Double wall - pipe jacket
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
20 4000 Generator/Pump Diesel (H) 07/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (I) Suction piping system
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
21 6500 Fuel Oil - Onsite Heat (M) 07/01/1931 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(X) Concrete   (A) Abv, no soil contact (X) None
 
 
Tank Tank Size Content Installed Placement Status
33 9950 Emerg Generator Diesel (G) 01/01/2011 ABOVEGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(Z) DEP approved piping
(6) External piping monitoring
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
4 4000 Unleaded Gas (B) 01/01/1988 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
5 4000 Generator/Pump Diesel (H) 01/01/1988 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
(P) Level gauges/alarms
  (K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(P) Internal pipe/internal sump riser
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(5) Electronic monitor dispenser liners
(D) SPCC Plan
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(T) Annual tightness test/Inventory
 
 
Tank Tank Size Content Installed Placement Status
6 4000 Emerg Generator Diesel (G) 07/01/1985 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(M) Spill containment bucket
(O) Tight fill
  (I) Suction piping system
(M) Double wall - pipe jacket
(N) Approved synthetic material
(I) Not required
 
 
Tank Tank Size Content Installed Placement Status
7 15000 Fuel Oil - Onsite Heat (M) 07/01/1982 ABOVEGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(M) Spill containment bucket   (B) Steel/galvanized metal
(I) Suction piping system
(I) Not required
 
 
Tank Tank Size Content Installed Placement Status
1 1000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
 
 
 
Tank Tank Size Content Installed Placement Status
2 2000 Vehicular Diesel (D) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(D) Unknown   (D) External protective coating (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
3 4000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(D) Unknown   (D) External protective coating (Y) Unknown
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY  
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY   11/03/2020 11/03/2030
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY   11/03/2008 11/03/2010
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
LTR 03/27/2006 03/29/2006 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
TCR 03/24/2006 03/27/2006 IN-COMPLIANCE STRAUSS 3/4 COMPLIANCE ASSURANCE
 
RRBD 03/16/2006 03/21/2006 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
NCLI 02/28/2006 03/13/2006 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
TCI 02/22/2006 03/13/2006 MINOR OUT-OF-COMPLIANCE STRAUSS 3/4 COMPLIANCE ASSURANCE
 
TCI 02/18/2005 03/09/2005 IN-COMPLIANCE BARNETT 3/4 COMPLIANCE ASSURANCE
 
LTR 02/18/2005 03/09/2005 BARNETT 0/0 COMPLIANCE ASSURANCE
 
TIN 07/26/2004 08/10/2004 IN-COMPLIANCE SOWERS 0/1 COMPLIANCE ASSURANCE
 
 Completion Notes INSTALL OF ENVIRON FOR UNLEADED LINE
 
LTR 06/30/2004 07/13/2004 BARNETT 0/0 COMPLIANCE ASSURANCE
 
TXI 06/23/2004 07/13/2004 IN-COMPLIANCE BARNETT 6/8 COMPLIANCE ASSURANCE
 
SV 05/24/2004 03/06/2005 STRAUSS 0/0 DISCHARGE PROJECT
 
TCI 05/11/2004 05/25/2004 IN-COMPLIANCE PINK 3/4 COMPLIANCE ASSURANCE
 
 Completion Notes TCI WHITE SW FLEX IN CHASE - VEHICULAR FUEL TANKS
 
LTR 05/11/2004 05/25/2004 PINK 0/0 COMPLIANCE ASSURANCE
 
LTR 08/26/2003 09/02/2003 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
TCR 08/22/2003 09/02/2003 IN-COMPLIANCE ROGGELIN 2/0 COMPLIANCE ASSURANCE
 
 Completion Notes WITH JACK PINK; VERIFIED PRESENCE OF ANTI-SIPHON DEVICES
 
RRBD 06/18/2003 07/14/2003 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes CONTRACT P O ISSUED FOR INSTALLATION OF ANTI-SIPHON VALVES
 
RRBD 05/08/2003 05/23/2003 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
NCLI 05/07/2003 05/09/2003 STRAUSS 0/0 COMPLIANCE ASSURANCE
 
TCI 04/24/2003 05/09/2003 SIGNIFICANT OUT-OF-COMPLIANCE STRAUSS 3/4 COMPLIANCE ASSURANCE
 
 Completion Notes DW TCI WHITE FLEX IN CHASE (VEHICULAR FUEL TANKS)
 
