Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | South | Type | Fuel user/Non-retail | ||||||||
County | Desoto | Status | CLOSED | ||||||||
ID | 8626279 | Latitude | 27° 8' 9.8726 | ||||||||
Name |
POWER AUTO CORP 5673 SE HWY 31 |
Longitude | 81° 48' 10.2995 | ||||||||
ARCADIA, FL 34266-9627 | LL Method | DPHO | |||||||||
Contact | JAMIE R HILL | LL Status | REVIEWED | ||||||||
Phone | (941) 637-1161 | Status Date | 08/18/2010 | ||||||||
Account Owner Information | |||||||||||
Name | SOUTHWEST FLORIDA AVIATION 1517 NW 4TH ST CAPE CORAL, FL 33993 |
Effective Date | 08/15/2019 | ||||||||
Contact | JAMIE R HILL | ||||||||||
Phone | |||||||||||
SWFATEAM@GMAIL.COM | |||||||||||
Placard # / Date | 642861 - 07/06/2022 | ||||||||||
Property Owner Information | |||||||||||
Name | POWER AUTO CORP 5000 SE POWER DR ARCADIA, FL 34266 |
Effective Date | 06/12/2018 | ||||||||
Contact | IVOR WIGHAM | ||||||||||
Phone | (863) 993-3333 | ||||||||||
IVOR@POWERAUTOCORP.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
100 | 2000 | Fuel Oil - Onsite Heat (M) | 07/01/1970 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
101 | 1000 | Vehicular Diesel (D) | 05/01/1995 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(A) Abv, no soil contact | (F) Monitor dbl wall tank space (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
102 | 2000 | Unleaded Gas (B) | 05/01/1995 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(A) Abv, no soil contact | (F) Monitor dbl wall tank space (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
103 | 2000 | Unleaded Gas (B) | 05/01/1995 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(A) Abv, no soil contact | (F) Monitor dbl wall tank space (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
104 | 12000 | Vehicular Diesel (D) | 09/01/1998 | ABOVEGROUND | Moved to New Site (M) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 550 | Fuel Oil - Onsite Heat (M) | 07/01/1953 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 550 | Fuel Oil - Onsite Heat (M) | 07/01/1972 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
13 | 550 | Fuel Oil - Onsite Heat (M) | 07/01/1953 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
27 | 3000 | Unleaded Gas (B) | 07/01/1975 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
27B | 3000 | Vehicular Diesel (D) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
58 | 1000 | Fuel Oil - Onsite Heat (M) | 07/01/1955 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
59 | 1000 | Fuel Oil - Onsite Heat (M) | 07/01/1955 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
60 | 1000 | Fuel Oil - Onsite Heat (M) | 07/01/1955 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
61 | 1000 | Fuel Oil - Onsite Heat (M) | 07/01/1955 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
62 | 1000 | Fuel Oil - Onsite Heat (M) | 07/01/1955 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
64 | 2000 | Fuel Oil - Onsite Heat (M) | 07/01/1957 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
65 | 2000 | Fuel Oil - Onsite Heat (M) | 07/01/1958 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
72 | 3000 | Fuel Oil - Onsite Heat (M) | 07/01/1966 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
75 | 3000 | Fuel Oil - Onsite Heat (M) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
79 | 2000 | Fuel Oil - Onsite Heat (M) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
85 | 3000 | Fuel Oil - Onsite Heat (M) | 07/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
90 | 3000 | Fuel Oil - Onsite Heat (M) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
92 | 300 | Fuel Oil - Onsite Heat (M) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
93 | 300 | Fuel Oil - Onsite Heat (M) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
99 | 3000 | Fuel Oil - Onsite Heat (M) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
C4 | 280 | Fuel Oil - Onsite Heat (M) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 888 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
52 | 500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(X) Concrete | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
