Report Run Date: 05/12/2025        Last Data Refresh: 05/11/2025        Report Generated from DOPPLER
 
District Southwest   Type    Marine/Coastal Fuel Storage
 
County Citrus   Status    OPEN
 
ID 8626552   Latitude    28° 54' 13.944
 
Name TWIN RIVERS MARINA
2880 N SEA BREEZE PT (CR 44 W)
Longitude    82° 38' 29.6149
  CRYSTAL RIVER, FL 34429 LL Method    DPHO
 
Contact ANDREW J HUPP   LL Status    REVIEWED
 
Phone (352) 795-3552   Status Date    02/07/2003
 
Account Owner Information
 
Name TWIN RIVERS HOLDING LLC
907 S FORT HARRISON AVE #102
CLEARWATER, FL 33756
Effective Date    06/05/2020
 
Contact ANDREW J HUPP
 
Phone (727) 210-1900
 
Email AHUPP@ONEOAKDEV.COM
  Placard # / Date    705497 - 04/07/2025
Property Owner Information
 
Name TWIN RIVERS HOLDING LLC
907 S FORT HARRISON AVE #102
CLEARWATER, FL 33756
Effective Date    04/22/2020
 
Contact ANDREW J HUPP
 
Phone (727) 210-1900
 
Email AHUPP@ONEOAKDEV.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
5 10000 Vehicular Diesel (D) 02/01/2004 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
(O) Tight fill
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
6 2000 Vehicular Diesel (D) 04/01/2014 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
  (F) Double wall (J) Monitor piping/liner space
 
 
Tank Tank Size Content Installed Placement Status
7 10000 Unleaded Gas (B) 07/01/2019 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel   (X) No piping associated w/tank (Q) Visual inspection of ASTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
1 1000 Vehicular Diesel (D) 07/01/1983 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(N) Flow shut-Off
  (F) Double wall (E) Monitor UST/liner space
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
2 1000 Unleaded Gas (B) 07/01/1985 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(O) Tight fill
  (B) Steel/galvanized metal
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(4) Visual inspect dispenser liners
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
3 3000 Unleaded Gas (B) 02/01/1994 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(O) Tight fill
  (B) Steel/galvanized metal
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(4) Visual inspect dispenser liners
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
4 4000 Vehicular Diesel (D) 04/01/1994 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(O) Tight fill
  (B) Steel/galvanized metal
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(4) Visual inspect dispenser liners
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   12/23/2019 12/23/2020 AXIS SURPLUS INSURANCE COMPANY
INSURANCE   04/24/2018 04/24/2019 ADMIRAL INSURANCE COMPANY
INSURANCE   04/24/2017 04/24/2018 ADMIRAL INSURANCE COMPANY
INSURANCE   04/24/2016 04/24/2017 ADMIRAL INSURANCE COMPANY
INSURANCE   04/24/2015 04/24/2016 ADMIRAL INSURANCE COMPANY
INSURANCE   04/24/2014 04/24/2015 ADMIRAL INSURANCE COMPANY
INSURANCE   04/24/2013 04/24/2014 ADMIRAL INSURANCE COMPANY
INSURANCE   04/24/2012 04/24/2013 ENDURANCE AMERICAN SPECIALTY INS CO
INSURANCE   04/24/2011 04/24/2012 ENDURANCE AMERICAN SPECIALTY INS CO
INSURANCE   04/24/2010 04/24/2011 ZURICH-AMERICAN
INSURANCE   04/24/2009 04/24/2010 ZURICH-AMERICAN
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 10/27/2005 10/28/2005 IN-COMPLIANCE MOLLI_SA 1/0 COMPLIANCE ASSURANCE
 
