![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Bulk Storage Facility | ||||||||
County | Monroe | Status | OPEN | ||||||||
ID | 8626406 | Latitude | 25° 0' 37.3613 | ||||||||
Name |
SUNSHINE GASOLINE DISTRIBUTORS, INC. 255 TAVERNIER ST |
Longitude | 80° 31' 2.8878 | ||||||||
TAVERNIER, FL 33070 | LL Method | DPHO | |||||||||
Contact | MAXIMO ALVAREZ | LL Status | REVIEWED | ||||||||
Phone | (305) 477-5800 | Status Date | 07/26/2021 | ||||||||
Account Owner Information | |||||||||||
Name | SUNSHINE GASOLINE DISTRIBUTORS INC 1650 NW 87TH AVE Doral, FL 33172-2614 |
Effective Date | 12/01/2021 | ||||||||
Contact | MARIO ZAMORA / VANESSA PALACIOS/BARBIE RUIZ | ||||||||||
Phone | (786) 606-0917 | ||||||||||
MZAMORA@SUNSHINEGASOLINE.COM | |||||||||||
Placard # / Date | 704750 - 12/20/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | SUNSHINE GASOLINE DISTRIBUTORS INC 1650 NW 87TH AVE Doral, FL 33172-2614 |
Effective Date | 12/01/2021 | ||||||||
Contact | MARIO ZAMORA / VANESSA PALACIOS/BARBIE RUIZ | ||||||||||
Phone | (786) 606-0917 | ||||||||||
MZAMORA@SUNSHINEGASOLINE.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 20000 | Unleaded Gas (B) | 04/01/1966 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (L) Compartmented |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 20000 | Vehicular Diesel (D) | 08/01/2024 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(B) Steel/galvanized metal | (Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 20000 | Vehicular Diesel (D) | 04/01/1966 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (L) Compartmented |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 20000 | Vehicular Diesel (D) | 04/01/1966 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 20000 | Vehicular Diesel (D) | 04/01/1966 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 20000 | Unleaded Gas (B) | 04/01/1966 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 2000 | New/Lube Oil (O) | 01/01/1995 | ABOVEGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact | (Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 8000 | New/Lube Oil (O) | 09/01/1998 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (L) Compartmented |
(A) Abv, no soil contact | (Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 20000 | Unleaded Gas (B) | 04/01/1966 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 2000 | New/Lube Oil (O) | 04/01/1966 | ABOVEGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(I) Not required (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 2000 | New/Lube Oil (O) | 04/01/1966 | ABOVEGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact | (I) Not required (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 2000 | New/Lube Oil (O) | 04/01/1996 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (C) Fiberglass |
(I) Not required (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 09/25/2023 | 09/25/2024 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 04/21/2023 | 04/21/2024 | FEDERATED MUTUAL INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2022 | 09/25/2023 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 02/17/2018 | 02/17/2019 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 02/17/2017 | 02/17/2018 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 02/17/2015 | 02/17/2016 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 02/17/2014 | 02/17/2015 | HUDSON SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 02/17/2013 | 02/17/2014 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 02/17/2011 | 02/17/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/17/2010 | 02/17/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/17/2009 | 02/17/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 03/01/1990 | 03/01/1991 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 05/10/2005 | 05/10/2005 | IN-COMPLIANCE | WINKLER | 11/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes THIS FACILITY IS IN PROCESS OF MAJOR OVERHAUL OF AST SURFACES AND REVAMPING OF MONTHLY RD TO BE MORE INCLUSIVE. TCI TO BE PERFORMED IN APPROX 90 DAYS, BEGINNING THE NEXT CONTRACT YEAR. | |||||||||||
NCLI | 05/10/2005 | 05/10/2005 | WINKLER | 11/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/26/2005 | 01/26/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | WINKLER | 11/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 01/26/2005 | 01/26/2005 | WINKLER | 11/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 08/29/2003 | 09/15/2003 | IN-COMPLIANCE | DEIDRICK | 11/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 08/05/2003 | 08/18/2003 | DEIDRICK | 11/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/28/2003 | 08/18/2003 | MINOR OUT-OF-COMPLIANCE | DEIDRICK | 11/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/08/2002 | 08/21/2002 | IN-COMPLIANCE | DEIDRICK | 11/0 | COMPLIANCE ASSURANCE | |||||
TCI | 02/12/2002 | 02/12/2002 | IN-COMPLIANCE | LAWRENCE_W | 11/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes DPRC97422, FUELING FROM TRUCKS | |||||||||||
TCI | 10/23/2000 | 10/23/2000 | IN-COMPLIANCE | LAWRENCE_W | 9/0 | COMPLIANCE ASSURANCE | |||||
TCI | 10/18/1999 | 10/20/1999 | IN-COMPLIANCE | LAWRENCE_W | 11/0 | COMPLIANCE ASSURANCE | |||||
ATCI | 09/03/1998 | 09/03/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 09/17/2024 | Accepted | PORTANYI_E | Enforcement | |||||||
Site Inspection | 08/06/2024 | Major Out of Compliance | PORTANYI_E | 10/0 | Routine Compliance | ||||||
Site Inspection | 05/25/2018 | In Compliance | WINKLER_MG_1 | 10/0 | Routine Compliance | ||||||
Letter | 05/25/2018 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Site Inspection | 09/14/2015 | In Compliance | WINKLER_MG_1 | 10/0 | Routine Compliance | ||||||
Phone Conversation | 08/21/2015 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Site Inspection | 02/05/2015 | In Compliance | WINKLER_MG_1 | 10/0 | Non-Compliance | ||||||