53 | 500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
68 | 3000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
69 | 3000 | Fuel Oil - Onsite Heat (M) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (Q) DEP approved protection |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
70 | 10000 | Fuel Oil - Onsite Heat (M) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (Q) DEP approved protection |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
71 | 2500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
73 | 20000 | Fuel Oil - Onsite Heat (M) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (Q) DEP approved protection |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 888 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 888 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
C5 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
C6 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
C7 | 500 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-NOT REQUIRED | |||||||||||
NONE | |||||||||||
NONE | 08/23/2022 | ||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 02/25/2008 | 02/25/2010 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 12/21/2005 | 01/03/2006 | IN-COMPLIANCE | DURRANCE_W | 4/0 | COMPLIANCE ASSURANCE | |||||
TIN | 12/21/2005 | 01/03/2006 | IN-COMPLIANCE | DURRANCE_W | 1/0 | COMPLIANCE ASSURANCE | |||||
SV | 06/30/2005 | 06/30/2005 | KEENE_K | 0/1 | DISCHARGE PROJECT | ||||||
Completion Notes INVESTIGATION OF SPILL FROM UNREGULATED ONSITE HEATING OIL TANK LOCATED ADJACENT TO THE FRANKLIN BUILDING. | |||||||||||
TCI | 04/05/2005 | 04/21/2005 | IN-COMPLIANCE | DURRANCE_W | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 10/31/2003 | 11/04/2003 | IN-COMPLIANCE | KEENE_K | 3/0 | COMPLIANCE ASSURANCE | |||||
TCR | 04/10/2003 | 04/11/2003 | IN-COMPLIANCE | KEENE_K | 3/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/24/2003 | 03/24/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 10/31/2002 | 11/05/2002 | MINOR OUT-OF-COMPLIANCE | KEENE_K | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/18/2001 | 09/18/2001 | IN-COMPLIANCE | KEENE_K | 3/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/18/2000 | 10/18/2000 | KEENE_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
SV | 10/10/2000 | 10/12/2000 | KEENE_K | 1/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NEW AST HAS "NON VEHICULAR FUEL" IN 4" LETTER AT FILL PORT AND ON SIDES OF TANK | |||||||||||
TCI | 09/22/2000 | 09/22/2000 | MINOR OUT-OF-COMPLIANCE | KEENE_K | 3/0 | COMPLIANCE ASSURANCE | |||||
ATCI | 05/14/1997 | 06/16/1997 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Phone Conversation | 08/31/2022 | Satisfied | PARKS_J_4 | Routine Compliance | |||||||
Electronic Communication | 08/31/2022 | Satisfied | PARKS_J_4 | Routine Compliance | |||||||
Electronic Communication | 08/26/2022 | Satisfied | PARKS_J_4 | Routine Compliance | |||||||
Document Management | 08/26/2022 | Satisfied | PARKS_J_4 | Routine Compliance | |||||||
Document Management | 08/26/2022 | Satisfied | PARKS_J_4 | Routine Compliance | |||||||
Electronic Communication | 08/25/2022 | Satisfied | PARKS_J_4 | Routine Compliance | |||||||
Phone Conversation | 08/25/2022 | Satisfied | PARKS_J_4 | Routine Compliance | |||||||
Site Inspection | 08/25/2022 | Major Out of Compliance | PARKS_J_4 | 1/0 | Routine Compliance | ||||||
Letter | 05/07/2021 | Satisfied | KLEINMANN_K_1 | Compliance Assistance | |||||||
Electronic Communication | 05/07/2021 | Satisfied | KLEINMANN_K_1 | Routine Compliance | |||||||
Electronic Communication | 01/29/2021 | Satisfied | KLEINMANN_K_1 | Routine Compliance | |||||||
Site Inspection | 01/29/2021 | Major Out of Compliance | KLEINMANN_K_1 | 2/0 | Routine Compliance | ||||||
Meeting | 11/26/2019 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Record Document | 11/05/2019 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Meeting | 07/31/2019 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Electronic Communication | 11/08/2018 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Electronic Communication | 09/06/2018 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Electronic Communication | 09/05/2018 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Letter | 08/10/2018 | Satisfied | HERNANDEZ_N | Compliance Assistance | |||||||