RRBD 05/14/2002 05/29/2002 COMPLIANCE ASSURANCE
 
NCLI 04/17/2002 05/06/2002 TAM 0/0 COMPLIANCE ASSURANCE
 
TCI 04/16/2002 05/05/2002 MINOR OUT-OF-COMPLIANCE TAM 3/8 COMPLIANCE ASSURANCE
 
TCI 05/02/2001 05/14/2001 MINOR OUT-OF-COMPLIANCE HALSCOTT 3/8 COMPLIANCE ASSURANCE
 
RRBD 07/18/2000 09/07/2000 CASTOR 0/0 COMPLIANCE ASSURANCE
 
TCI 06/22/2000 06/23/2000 MINOR OUT-OF-COMPLIANCE CASTOR 3/8 COMPLIANCE ASSURANCE
 
TCI 03/26/1999 04/01/1999 SIGNIFICANT OUT-OF-COMPLIANCE SOWERS 3/8 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Enforcement Referral 10/15/2024 Accepted PUHR_NM_1 Enforcement
 
Record Document 08/30/2024 Satisfied PUHR_NM_1 Compliance Assistance
 
Site Inspection 05/31/2024 Major Out of Compliance PUHR_NM_1 5/12 Routine Compliance
 
Letter 05/31/2024 Satisfied PUHR_NM_1 Compliance Assistance
 
Letter 05/02/2024 Satisfied PUHR_NM_1 Installation
 
Site Inspection 05/02/2024 In Compliance PUHR_NM_1 1/0 Installation
 
Site Inspection 10/17/2023 In Compliance PUHR_NM_1 5/12 Closure
 
Site Inspection 10/17/2023 In Compliance PUHR_NM_1 5/12 Installation
 
Letter 10/17/2023 Satisfied PUHR_NM_1 Closure
 
Letter 10/17/2023 Satisfied PUHR_NM_1 Compliance Assistance
 
Site Inspection 04/29/2022 Major Out of Compliance COLSON_NJ_1 4/12 Routine Compliance
 
Letter 04/29/2022 Satisfied COLSON_NJ_1 Compliance Assistance
 
Electronic Communication 03/30/2022 Satisfied COLSON_NJ_1 Routine Compliance
 
Record Document 07/12/2019 Satisfied COLSON_NJ_1 Compliance Assistance
 
Letter 07/12/2019 Satisfied COLSON_NJ_1 Compliance Assistance
 
Record Document 05/21/2019 Satisfied COLSON_NJ_1 Compliance Assistance
 
Site Inspection 05/06/2019 Minor Out of Compliance COLSON_NJ_1 4/12 Routine Compliance
 
Letter 05/06/2019 Satisfied COLSON_NJ_1 Compliance Assistance
 
Electronic Communication 03/08/2019 Satisfied COLSON_NJ_1 Routine Compliance
 
Discharge Reporting 07/06/2017 Satisfied COLSON_NJ_1 Discharge
 
Site Inspection 07/05/2017 In Compliance COLSON_NJ_1 0/1 Discharge
 
Document Management 07/05/2017 Satisfied COLSON_NJ_1 Discharge
 
Issue Document 03/30/2017 Satisfied COLSON_NJ_1 Non-Compliance
 
Site Inspection 03/30/2017 In Compliance COLSON_NJ_1 1/0 Non-Compliance
 
Site Inspection 02/16/2017 Minor Out of Compliance COLSON_NJ_1 4/12 Routine Compliance
 
Letter 02/16/2017 Satisfied COLSON_NJ_1 Non-Compliance
 
Electronic Communication 01/23/2017 Satisfied COLSON_NJ_1 Routine Compliance
 
Meeting 01/23/2017 Satisfied COLSON_NJ_1 Non-Compliance
 
Discharge Reporting 08/31/2016 Satisfied COLSON_NJ_1 Discharge
 
Letter 08/31/2016 Satisfied COLSON_NJ_1 Discharge
 
Document Management 08/26/2016 Satisfied COLSON_NJ_1 Discharge
 
Site Inspection 08/26/2016 Minor Out of Compliance COLSON_NJ_1 5/11 Discharge
 
Letter 08/26/2016 Satisfied COLSON_NJ_1 Non-Compliance
 
Meeting 09/09/2015 Satisfied COLSON_NJ_1 Non-Compliance
 
Letter 06/08/2015 Satisfied COLSON_NJ_1 Non-Compliance
 
Site Inspection 06/08/2015 Minor Out of Compliance COLSON_NJ_1 0/1 Installation
 
Letter 04/02/2015 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 04/02/2015 Minor Out of Compliance STRAUSS_RH_1 0/3 Installation
 