Site Inspection | 12/20/2013 | Major Out of Compliance | WINKLER_MG_1 | 10/0 | Routine Compliance | ||||||
Letter | 12/20/2013 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 12/16/2011 | In Compliance | WINKLER_MG_1 | 10/0 | Routine Compliance | ||||||
Site Inspection | 10/13/2010 | In Compliance | WINKLER_MG_1 | 10/0 | Routine Compliance | ||||||
Site Inspection | 06/10/2010 | In Compliance | WINKLER_MG_1 | 10/0 | Installation | ||||||
Meeting | 12/14/2009 | Satisfied | WINKLER_MG_1 | Closure | |||||||
Letter | 10/23/2009 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 10/23/2009 | Major Out of Compliance | WINKLER_MG_1 | 10/0 | Routine Compliance | ||||||
Letter | 11/04/2008 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 11/04/2008 | Minor Out of Compliance | WINKLER_MG_1 | 11/0 | Routine Compliance | ||||||
Site Inspection | 02/21/2008 | In Compliance | WINKLER_MG_1 | 11/0 | Non-Compliance | ||||||
Letter | 12/14/2007 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 12/14/2007 | Minor Out of Compliance | WINKLER_MG_1 | 11/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/14/2007 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Record Document | 10/10/2007 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Record Document | 10/09/2007 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Record Document | 10/09/2007 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Record Document | 10/09/2007 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Meeting | 07/20/2007 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Record Document | 04/09/2007 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 04/09/2007 | In Compliance | WINKLER_MG_1 | 11/0 | Non-Compliance | ||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Letter | 10/05/2006 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 10/05/2006 | Minor Out of Compliance | WINKLER_MG_1 | 11/0 | Routine Compliance | ||||||
Record Document | 09/27/2006 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Letter | 05/02/2006 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 04/27/2006 | Major Out of Compliance | WINKLER_MG_1 | 11/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
07/18/2024 | 7035 | SNC-B | 3.5 Storage tanks not constructed according to manufacturer's instructions or reference standards or meet inspection schedule established. | Provide the Department with API Std 653 inspection reports for all six (6) field erected bulk tanks. | |||||||
07/17/2024 | 7040 | SNC-B | 3.8 Overfill protection not provided. Fuel transfer not monitored. Alarms not installed. | Rule 62-762.502(2)(e)5. a. Designate a primary overfill protection device that meets the requirements in subparagraph 62-762.502(2)(e)3., F.A.C., and, b. Ensure the designated primary overfill protection device is registered pursuant to subsection 62-762.851(2), F.A.C. | |||||||
07/17/2024 | 7019 | SNC-B | 3.1 Failure of secondary containment materials to meet standards. | Ensure that design of the secondary containment area meets the requirements set by Rule 62-762.501(1)(b)1.a and provide documentation to the Department. | |||||||
07/17/2024 | 7104 | Minor | 1.13 Closure Integrity Report and Evaluation not completed and submitted in a timely fashion. | Provide the Department with either the Closure Report or Closure Integrity Evaluation from the removal of the 8,000-gallon AST (Alias Tank #11). | |||||||
07/02/2024 | 7097 | Minor | 3.9 Requirements not met for out of service systems including registering system out-of-service and securing out-of-service system. | File updated registration with the Department. Ensure that maintenance requirements are met per Rule 62-762.802. If tank is to be closed, conduct full closure and update registration accordingly. | |||||||
06/06/2024 | 7011 | Minor | 1.9 Appropriate paperwork for financial responsibility improperly completed or maintained. | Provide documentation of financial responsibility for minimum 2019-2023. | |||||||
05/30/2024 | 7095 | Minor | 1.14 Records requiring 3 year documentation period not kept by facility. | Provide the Department with minimum of 3-year history (2020-2023) of monthly monitoring for each of the ten (10) regulated tanks and integrity testing of sumps. | |||||||
10/11/2023 | 7007 | Minor | 3.1 Incident Notification Form (INF) not received in a timely manner. | Conduct investigation for the event and provide the Department with an Incident Notification Form (INF) and investigation results. | |||||||
10/11/2023 | 7042 | SNC-B | 3.9 Storage tank system not installed with a spill containment system at each tank fill connection. Does not meet performance requirements. | Ensure that the fill port spill containment system is brought to performance requirements described in 62-762.502(1)(b), F.A.C. Materials shall be: a. Impervious to the regulated substances and able to withstand deterioration from external environmental conditions; b. non-corrosive or of corrosion-protected materials; and, c. Of sufficient thickness and strength to withstand hydrostatic forces at maximum capacity to prevent a discharge. | |||||||
10/11/2023 | 7094 | Minor | 1.13 Permanent records not available within 5 working days notice. | Provide historical documents of INF, DRF, API 653 reports, and financial responsibility policies. | |||||||
10/11/2023 | 7090 | Minor | 3.15 Spill containment, dispenser liners and piping sumps not accessible; water and regulated substances not removed. | Remove and properly dispose of liquid and absorbent pads from concrete containment area. Provide evidence of the correction and the equipment number (EQ#) for concrete coating or liner. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/19/1988 | ACTIVE | 8 | EARLY DETECTION INCENTIVE-ELIGIBLE | YOUSAFI_N | |||||||