Site Inspection | 08/09/2018 | Major Out of Compliance | HERNANDEZ_N | 3/0 | Routine Compliance | ||||||
Site Inspection | 05/30/2018 | Major Out of Compliance | ZIMMERMAN_CA_1 | 4/0 | Routine Compliance | ||||||
Letter | 05/30/2018 | Satisfied | ZIMMERMAN_CA_1 | Compliance Assistance | |||||||
Electronic Communication | 05/30/2018 | Satisfied | ZIMMERMAN_CA_1 | Routine Compliance | |||||||
Electronic Communication | 05/22/2018 | Satisfied | ZIMMERMAN_CA_1 | Routine Compliance | |||||||
Electronic Communication | 05/22/2018 | Satisfied | ZIMMERMAN_CA_1 | Routine Compliance | |||||||
Site Inspection | 03/06/2015 | In Compliance | JOHNSON_SG_1 | 4/0 | Routine Compliance | ||||||
Site Inspection | 05/15/2012 | In Compliance | DURRANCE_WK_1 | 4/0 | Routine Compliance | ||||||
Discharge Reporting | 11/30/2011 | Satisfied | PEDIGO_L | Discharge | |||||||
Document Management | 11/30/2011 | Complete | PEDIGO_L | Discharge | |||||||
Document Management | 11/30/2011 | Complete | PEDIGO_L | Discharge | |||||||
Document Management | 11/30/2011 | Complete | PEDIGO_L | Discharge | |||||||
Discharge Reporting | 11/30/2011 | Satisfied | PEDIGO_L | Discharge | |||||||
Document Management | 11/30/2011 | Complete | PEDIGO_L | Discharge | |||||||
Document Management | 11/30/2011 | Complete | PEDIGO_L | Discharge | |||||||
Discharge Reporting | 11/30/2011 | Satisfied | PEDIGO_L | Discharge | |||||||
Discharge Reporting | 11/30/2011 | Satisfied | PEDIGO_L | Discharge | |||||||
Discharge Reporting | 11/30/2011 | Satisfied | PEDIGO_L | Discharge | |||||||
Discharge Reporting | 11/30/2011 | Satisfied | PEDIGO_L | Discharge | |||||||
Document Management | 11/30/2011 | Complete | PEDIGO_L | Discharge | |||||||
Document Management | 11/30/2011 | Complete | PEDIGO_L | Discharge | |||||||
Discharge Reporting | 11/30/2011 | Satisfied | PEDIGO_L | Discharge | |||||||
Site Inspection | 03/14/2011 | In Compliance | DURRANCE_WK_1 | 4/0 | Routine Compliance | ||||||
Site Inspection | 01/25/2010 | In Compliance | DURRANCE_WK_1 | 4/0 | Routine Compliance | ||||||
Letter | 04/10/2009 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 04/10/2009 | Minor Out of Compliance | DURRANCE_WK_1 | 4/0 | Routine Compliance | ||||||
Site Inspection | 02/27/2008 | In Compliance | MARSH_L | 4/0 | QA/QC | ||||||
Letter | 01/18/2008 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 01/18/2008 | Minor Out of Compliance | DURRANCE_WK_1 | 4/0 | Routine Compliance | ||||||
Letter | 04/03/2007 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 04/03/2007 | In Compliance | DURRANCE_WK_1 | 4/0 | Non-Compliance | ||||||
Site Inspection | 01/29/2007 | Major Out of Compliance | DURRANCE_WK_1 | 4/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
08/25/2022 | 7010 | SNC-A | 1.8 No financial responsibility instrument or expired instrument for > 180 days. | Obtain the required certificate of financial responsibility or close the tank. | |||||||
01/29/2021 | 5011 | SNC-B | 1.6 Failure to maintain and demonstrate financial responsibility. | Obtain financial responsibility. | |||||||
05/30/2018 | 5011 | SNC-B | 1.6 Failure to maintain and demonstrate financial responsibility. | Obtain an up to date current Financial responsibility and provide the proper documentation to county inspector | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
01/15/2007 | COMPLETED | ||||||||||
11/09/2006 | COMPLETED | 74 | |||||||||
11/02/2006 | COMPLETED | ||||||||||
11/01/2006 | COMPLETED | 74 | |||||||||
10/31/2006 | COMPLETED | ||||||||||
10/30/2006 | COMPLETED | ||||||||||
10/29/2006 | COMPLETED | 74 | |||||||||
10/26/2006 | COMPLETED | ||||||||||
10/14/2003 | COMPLETED | 50 | |||||||||
06/16/2000 | COMPLETED | 50 | |||||||||
12/13/1991 | COMPLETED | ||||||||||
12/12/1991 | COMPLETED | 50 | PETROLEUM CLEANUP PARTICIPATION PROGRAM-PARTIAL | ||||||||