Electronic Communication 01/09/2015 Satisfied STRAUSS_RH_1 Installation
 
Record Document 07/11/2014 Satisfied STRAUSS_RH_1 Non-Compliance
 
Letter 05/20/2014 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 05/20/2014 Major Out of Compliance STRAUSS_RH_1 4/11 Routine Compliance
 
Issue Document 01/14/2014 Satisfied STRAUSS_RH_1 Discharge
 
Letter 01/07/2014 Satisfied STRAUSS_RH_1 Discharge
 
Site Inspection 01/07/2014 In Compliance STRAUSS_RH_1 0/0 Discharge
 
Document Management 01/07/2014 Complete STRAUSS_RH_1 Discharge
 
Discharge Reporting 01/07/2014 Satisfied STRAUSS_RH_1 Discharge
 
Record Document 01/07/2014 Satisfied STRAUSS_RH_1 Discharge
 
Site Inspection 07/17/2013 In Compliance STRAUSS_RH_1 4/11 Non-Compliance
 
Issue Document 07/17/2013 Satisfied STRAUSS_RH_1 Non-Compliance
 
TCAR 07/15/2013 Satisfied ROGGELIN_EM_1 Closure
 
Record Document 07/05/2013 Satisfied STRAUSS_RH_1 Non-Compliance
 
Discharge Reporting 06/12/2013 Satisfied STRAUSS_RH_1 Discharge
 
Letter 06/04/2013 Satisfied STRAUSS_RH_1 Discharge
 
Document Management 06/04/2013 Complete STRAUSS_RH_1 Discharge
 
Letter 05/03/2013 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 05/03/2013 Minor Out of Compliance STRAUSS_RH_1 3/11 Routine Compliance
 
Issue Document 05/02/2013 Satisfied STRAUSS_RH_1 Installation
 
Site Inspection 05/02/2013 In Compliance STRAUSS_RH_1 1/0 Installation
 
Electronic Communication 04/29/2013 Satisfied ROGGELIN_EM_1 Routine Compliance
 
Site Inspection 07/22/2011 In Compliance STRAUSS_RH_1 3/8 Non-Compliance
 
Letter 06/01/2011 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 06/01/2011 Minor Out of Compliance STRAUSS_RH_1 3/8 Routine Compliance
 
Meeting 12/17/2010 Satisfied ROGGELIN_EM_1 Installation
 
Meeting 12/17/2010 Satisfied ROGGELIN_EM_1 Installation
 
Letter 07/22/2010 Satisfied SOWERS_JA_1 Closure
 
TCAR 07/22/2010 Satisfied SOWERS_JA_1 Closure
 
Document Management 07/22/2010 Complete SOWERS_JA_1 Closure
 
Letter 07/22/2010 Satisfied SOWERS_JA_1 Closure
 
Document Management 07/22/2010 Complete SOWERS_JA_1 Closure
 
TCAR 07/22/2010 Satisfied SOWERS_JA_1 Closure
 
Site Inspection 07/12/2010 In Compliance STRAUSS_RH_1 3/8 Non-Compliance
 
Record Document 06/24/2010 Satisfied ROGGELIN_EM_1 Non-Compliance
 
Electronic Communication 06/24/2010 Satisfied STRAUSS_RH_1 Non-Compliance
 
Electronic Communication 06/24/2010 Satisfied STRAUSS_RH_1 Non-Compliance
 
Letter 06/16/2010 Satisfied ROGGELIN_EM_1 Non-Compliance
 
Letter 06/16/2010 Satisfied ROGGELIN_EM_1 Non-Compliance
 
Site Inspection 06/14/2010 Major Out of Compliance ROGGELIN_EM_1 0/1 Installation
 
Letter 06/14/2010 Satisfied STRAUSS_RH_1 Non-Compliance
 
Record Document 06/14/2010 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 06/14/2010 Major Out of Compliance ROGGELIN_EM_1 0/3 Installation
 
Site Inspection 06/14/2010 Major Out of Compliance STRAUSS_RH_1 1/0 Non-Compliance
 