DPRI 06/06/2005 06/06/2005 IN-COMPLIANCE MOLLI_SA 0/0 TERMINAL FACILITY PROJECT
 
TCR 11/05/2004 11/09/2004 IN-COMPLIANCE MOLLI_SA 1/0 COMPLIANCE ASSURANCE
 
CWOE 11/05/2004 10/28/2005 MOLLI_SA 0/0 COMPLIANCE ASSURANCE
 
NCLI 10/27/2004 11/09/2004 MOLLI_SA 0/0 COMPLIANCE ASSURANCE
 
TCI 10/22/2004 11/09/2004 SIGNIFICANT OUT-OF-COMPLIANCE MOLLI_SA 1/0 COMPLIANCE ASSURANCE
 
TIN 10/22/2004 12/20/2004 IN-COMPLIANCE MOLLI_SA 1/0 COMPLIANCE ASSURANCE
 
CWOE 08/18/2004 08/27/2004 SUMNER_C 0/0 COMPLIANCE ASSURANCE
 
TXI 08/18/2004 08/27/2004 IN-COMPLIANCE SUMNER_C 3/0 COMPLIANCE ASSURANCE
 
 Completion Notes REMOVAL OF THREE ASTS. EXISTING PIPING IS TO BE USED WITH NEW DW AST.
 
TCI 07/17/2003 07/18/2003 MINOR OUT-OF-COMPLIANCE SUMNER_C 3/0 COMPLIANCE ASSURANCE
 
 Completion Notes DOUBLE WALLED ENVIRON GEOFLEW GREEN OUTER WHITE INNER PIPING
 
NCLI 07/17/2003 07/18/2003 SUMNER_C 0/0 COMPLIANCE ASSURANCE
 
TCI 07/17/2002 07/17/2002 MINOR OUT-OF-COMPLIANCE SUMNER_C 3/0 COMPLIANCE ASSURANCE
 
NCLI 07/17/2002 07/17/2002 SUMNER_C 0/0 COMPLIANCE ASSURANCE
 
DPRI 07/17/2002 07/17/2002 SUMNER_C 3/0 TERMINAL FACILITY PROJECT
 
NCLI 04/04/2002 04/04/2002 SUMNER_C 0/0 TERMINAL FACILITY PROJECT
 
DPRI 04/04/2002 04/04/2002 MINOR OUT-OF-COMPLIANCE SUMNER_C 0/0 TERMINAL FACILITY PROJECT
 
TCR 02/22/2002 02/22/2002 IN-COMPLIANCE SUMNER_C 3/0 COMPLIANCE ASSURANCE
 
CWOE 02/22/2002 02/22/2002 SUMNER_C 0/0 COMPLIANCE ASSURANCE
 
NCLI 07/09/2001 07/09/2001 SUMNER_C 0/0 COMPLIANCE ASSURANCE
 
TCI 07/05/2001 07/09/2001 MINOR OUT-OF-COMPLIANCE SUMNER_C 3/0 COMPLIANCE ASSURANCE
 
TCI 10/25/2000 10/25/2000 IN-COMPLIANCE SUMNER_C 3/0 COMPLIANCE ASSURANCE
 
TCR 03/06/2000 03/07/2000 IN-COMPLIANCE SUMNER_C 3/0 COMPLIANCE ASSURANCE
 
CWOE 03/06/2000 03/31/2000 SUMNER_C 0/0 COMPLIANCE ASSURANCE
 
NCLI 02/11/2000 03/01/2000 SUMNER_C 0/0 COMPLIANCE ASSURANCE
 
TCI 02/11/2000 02/16/2000 MINOR OUT-OF-COMPLIANCE SUMNER_C 3/0 COMPLIANCE ASSURANCE
 
TCI 01/18/1999 03/04/1999 IN-COMPLIANCE CHRONISTER_D 3/0 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Record Document 05/18/2023 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Letter 04/12/2023 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Site Inspection 04/12/2023 Major Out of Compliance MULLIGAN_PC_1 2/0 Routine Compliance
 
Phone Conversation 04/10/2023 Satisfied MULLIGAN_PC_1 Routine Compliance
 
Phone Conversation 04/07/2023 Satisfied MULLIGAN_PC_1 Routine Compliance
 
Record Document 05/13/2021 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Letter 05/11/2021 Satisfied FABRIZIO_J Enforcement
 
