![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | South | Type | Retail Station | ||||||||
County | Desoto | Status | OPEN | ||||||||
ID | 8626412 | Latitude | 27° 9' 7.9678 | ||||||||
Name |
STOP & GO 4991 SE HWY 31 |
Longitude | 81° 48' 33.6522 | ||||||||
ARCADIA, FL 34266 | LL Method | DPHO | |||||||||
Contact | ROKSANA SULTANA | LL Status | REVIEWED | ||||||||
Phone | (863) 832-1366 | Status Date | 09/03/2003 | ||||||||
Account Owner Information | |||||||||||
Name | RAMIN INC PO BOX 298 ZOLFO SPRINGS, FL 33890 |
Effective Date | 10/29/2014 | ||||||||
Contact | ROKSANA SULTANA | ||||||||||
Phone | (863) 832-1366 | ||||||||||
ROKSANANABIHA@YAHOO.COM | |||||||||||
Placard # / Date | 688262 - 06/17/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | RAMIN INC PO BOX 298 ZOLFO SPRINGS, FL 33890 |
Effective Date | 10/13/2017 | ||||||||
Contact | ROKSANA SULTANA | ||||||||||
Phone | (863) 832-1366 | ||||||||||
ROKSANANABIHA@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 12000 | Unleaded Gas (B) | 11/01/1996 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 4000 | Vehicular Diesel (D) | 11/01/1996 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Unleaded Gas (B) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Unleaded Gas (B) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 3000 | Vehicular Diesel (D) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (N) Flow shut-Off |
(C) Fiberglass (I) Suction piping system |
(8) Manually sampled wells (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 3000 | Vehicular Diesel (D) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (N) Flow shut-Off |
(C) Fiberglass (I) Suction piping system |
(8) Manually sampled wells (M) Manual tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
NONE | |||||||||||
INSURANCE | 05/30/2018 | 05/30/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/03/2017 | 05/03/2018 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 05/03/2016 | 05/03/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 05/03/2015 | 05/03/2016 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 05/03/2014 | 05/03/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/03/2010 | 05/03/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 03/21/2003 | 05/03/2010 | AIG | ||||||||
INSURANCE | 08/25/1989 | 05/20/2001 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 04/21/2006 | 04/21/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | DURRANCE_W | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 03/10/2005 | 04/05/2005 | MINOR OUT-OF-COMPLIANCE | HARRISONBL | 2/0 | COMPLIANCE ASSURANCE | |||||
TCR | 03/09/2004 | 03/10/2004 | IN-COMPLIANCE | HARRISON_BL | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/12/2003 | 08/29/2003 | MINOR OUT-OF-COMPLIANCE | KEENE_K | 2/0 | COMPLIANCE ASSURANCE | |||||
TCR | 02/17/2003 | 02/17/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | HARRISON_B | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/27/2002 | 10/04/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | KEENE_K | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/20/2001 | 08/20/2001 | IN-COMPLIANCE | KEENE_K | 2/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/16/2000 | 10/20/2000 | KEENE_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/23/2000 | 08/28/2000 | IN-COMPLIANCE | KEENE_K | 2/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes REGISTRATION FOR NEW OWNER SUBMITTED. INVOICED ON AUGUST 22, 2000. | |||||||||||
TCI | 04/20/1999 | 05/13/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | JOYCE_T | 2/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 11/14/2024 | Accepted | PARKS_J_4 | Enforcement | |||||||
Site Inspection | 03/23/2022 | Major Out of Compliance | PARKS_J_4 | 2/0 | Routine Compliance | ||||||
Phone Conversation | 03/23/2022 | Satisfied | PARKS_J_4 | Routine Compliance | |||||||
Site Inspection | 11/29/2018 | Major Out of Compliance | SAUTTER_MA_2 | 2/0 | Routine Compliance | ||||||
Letter | 11/29/2018 | Satisfied | SAUTTER_MA_2 | Compliance Assistance | |||||||
Electronic Communication | 07/21/2017 | Satisfied | HERNANDEZ_N | Discharge | |||||||
Electronic Communication | 06/29/2017 | Satisfied | HERNANDEZ_N | Discharge | |||||||
Site Inspection | 05/05/2017 | In Compliance | ZIMMERMAN_CA_1 | 2/0 | Non-Compliance | ||||||
Site Inspection | 12/20/2016 | Major Out of Compliance | HERNANDEZ_N | 2/0 | QA/QC | ||||||
Site Inspection | 12/20/2016 | Major Out of Compliance | HERNANDEZ_N | 2/0 | Discharge | ||||||
Issue Document | 12/07/2016 | Satisfied | HERNANDEZ_N | Discharge | |||||||
Letter | 11/30/2016 | Satisfied | ZIMMERMAN_CA_1 | Non-Compliance | |||||||
Site Inspection | 11/30/2016 | Major Out of Compliance | ZIMMERMAN_CA_1 | 2/0 | Routine Compliance | ||||||
Letter | 04/21/2016 | Satisfied | ZIMMERMAN_CA_1 | Non-Compliance | |||||||
Enforcement Tracking | 03/03/2015 | Closed Without Enforcement | SAUTTER_M | Enforcement | |||||||
Enforcement Referral | 03/02/2015 | Accepted | STANDIFORD_J | Enforcement | |||||||
Site Inspection | 01/15/2015 | Major Out of Compliance | ZIMMERMAN_CA_1 | 2/0 | Non-Compliance | ||||||
Site Inspection | 11/05/2014 | Major Out of Compliance | ZIMMERMAN_CA_1 | 2/0 | Non-Compliance | ||||||
Site Inspection | 07/11/2014 | Major Out of Compliance | ZIMMERMAN_CA_1 | 2/0 | Routine Compliance | ||||||
Letter | 07/11/2014 | Satisfied | ZIMMERMAN_CA_1 | Non-Compliance | |||||||
Document Management | 12/19/2011 | Complete | DURRANCE_WK_1 | Discharge | |||||||
Site Inspection | 12/16/2011 | In Compliance | DURRANCE_WK_1 | 2/0 | Discharge | ||||||
Document Management | 12/16/2011 | Complete | DURRANCE_WK_1 | Discharge | |||||||
Site Inspection | 10/19/2010 | In Compliance | DURRANCE_WK_1 | 2/0 | Non-Compliance | ||||||
Letter | 07/30/2010 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 07/27/2010 | Major Out of Compliance | DURRANCE_WK_1 | 2/0 | Routine Compliance | ||||||
Letter | 08/10/2009 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 08/10/2009 | Minor Out of Compliance | DURRANCE_WK_1 | 2/0 | Non-Compliance | ||||||
Letter | 05/19/2009 | Satisfied | DURRANCE_WK_1 | Closure | |||||||
Letter | 05/19/2009 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 05/19/2009 | Major Out of Compliance | DURRANCE_WK_1 | 2/0 | Routine Compliance | ||||||
Letter | 12/01/2008 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 12/01/2008 | Minor Out of Compliance | DURRANCE_WK_1 | 2/0 | Installation | ||||||
Letter | 11/10/2008 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 11/10/2008 | Minor Out of Compliance | DURRANCE_WK_1 | 2/0 | Closure | ||||||
Site Inspection | 07/16/2008 | Minor Out of Compliance | DURRANCE_WK_1 | 1/0 | Non-Compliance | ||||||
Letter | 07/16/2008 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 04/22/2008 | Major Out of Compliance | DURRANCE_WK_1 | 2/0 | Routine Compliance | ||||||
Letter | 04/22/2008 | Satisfied | DURRANCE_WK_1 | Non-Compliance | |||||||
Site Inspection | 06/12/2007 | In Compliance | DURRANCE_WK_1 | 2/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/05/2007 | Satisfied | DURRANCE_WK_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | DURRANCE_WK_1 | Routine Compliance | |||||||
Site Inspection | 07/26/2006 | In Compliance | DURRANCE_WK_1 | 2/4 | Non-Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/23/2022 | 7040 | SNC-B | 3.8 Overfill protection not provided. Fuel transfer not monitored. Alarms not installed. | Conduct Annual Operability testing on all overfill protection devices. | |||||||
03/23/2022 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Conduct the required testing. | |||||||
03/23/2022 | 7030 | Minor | 3.6 Exterior coatings not protected from external corrosion, deterioration or degradation. | Remove the rust from and paint all corroded surfaces. | |||||||
03/23/2022 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Begin conducting Annual Testing. | |||||||
03/23/2022 | 7064 | Minor | 3.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Monthly visual inspections are not being conducted. | |||||||
03/23/2022 | 7094 | Minor | 1.13 Permanent records not available within 5 working days notice. | No records of Monthly inspections, Annual operability or financial responsibility were made available for review. | |||||||
03/23/2022 | 7051 | SNC-B | 1.2 Pressurized piping or secondarily contained piping in contact with soil does not have appropriate testing, including breach of integrity, tightness or electronic leak detection. | Please conduct the required integrity testing on the piping. | |||||||
03/23/2022 | 7009 | SNC-B | 1.7 No financial responsibility instrument or expired instrument for < 180 days. | Please submit the Certificate of Financial Responsibility for review. | |||||||
03/23/2022 | 7063 | SNC-A | 1.5 Storage tank systems does not have appropriate testing, including breach of integrity, tightness or electronic leak detection. | Conduct annual operability on all release detection methods. | |||||||
11/29/2018 | 5126 | Minor | 3.16 Spill containment, sumps, and interstices not accessible. Water/regulated substance not timely removed for shop fabricated storage tank systems. Petroleum contact water not properly managed. | Remove all water from dispenser sumps in a timely fashion and dispose of properly. Provide documentation of the water removal and proper disposal to the county inspector. | |||||||
11/29/2018 | 5042 | SNC-B | 3.22 Failure to provide approved overfill protection for shop fabricated tank systems. | Repair or replace the overfill alarms and provide documentation to the county inspector. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
11/21/2016 | INACTIVE | ||||||||||
06/15/2011 | INACTIVE | 6 | |||||||||
12/22/2010 | INACTIVE | 6 | |||||||||
06/29/1993 | INACTIVE | 6 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||