Discharge Reporting 05/21/2010 Satisfied SOWERS_JA_1 Discharge
 
Document Management 05/21/2010 Complete SOWERS_JA_1 Discharge
 
Letter 05/10/2010 Satisfied SOWERS_JA_1 Discharge
 
Document Management 05/07/2010 Complete SOWERS_JA_1 Closure
 
Letter 05/04/2010 Satisfied SOWERS_JA_1 Closure
 
Document Management 05/04/2010 Complete SOWERS_JA_1 Closure
 
Letter 04/28/2010 Satisfied SOWERS_JA_1 Closure
 
TCAR 04/28/2010 Satisfied SOWERS_JA_1 Closure
 
Record Document 04/23/2010 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 03/17/2010 Major Out of Compliance STRAUSS_RH_1 3/8 Routine Compliance
 
Letter 03/17/2010 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 02/05/2010 In Compliance SOWERS_JA_1 0/1 Closure
 
Issue Document 01/28/2010 Satisfied ROGGELIN_EM_1 Closure
 
Site Inspection 01/25/2010 In Compliance ROGGELIN_EM_1 0/1 Closure
 
Site Inspection 11/24/2009 In Compliance SOWERS_JA_1 0/2 Closure
 
Phone Conversation 02/16/2009 Satisfied STRAUSS_RH_1 Non-Compliance
 
Record Document 01/05/2009 Satisfied BARNETT_JX Non-Compliance
 
Record Document 12/09/2008 Satisfied BARNETT_JX Non-Compliance
 
Letter 11/04/2008 Satisfied BARNETT_JX Non-Compliance
 
Site Inspection 11/04/2008 Major Out of Compliance BARNETT_JX 3/8 Routine Compliance
 
TCAR 05/27/2008 Satisfied STRAUSS_RH_1 Closure
 
Site Inspection 02/29/2008 In Compliance ROGGELIN_EM_1 0/4 Installation
 
Site Inspection 02/29/2008 In Compliance ROGGELIN_EM_1 0/4 Closure
 
TCAR 02/14/2008 Satisfied STRAUSS_RH_1 Closure
 
Record Document 12/28/2007 Satisfied LONGEN_JL_1 Non-Compliance
 
Letter 12/13/2007 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 12/12/2007 Major Out of Compliance LONGEN_JL_1 0/1 Installation
 
Letter 11/28/2007 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 11/28/2007 Major Out of Compliance LONGEN_JL_1 3/0 Non-Compliance
 
Letter 11/28/2007 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 11/28/2007 Major Out of Compliance LONGEN_JL_1 0/1 Closure
 
Phone Conversation 11/28/2007 Satisfied LONGEN_JL_1 Non-Compliance
 
Record Document 11/20/2007 Satisfied LONGEN_JL_1 Non-Compliance
 
Letter 08/09/2007 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 08/09/2007 Major Out of Compliance LONGEN_JL_1 3/4 Routine Compliance
 
Site Inspection 03/22/2007 In Compliance LONGEN_JL_1 0/3 Installation
 
TCAR 08/01/2006 Satisfied STRAUSS_RH_1 Closure
 
Site Inspection 07/21/2006 In Compliance STRAUSS_RH_1 0/1 Installation
 
Letter 07/18/2006 Satisfied STRAUSS_RH_1 Closure
 
Site Inspection 07/18/2006 In Compliance STRAUSS_RH_1 0/1 Closure
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
05/31/2024 6051 SNC-B 4.5 Overfill prevention not provided or properly functioning. Repair the overfill protection devices and provide documentation to this office when completed. The site rep noted that a work order would be placed to have every single overfill alarm battery replaced.
 
05/31/2024 6023 Minor 4.1 Secondary containment or integral piping not installed to allow for monitoring point. *Provide documentation that the appropriate sumps and/or dispensers have a proper monitoring point open for the double walled pipe interstices.
 
05/31/2024 6015 Minor 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. Investigate the incident and provide an explanation. Provide a vacuum test of the spill bucket in order to verify integrity. Repair or replace the VisiGauge if necessary to prevent liquid from entering the secondary space of the spill bucket.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
06/19/2017   INACTIVE BOUTWELL_CJ
 
06/29/2016   COMPLETED 10
 
12/19/2013   COMPLETED
 
05/21/2013   COMPLETED 10
 
02/16/2010   COMPLETED
 
04/06/1998   COMPLETED
 
07/10/1995   COMPLETED 11
 
11/15/1993   COMPLETED 10
 
07/15/1992   COMPLETED
 
03/27/1992   COMPLETED