Electronic Communication 03/23/2021 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Enforcement Referral 03/22/2021 Accepted MULLIGAN_PC_1 Enforcement
 
Electronic Communication 03/17/2021 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Phone Conversation 03/17/2021 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Phone Conversation 03/17/2021 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Electronic Communication 03/17/2021 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Site Inspection 12/17/2020 Major Out of Compliance MULLIGAN_PC_1 2/0 Routine Compliance
 
Electronic Communication 12/17/2020 Satisfied MULLIGAN_PC_1 Routine Compliance
 
Letter 12/17/2020 Satisfied MULLIGAN_PC_1 Non-Compliance
 
Site Inspection 12/17/2020 Major Out of Compliance MULLIGAN_PC_1 2/0 Installation
 
Letter 12/17/2020 Satisfied MULLIGAN_PC_1 Non-Compliance
 
Letter 04/23/2019 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Record Document 04/23/2019 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Electronic Communication 04/03/2019 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Record Document 02/18/2019 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Letter 01/25/2019 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Site Inspection 01/25/2019 Major Out of Compliance MULLIGAN_PC_1 2/0 Routine Compliance
 
Electronic Communication 01/14/2019 Satisfied MULLIGAN_PC_1 Routine Compliance
 
Site Inspection 09/15/2016 In Compliance ANTON_TM_1 2/0 Routine Compliance
 
Site Inspection 06/22/2015 In Compliance HECKMAN_DA_1 2/0 Installation
 
Site Inspection 06/22/2015 In Compliance HECKMAN_DA_1 2/0 Non-Compliance
 
Site Inspection 03/20/2015 Minor Out of Compliance HECKMAN_DA_1 1/0 Routine Compliance
 
Letter 03/20/2015 Satisfied HECKMAN_DA_1 Non-Compliance
 
Site Inspection 05/15/2013 In Compliance COLSON_NJ_1 1/0 Routine Compliance
 
Site Inspection 05/23/2012 In Compliance COLSON_NJ_1 1/0 Routine Compliance
 
Document Management 04/10/2012 Complete COLSON_NJ_1 Incident
 
Site Inspection 11/01/2010 In Compliance COLSON_NJ_1 1/0 Routine Compliance
 
Site Inspection 09/01/2009 In Compliance BAUER_DR_1 1/0 Routine Compliance
 
Site Inspection 09/18/2008 In Compliance BAUER_DR_1 1/0 Routine Compliance
 
Site Inspection 11/27/2007 In Compliance OSTENSEN_SA_1 1/0 Routine Compliance
 
Site Inspection 01/19/2007 In Compliance BAUER_DR_1 1/0 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
04/10/2023 7064 Minor 3.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. Monthly visual inspections should be performed at least once per month, no more than 35 days apart and must be provided at time of inspection. Submit previous logs if available. If inspections were not performed or logs are not available begin performing and recording inspections and submit logs for the next two months (May and June of 2023) to Citrus County Environmental Health.
 
04/10/2023 7002 Minor 1.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. Registration should be submitted within 10 days of a change or product. Submit registration form or use the DEP ESSA Portal to update the 10,000 gallon compartmented tank (tank 5) from diesel to B – Unleaded Gasoline (No ethanol).
 
04/10/2023 7090 Minor 3.15 Spill containment, dispenser liners and piping sumps not accessible; water and regulated substances not removed. Remove all water from dispenser 1 diesel and 2/3 non-ethanol liners and submit pictures or a work order to Citrus County Environmental Health.
 
04/10/2023 6062 Minor 2.5 Release detection devices not tested annually. Submit previous test results if available. If testing was not performed or documentation is not available perform operability testing of the Krueger leak gauges and submit results to Citrus County Environmental Health and the Southwest District Enforcement Office.
 
04/10/2023 7011 Minor 1.9 Appropriate paperwork for financial responsibility improperly completed or maintained. Financial responsibility documentation must be kept on site for the life of the system and must be provided at time of inspection. Submit financial responsibility documentation covering from 12/23/2020 – current to Citrus County Environmental Health and the Southwest District Enforcement Office.
 
04/10/2023 7089 Minor 1.11 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. Integrity testing of all below-grade dispenser liners shall be performed at least once every 3 years, no more than 36 months apart. Submit previous test results if available. If testing was not performed or documentation is not available perform integrity testing of all below-grade dispenser liners and submit results to Citrus County Environmental Health.
 
12/17/2020 5114 Minor 3.4 Shop fabricated storage tank system has a not repaired component which has or could cause a release or discharge. Replace the shear valve cross bar and mounting bracket on dispenser 2/3 (non-eth) and submit results to Citrus County Environmental Health.
 
12/17/2020 5043 SNC-B 3.23 Shop fabricated storage tank system not installed with a spill containment system at each tank fill connection. Does not meet performance requirements. All storage tanks shall be installed with a spill containment system at each storage tank fill connection. Install a registered, approved, spill containment device on the 2,000 gallon diesel tank. Perform integrity testing of the spill bucket at time of installation. Submit pictures or a work order showing a spill bucket was added along with the name of the product or EQ information and integrity testing to Citrus County Environmental Health.
 
12/17/2020 5042 SNC-B 3.22 Failure to provide approved overfill protection for shop fabricated tank systems. Add overfill protection to the 2,000 gallon non-eth tank and perform operability testing on the overfill devices on all 3 tanks. Submit results to Citrus County Environmental Health.
 
12/17/2020 5093 SNC-A 3.6 Shop fabricated storage tank systems not provided with a release detection method to detect a new release from any portion of the system, including interstitial spaces. Any component of a storage tank system with an interstice shall have a method of interstitial monitoring which shall be conducted in accordance with this section. Interstitial monitoring can be performed with vacuum, pressure, hydrostatic (liquid-level sensing), sensors or probes, or visual release detection methods. Either add an interstitial monitoring device and perform operability testing at time of installation or gain access to an interstitial monitoring port to manually check that the interstice is dry. Submit pictures or a work order to Citrus County Environmental Health.
 
12/17/2020 5060 SNC-B 3.33 Valves not installed as required for small diameter integral piping. Any storage tank system, regardless of the date of installation of the storage tank system, located at an elevation that produces a gravity head on small diameter integral piping positioned below the product level in the tank must be installed and maintained with an isolation block valve. The valve should be installed as close as possible to the storage tank before the anti siphon device. Install an in line isolation block valve as close as possible to the storage tank before the anti siphon device and submit pictures or a work order to Citrus County Environmental Health.
 
12/17/2020 5001 Minor 1.1 For a new system, Registration Form not submitted. For facilities with existing registered storage tank systems, a completed Registration Form shall be submitted in electronic or paper format to the Department no later than seven days prior to regulated substances being put into any new storage system. A registration form was provided with the inspection report, either add the tank to the registration using the attached form or the DEP ESSA Portal and inform Citrus County Environmental Health when registration has been updated.
 
12/17/2020 5057 SNC-B 3.5 Pressurized small diameter piping not installed with line leak detectors and meeting requirements. All pressurized small diameter integral piping installed prior to January 11, 2017, that is in contact with the soil must be installed with line leak detectors meeting the requirements of paragraph 62-762.601(4)(b), F.A.C., by January 11, 2018. The line leak detectors must be tested annually at intervals not exceeding 12 months in accordance with paragraph 62-762.601(1)(b), F.A.C. Install line leak detectors on any lines that contain underground piping and perform operability testing at time of installation. Submit repair documentation and test results to Citrus County Environmental Health.
 
12/17/2020 5044 Minor 3.24 Fillbox covers not marked according to requirements for shop fabricated tank systems. Fillbox covers shall be marked or the fill connection tagged and facility signage shall be prominently displayed in accordance with Using the API Color-Symbol System. Either add product labeling or API Color-Symbol labeling to the new 10,000 gallon non-eth tank and submit pictures or a work order to Citrus County Environmental Health.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
07/24/1997   COMPLETED 7 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE